RE: ID PAC-E-16-02
IPUC I't Set Data Request (1-5)
Please find enclosed Rocky Mountain Power's Responses to IPUC Data Requests l-5. Also
provided are Attachments IPUC 1(a), 1(b), 1(c), and 5.
If you have any questions, please feel free to call me at (801) 220-2963.
Sincerely,
J,T/o( bc+m/1.^,
J. Ted Weston
Manager, Regulation
PAC-E-16-02 / Rocky Mountain Power
February 15,2016
IPUC Data Request 1
IPUC Data Request I
Please provide executable electronic work papers and spread sheets for
Attachments A, B and C.
Response to IPUC Data Request I
Please refer to Attachments IPUC l(a), 1(b), and 1(c) for work papers and spread
sheets for Attachments A, B, and C, respectively.
Recordholder: Esther Giezendanner
Sponsor: Bill Comeau
PAC-E-16-02 / Rocky Mountain Power
February 15,2016
IPUC Data Request 2
IPUC Data Request 2
Attachment D in Rocky Mountain Power's Application shows a0.60Yo increase
for Schedules24 and 35A. However, Attachment A does not include either of
these two Schedules. Please explain why these Schedules are not included in
Attachment A.
Response to IPUC Data Request 2
Attachment A does not include these schedules because there were no customers
on Schedules 24 and 35A in the test period. There are also no customers currently
on Schedules 24 and 35A.
Recordholder: James Zharrg
Sponsor: Joelle Steward
PAC-E-16-02 / Rocky Mountain Power
February 15,2016
IPUC Data Request 3
IPUC Data Request 3
Please provide the average number of Idaho customers, if any, for both Schedules
24 md35A.
Response to IPUC Data Request 3
There are currently no customers on Schedules 24 and 35A.
Recordholder: James Zhang
Sponsor: Joelle Steward
PAC-E-16-02 / Rocky Mountain Power
February 15,2016
IPUC Data Request 4
IPUC Data Request 4
Section 7 of the Application states that Wattsmart savings increased from 11,400
MWh in2014 to approximately 15,440 MWh in 2015. Please provide the
weighted average measure life for the energy savings produced by the Wattsmart
program.
Response to IPUC Data Request 4
The weighted average measure life for energy savings produced by the wattsmart
program is currently unavailable. This calculation is performed for the demand-
side management (DSM) annual report, due May lst, and is estimated to be
available mid-April. The Company can provide this information prior to May lst
once it is ready if that is preferable.
Recordholder: Esther Giezendanner
Sponsor: Bill Comeau
PAC-E-16-02 / Rocky Mountain Power
February 15,2016
IPUC Data Request 5
IPUC Data Request 5
Please provide the monthly budget for each program for 2016 and20t7.
Response to IPUC Data Request 5
Please refer to Attachment IPUC 5. Note: the2017 budget has not been finalized,
and currently only provides an annual, not monthly, budget estimate for each
program.
Recordholder: Esther Giezendanner
Sponsor: Bill Comeau