HomeMy WebLinkAbout20170109PAC to Staff 23, 28 Supplemental.pdfROCKY MOUNTAIN
POWER
A DIVISION OF PACIFICORP
January 9, 201 7
Diane Holt
Idaho Public Utilities Commission
472 W. Washington
Boise, ID 83702-5918
RE: ID PAC-E-16-13
IPUC 2nd Set Data Request (8-35)
201 South Main, Suite 2300
Salt Lake City, Utah 84111
Please find enclosed Rocky Mountain Power's 1st Supplemental Responses to IPUC Data
Requests 23 and 28. Also provided is Attachment IPUC 28 1st Supplemental.
If you have any questions, please feel free to call me at (801) 220-2963.
Sincerely,
J. Ted Weston
Manager, Regulation
PAC-E-16-13 / Rocky Mountain Power
January 9, 2017
IPUC 2nd Set Data Request 23 -1st Supplemental
IPUC Data Request 23
For each of the different line extension types over the past ten years, please
provide the number of line extensions in Idaho that had none, one, two, three,
four, or more than four additional customers connecting to it within the five-year
refund period.
1st Supplemental Response to IPUC Data Request 23
2007 through 2016
Customer Class COM IND IRG RES
Line Extensions* 1,067 7 586 110
*Does not include service-drop only Extensions
2007 through 2016
Number of customers who received the
indicated number of refunds, by
Customer Class
Refunds received COM
1
2
3
4
Recordholder: Rob Stewart
Sponsor: Rob Stewart
7
1
0
0
IND IRG
0 2
0 0
0 1
0 0
RES Unknown
14 3
2
1
0
Grand Total
1,770
Total No. of
Customers
26
3
2
0
PAC-E-16-13 I Rocky Mountain Power
January 9, 2017
IPUC 2nd Set Data Request 28 -1st Supplemental
IPUC Data Request 28
Please provide a list of all line extensions made in the Idaho jurisdictional area for
the past five years. For each line extension, include the following:
(a) description of the applicant, such as residential subdivision, single residence,
duplex, commercial, industrial, irrigation, or other;
(b) whether the line extension was overhead or underground;
( c) voltage, phase, and length of the line extension;
( d) actual cost of the line extension;
( e) net amount paid by the applicant to the Company for the extension;
(f) amount of allowances and refunds granted to the applicant for the extension;
(g) if the Company, a contractor, or the customer installed the line;
(h) total the dollar amounts by year.
1st Supplemental to IPUC Data Request 28
The Company's line extension data is maintained by the following classifications
Commercial, Industrial, Irrigation, and Residential. Line extensions for
Residential subdivisions are not tracked separately. The Company databases do
not contain customer specific information whether a line extension is overhead or
underground, voltage, phase, length of line, or who built the line. To get that
information would necessitate manually reviewing each individual job.
Please refer to Attachment IPUC 28 1st Supplemental, which is an excel
workbook with two sheets.
a. The sheet labeled "2011-2015 Meter Sets" provides all meter sets by years
broken into line extensions, and temporary and service only connections.
It also indicates how many of these were for line extensions contained in
the contracts database.
b. Not available as discussed above.
c. Not available as discussed above.
d. The sheet labeled "Job Costs" has the costs of the line extensions in the
contracts database, as well as the customer advances ( e ), and allowances
(f).
e. Seed.
f. Seed. for the allowances, and response to Data Request IPUC 30 for the
refunds.
g. Once a line is built the database does not identify if the Company built it
or if it was applicant built. The vast majority of extensions in Idaho, if not
all, are Company built.
h. Seed.
Recordholder: Rob Stewart
P AC-E-16-13 I Rocky Mountain Power
January 9, 201 7
IPUC 2nd Set Data Request 28 -1st Supplemental
Sponsor: Rob Stewart