Loading...
HomeMy WebLinkAbout20160216PAC to Staff 1-5.pdfROCKY MOUNTAIN PCNA'ER RECEIVED ?01[ FtB tG AH 8: ZT u'',, l?f$*rt**,f, I 8r, o * 1407 W North Temple, Suite 330 Salt Lake City, Utah 84'116 February 15,2016 Jean Jewell Idaho Public Utilities Commission 472W. Washington Boise,ID 83702-5918 j ean..i ewell@Fuc.idaho. eov (C) RE: ID PAC-E-16-02 IPUC I't Set Data Request (1-5) Please find enclosed Rocky Mountain Power's Responses to IPUC Data Requests l-5. Also provided are Attachments IPUC 1(a), 1(b), 1(c), and 5. If you have any questions, please feel free to call me at (801) 220-2963. Sincerely, J,T/o( bc+m/1.^, J. Ted Weston Manager, Regulation PAC-E-16-02 / Rocky Mountain Power February 15,2016 IPUC Data Request 1 IPUC Data Request I Please provide executable electronic work papers and spread sheets for Attachments A, B and C. Response to IPUC Data Request I Please refer to Attachments IPUC l(a), 1(b), and 1(c) for work papers and spread sheets for Attachments A, B, and C, respectively. Recordholder: Esther Giezendanner Sponsor: Bill Comeau PAC-E-16-02 / Rocky Mountain Power February 15,2016 IPUC Data Request 2 IPUC Data Request 2 Attachment D in Rocky Mountain Power's Application shows a0.60Yo increase for Schedules24 and 35A. However, Attachment A does not include either of these two Schedules. Please explain why these Schedules are not included in Attachment A. Response to IPUC Data Request 2 Attachment A does not include these schedules because there were no customers on Schedules 24 and 35A in the test period. There are also no customers currently on Schedules 24 and 35A. Recordholder: James Zharrg Sponsor: Joelle Steward PAC-E-16-02 / Rocky Mountain Power February 15,2016 IPUC Data Request 3 IPUC Data Request 3 Please provide the average number of Idaho customers, if any, for both Schedules 24 md35A. Response to IPUC Data Request 3 There are currently no customers on Schedules 24 and 35A. Recordholder: James Zhang Sponsor: Joelle Steward PAC-E-16-02 / Rocky Mountain Power February 15,2016 IPUC Data Request 4 IPUC Data Request 4 Section 7 of the Application states that Wattsmart savings increased from 11,400 MWh in2014 to approximately 15,440 MWh in 2015. Please provide the weighted average measure life for the energy savings produced by the Wattsmart program. Response to IPUC Data Request 4 The weighted average measure life for energy savings produced by the wattsmart program is currently unavailable. This calculation is performed for the demand- side management (DSM) annual report, due May lst, and is estimated to be available mid-April. The Company can provide this information prior to May lst once it is ready if that is preferable. Recordholder: Esther Giezendanner Sponsor: Bill Comeau PAC-E-16-02 / Rocky Mountain Power February 15,2016 IPUC Data Request 5 IPUC Data Request 5 Please provide the monthly budget for each program for 2016 and20t7. Response to IPUC Data Request 5 Please refer to Attachment IPUC 5. Note: the2017 budget has not been finalized, and currently only provides an annual, not monthly, budget estimate for each program. Recordholder: Esther Giezendanner Sponsor: Bill Comeau