Loading...
HomeMy WebLinkAbout20161013PAC to PIIC 1-8.pdfROCKY MOUNTAIN POWER A DIVISION OF PACIFICOAP October 13, 2016 Ronald L. Williams Williams Bradbury, P.C. 1015 W. Hays St. Boise ID, 83 702 Bradley G. Mullins 333 S.S. Taylor, Suite 400 Portland, OR 97204 RE: ID PAC-E-16-12 PIIC 1st Set Data Request (1-8) 20 I South Main, Suite 2300 Salt Lake City, Utah 84111 Please find enclosed Rocky Mountain Power's Responses to PIIC 1st Set Data Requests 1-7. The Company's response to PIIC Data Request 8 is forthcoming. Also provided are Attachments PIIC 1 and 6. Provided on the enclosed Confidential CD are Confidential Attachments PIIC 7-(1-2). Confidential information is provided subject to non-disclosure agreement signed for this proceeding. If you have any questions, please feel free to call me at (801) 220-2963. Sincerely, J. Ted Weston Manager, Regulation Enclosures C.c.: Camille Christen/IPUC ~~~~~~~~~~~ Jean Jewell/IPUC ~~=~~===~- P AC-E-16-12 I Rocky Mountain Power October 13, 2016 PIIC 1st Set Data Request 1 PUC Data Request 1 Please provide electronic copies of the Company's annual results of operations for the Idaho jurisdiction for the period ending December 31, 2015. Response to PUC Data Request 1 Please refer to Attachment PIIC 1 for copies of the Company's filed RAM and JAM models for the December 2015 Idaho Results of Operations report. Recordholder: Tamuna Kobelashvili Sponsor: Ted Weston PAC-E-16-12 I Rocky Mountain Power October 13, 2016 PIIC I st Set Data Request 2 PIIC Data Request 2 Please provide the Company's semi-annual results of operations for the Idaho Jurisdiction for the period ending June 30, 2016, if available. Response to PIIC Data Request 2 The Company files results of operations on an annual basis in Idaho. Therefore, results of operations for the Idaho Jurisdiction for the period ending June 30, 2016, have not been prepared. Recordholder: Tamuna Kobelashvili Sponsor: Ted Weston PAC-E-16-12 / Rocky Mountain Power October 13, 2016 PIIC 1st Set Data Request 3 PIIC Data Request 3 Please state the Company's actual, annual return on equity for the Idaho jurisdiction for the calendar periods 2013,2014, and 2015. Please provide this value based on normalized and as booked results. Please also provide a brief description of how the Energy Cost Adjustment Mechanism revenues are reflected in establishing the respective return on equity values. Response to PIIC Data Request 3 Calendar Year Adjusted Idaho ROE 2013 7.158% 2014 7.446% 2015 9.385% The Energy Cost Adjustment Mechanism (ECAM) revenues or expenses are not reflected in establishing the respective return on equity values. The ECAM amounts are calculated using the actual net power costs allocated to Idaho customers. However, Results of Operations Report include revenues, net power costs, and factors that are normalized for temperature, hydro, and wind production. Therefore, the revenues received from the ECAM do not align with the revenues and expenses included in the Results of Operations report, and adding the accruals to the Report without accounting for these differences will not produce a meaningful result. Recordholder: Grant Bagby Sponsor: Ted Weston PAC-E-16-12 I Rocky Mountain Power October 13, 2016 PIIC 1st Set Data Request 4 PUC Data Request 4 Please provide accounting work papers used to calculate the current depreciation deferral balance included in the Company's most recently filed results of operations for the Idaho jurisdiction. Response to PIIC Data Request 4 Please refer to IPUC Data Responses 1 and 5 and their attachments. Recordholder: Kent Ipson Sponsor: Ted Weston PAC-E-16-12 I Rocky Mountain Power October 13, 2016 PIIC 1st Set Data Request 5 PIIC Data Request 5 Please provide accounting work papers used to estimate the $6.9 million balance for the depreciation deferral balance through December 31, 2017, as identified in footnote 4 of the Company's Application. Response to PIIC Data Request 5 Please refer to IPUC Data Response 1 and Attachment IPUC 1. Recordholder: Kent Ipson Sponsor: Ted Weston PAC-E-16-12 I Rocky Mountain Power October 13, 2016 PIIC 1st Set Data Request 6 PIIC Data Request 6 Please provide work papers used to calculate the figures in the Direct Testimony of Mr. Wilding, Page 4, Table 2. Response to PIIC Data Request 6 Please refer to Attachment PICC 6. Recordholder: Michael Wilding Sponsor: Michael Wilding PAC-E-16-12 I Rocky Mountain Power October 13, 2016 PUC 1st Set Data Request 7 PIIC Data Request 7 Please provide the Company's actual net power costs (NPC) for the periods 2015 and 2016 (through the most recent month available). Please provide this information including the underlying accounting database entries and fuel supply cost calculations. Response to PIIC Data Request 7 Please refer to Confidential Attachment PUC 7 -1, which provides the actual net power costs (NPC) report, the database entries along with the mapping, and the fuel supply cost calculations for calendar year 2015 (January through December). Please refer to Confidential Attachment PUC 7 -2, which provides the actual net power costs (NPC) report, the database entries along with the mapping, and the fuel supply cost calculations for calendar year 2016 (January through July). Confidential information is provided subject to non-disclosure agreement signed for this proceeding. Recordholder: Michael Wilding Sponsor: Michael Wilding