Loading...
HomeMy WebLinkAbout20161206Staff 8-35 to PAC.pdfBRANDON KARPEN DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, IDAHO 83720-0074 (208) 334-0357 IDAHO BAR NO. 7956 Street Address for Express Mail: 472 W. WASHINGTON BOISE, IDAHO 83702-5918 Attorney for the Commission Staff P. -cEIVED "Q '.ff"l\=T -5 PH 2: 20 i ii\J t.,.. ..... V BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION OF ) PACIFICORP OBA ROCKY MOUNTAIN ) POWER FOR AUTHORITY TO MODIFY ) ELECTRIC SERVICE REGULATION NO. 12 ) RELATED TO LINE EXTENSION ) ALLOWANCES. ) ) ) __________________ ) CASE NO. PAC-E-16-13 SECOND PRODUCTION REQUEST OF THE COMMISSION STAFF TO ROCKY MOUNTAIN POWER The Staff of the Idaho Public Utilities Commission, by and through its attorney of record, Brandon Karpen, Deputy Attorney General, requests that Rocky Mountain Power provide the following documents and information as soon as possible, but no later than TUESDAY, DECEMBER 27, 2016. This Production Request is to be considered as continuing, and Rocky Mountain Power is requested to provide, by way of supplementary responses, additional documents that it or any person acting on its behalf may later obtain that will augment the documents or information produced. Please provide answers to each question, supporting workpapers that provide detail or are the source of information used in calculations, and the name, job title and telephone number of the person preparing the documents. Please identify the name, job title, location and telephone number of the record holder. SECOND PRODUCTION REQUEST TO ROCKY MOUNTAIN POWER 1 DECEMBER 6, 2016 In addition to the written copies provided as response to the requests, please provide all Excel and electronic files on CD with formulas activated. REQUEST NO. 8: From the following Section addressed in Regulation 12, please provide one representative example from each line extension type using actual customer installation information. If no actual examples are available, please provide representative hypothetical examples. For each example, please explain in detail the differences in methodology and show any cost difference from the current policy to the proposed approach identified in the Company filing. Further, if there is any affect to the existing ratepayers, quantify the cost difference and show how it would affect the customer class. Please provide workpapers in Excel format with formulae intact. a. Section 2 -Residential Extensions 1. Standard Residential 1. Overhead Service 2. Underground Service 11. Remote Service 1. Overhead Service 2. Underground Service 111. Three Phase Residential Service 1v. Transformation Facilities v. Underground Extensions REQUEST NO. 9: From the following Section addressed in Regulation 12, please provide one representative example from each line extension type using actual customer installation information. If no actual examples are available, please provide representative hypothetical examples. For each example, please explain in detail the differences in methodology and show any cost difference from the current policy to the proposed approach identified in the Company filing. Further, if there is any affect to the existing ratepayers, quantify the cost difference and show how it would affect the customer class. Please provide workpapers in Excel format with formulae intact. a. Section 3 -Non-Residential Extensions i. Extension Allowances -Delivery at 46,000 Volts and above ii. Extension Allowances -Delivery at less than 46,000 Volts SECOND PRODUCTION REQUEST TO ROCKY MOUNTAIN POWER 2 DECEMBER 6, 2016 1. Less than 1,000 kV A 2. 1,000 kV A or Greater 3. Additional Capacity 111. Additional Customers, Advances and Refunds 1v. Reduction in Contract Capacity or Demand v. Underground Extensions v1. Other Requirements v11. Street Lighting REQUEST NO. 10: From the following Section addressed in Regulation 12, please provide one representative example from each line extension type using actual customer installation information. If no actual examples are available, please provide representative hypothetical examples. For each example, please explain in detail the differences in methodology and show any cost difference from the current policy to the proposed approach identified in the Company filing. Further, if there is any affect to the existing ratepayers, quantify the cost difference and show how it would affect the customer class. Please provide workpapers in Excel format with formulae intact. a. Section 4 -Extensions to Non-Residential and Residential Planned Developments 1. General 11. Allowances and Advances u1. Refunds 1v. Underground Extensions REQUEST NO. 11: From the following Section addressed in Regulation 12, please provide one representative example from each line extension type using actual customer installation information. If no actual examples are available, please provide representative hypothetical examples. For each example, please explain in detail the differences in methodology and show any cost difference from the current policy to the proposed approach identified in the Company filing. Further, if there is any affect to the existing ratepayers, quantify the cost difference and show how it would affect the customer class. Please provide workpapers in Excel format with formulae intact. SECOND PRODUCTION REQUEST TO ROCKY MOUNTAIN POWER 3 DECEMBER 6, 2016 a. Section 5 -Extension Exceptions 1. Applicant Built Extensions 11. Duplicate Service Facilities 111. Emergency Service 1v. Highly Fluctuating Loads v. Temporary Service v1. Line Capacity in Excess of that Required REQUEST NO. 12: From the following Section addressed in Regulation 12, please provide one representative example from each line extension type using actual customer installation information. If no actual examples are available, please provide representative hypothetical examples. For each example, please explain in detail the differences in methodology and show any cost difference from the current policy to the proposed approach identified in the Company filing. Further, if there is any affect to the existing ratepayers, quantify the cost difference and show how it would affect the customer class. Please provide workpapers in Excel format with formulae intact. a. Section 6 -Relocation or Replacement of Facilities 1. Relocation of Facilities ii. Local Governments REQUEST NO. 13: For each of the examples provided by the Company for Staff Production Request Nos. 8 through 12, please provide the sources of information used to determine the cost estimate amounts. REQUEST NO. 14: Please provide copies of all line extension policies currently in effect for each of the state jurisdictions in which Rocky Mountain Power/PacifiCorp serves. REQUEST NO. 15: On page 2 of Robert Stewart's testimony, he states the proposed changes to the line extension allowances are designed to be revenue neutral. Please explain what is meant by the term "revenue neutral." REQUEST NO. 16: Please provide an explanation of the method, the calculation, and the sources of data the Company used to determine the allowances for residential, non- SECOND PRODUCTION REQUEST TO ROCKY MOUNTAIN POWER 4 DECEMBER 6, 2016 residential , non-residential and residential planned developments. Please provide workpapers in Excel format with formulae intact. REQUEST NO. 17: For each of the allowance types in Staff Production Request No. 16 above, please explain and demonstrate how the allowance reflects the embedded cost in base rates. Please provide workpapers in Excel format with formulae intact. REQUEST NO. 18: Please provide workpapers with formulae intact used by the Company to establish the amounts proposed for the distribution and transmission facilities charges as specified on Sheet 300.3 of the proposed tariff. REQUEST NO. 19: Please explain how engineering costs are billed to new customers? Are the costs calculated for each specific job? Are the costs shown separately on the customer's bill, or are they included in a general overhead? If the costs are included in a general overhead, what is the general overhead rate and how much of the general overhead rate do engineering costs represent? REQUEST NO. 20: Please describe what constitutes a large, complex or speculative line extension as discussed on Sheet 12R.1 of the proposed tariff? REQUEST NO. 21: Are customers billed for line extension costs based on the estimated costs or actual costs, and how is the cost reflected in journal entries? Please explain. REQUEST NO. 22: Does the Company compile and record the actual construction costs once construction has been completed? Please explain. REQUEST NO. 23: For each of the different line extension types over the past ten years, please provide the number of line extensions in Idaho that had none, one, two, three, four, or more than four additional customers connecting to it within the five-year refund period. REQUEST NO. 24: Do facilities charges change (increase or decrease) for a line extension if additional customers connect? Please explain. SECOND PRODUCTION REQUEST TO ROCKY MOUNTAIN POWER 5 DECEMBER 6, 2016 REQUEST NO. 25: How are costs for design, specifications, material standards, and inspections as discussed in Section 5( a)(3) on sheet 12R.11 estimated? Does an applicant pay these costs if the Company builds the line instead? If so, is the applicant billed explicitly or through an overhead charge? REQUEST NO. 26: Under Section 5(e)(3) on sheet 12R.13, how long would a customer for temporary service be required to pay a contract minimum billing? Please explain. REQUEST NO. 27: Does a customer under Section 5(e) on sheet 12R.13, which requests temporary service from an existing line extension pay the same amount for sharing the line as a permanent customer would pay? Please explain. REQUEST NO. 28: Please provide a list of all line extensions made in the Idaho jurisdictional area for the past five years. For each line extension, include the following: a. description of the applicant, such as residential subdivision, single residence, duplex, commercial, industrial, irrigation, or other; b. whether the line extension was overhead or underground; c. voltage, phase, and length of the line extension; d. actual cost of the line extension; e. net amount paid by the applicant to the Company for the extension; f. amount of allowances and refunds granted to the applicant for the extension; g. if the Company, a contractor, or the customer installed the line; h. total the dollar amounts by year. REQUEST NO. 29: If the Company's proposed line extension policy is adopted and implemented, how would the Company's annual revenue requirement be affected? Please explain in detail the effect to each customer class served by the Company. Provide supporting information to quantify the effect. REQUEST NO. 30: Please provide a list of the refunds issued for line extensions for each of the past five years. For each refund type, show the amount of the refund, the refund recipient type (i .e. residential, farm, commercial, industrial, other), and the cumulative amount refunded to each recipient in relation to the total amount the recipient paid for his line extension. SECOND PRODUCTION REQUEST TO ROCKY MOUNTAIN POWER 6 DECEMBER 6, 2016 REQUEST NO. 31: Please describe in detail the Company's process for tracking refunds of a refundable advance. Please provide the methodology used by the Company to calculate facilities charges for line extension customers. REQUEST NO. 32: Please describe how the Company determines if a line extension is to be considered remote service. REQUEST NO. 33: By year for CY 2011-2015, please provide the following for remote service line extensions in Idaho: (a) number ofremote service line extensions constructed; (b) average length of line extensions; ( c) total (gross) cost of line extensions; ( d) total amount of allowances applied towards line extension costs. REQUEST NO. 34: How does the Company monitor population density in remote service areas to ensure customers are no longer considered "remote service" when the population density reaches one person per half mile? REQUEST NO. 35: Please provide a sample of a residential remote service minimum billing contract. ·~ DATED at Boise, Idaho, this C:, day of December 2016. Technical Staff: Rick Keller/8-30 Johnathan Farley/31-35 i:umisc:prodreq/pace 16.13bkrkjf prod req 2 SECOND PRODUCTION REQUEST TO ROCKY MOUNTAIN POWER 7 DECEMBER 6, 2016 CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS 6TH DAY OF DECEMBER 2016, SERVED THE FOREGOING SECOND PRODUCTION REQUEST OF THE COMMISSION STAFF TO ROCKY MOUNTAIN POWER, IN CASE NO. PAC-E-16-13, BY MAILING A COPY THEREOF, POSTAGE PREPAID, TO THE FOLLOWING: TED WESTON DANIEL E SOLANDER ROCKY MOUNTAIN POWER 1407 WEST NORTH TEMPLE STE 330 SALT LAKE CITY UT 84116 E-MAIL: ted.weston@pacificorp.com daniel.solander@pacificorp.com DAT A REQUEST RESPONSE CENTER E-MAIL ONLY: datareq uest@pacificorp.com CERTIFICATE OF SERVICE