Loading...
HomeMy WebLinkAbout20141016ID Retro 102411.1.xlsDemandDiversityTable Data Table Ref Savings D Table Wattage Table Incentive Breakdown Control Output Project Output Form Check Information Project Summary Controls Input Relamp Only Lighting Equipment INPUT Project Information Help BusinessTypes ControlsCount ExistingVtable Lighting_Incent_Total LightingData LightingData OCS_kWh ProposedHtable Wattagetable YesNo <10 W (nominal) CFL hardwire fixture > 10, < 20 W (nominal) CFL hardwire fixture > 20 W (nominal) CFL hardwire fixture Exit Signs LED Exit sign - 1 or 2 faced Interior Fluorescent Delamping Delamp 2->1 (replace 2-T12 & 1B with 1-T8 & 1 EB) Delamp 3->2 or 1 (rplc 3-T12 & 2B w/ 2 or 1-T8 & 1 EB) Delamp 4->3 (replace 4-T12 & 2B with 3-T8 & 1 EB) Delamp 4->2 or 1 (rplc 4-T12 & 2B w/ 2 or 1-T8 & 1 EB) T5 Fixtures High Bay with T5 lamps and electronic ballast Lighting Controls Occupancy Sensor (per sensor), 200-1000 W controlled Photocell (per sensor) Time Clock (per control) Dimmable ballasts (per ballast) Custom Measures Total Fixtures: TOTAL INCENTIVE: CR No. ZIP SOURCE CODE AUDITED BY: A - Activity MAIN SUB C - Control Number U - User Function O - Other User Info 4LF40T12 Mag 3LF40T12Mag 2LF40T12Mag 1LF40T12Mag Proposed 4LF32T8Elec 3LF32T8Elec 2LF32T8Elec 1LF32T8Elec 4LF96T12Mag 3LF96T12Mag 2LF96T12Mag 1LF96T12Mag 4LF96T8Elect 3LF96T8Elect 2LF96T8Elect 1LF96T8Elect 4LF96T12HOMag 2LF96T12HOMag 1LF96T12HOMag 3LF96T12HOMag 4LF96T8HOElect 3LF96T8HOElect 2LF96T8HOElect 1LF96T8HOElect Project Name State / Prov. Operation Schedule Email ID No Incandescent200W Incandescent300W Exit Incan Exit FL CFL2W CFL5W CFL7W CFL10W CFL12W CFL14W CFL15W CFL17W CFL19W CFL20W CFL22W CFL25W CFL27W CFL26W CFL30W CFL36W CFL42W ExitLED MV40 MV50 MV75 MV100 MV175 MV250 MV400 MV1000 MH32 MH70 MH100 MH175 MH250 MH400 MH1000 MHPS250 4LF28T5 1LF55T5HO 2LF55T5HO 3LF55T5HO 4LF55T5HO Induction55W Induction65W Induction75W Induction95W Induction150W Induction165W CMH100W CMH70W Existing Ref --4ft FL-- KW Total Energy Savings Savings Dollars kWh KW Custom Wattage Proposed Fixtures Custom Wattage Payback / Incentive Incentive Payback with Incentive Existing Fixtures Existing kWh Proposed kWh Project Cost Pre-Incentive Project Information / Existing Messages - Error and Status --8ft FL-- --8ft FL HO-- --Exit Signs-- --Metal Halide-- --Metal Halide Pulse Start-- --High Pressure Sodium-- --T5 FL-- --T5 FL HO-- --Incandescent-- --Mercury Vapor-- 3LF28T5 Project # Final Preliminary Incentive Type Fixture Type (E) Fixture Type (P) Qty. (E) Qty. (P) Prescriptive Incentive Net Cost With Incentive %Savings City State Title Phone Zip Code Business Type Hours of Operation Mon Tue Wed Thur Fri Sat Sun A B C Total hrs per year Watts Location Line Item Cost Fluorescent Interior Lighting Qty SubTotal 4' - 1 or 2 lamp(s) T8 + 1 EB 4' - 3 or 4 lamp(s) T8 + 1 EB Error and Status Messages Pre- Incentive With Incentive Paybacks and Incentive CustomWatts Total Controlled Watts Location Proposed Controls Cost Incentive / Payback Fixture Description Dual Tech Sensor Total Controls Custom Fixtures Project information Sheet Status Sentry # CHECK REQUEST INFORMATION Account # 8' - 1, 2, 3 or 4 lamps T8 + 1 EB 8' - 1, 2, 3 or 4 T8/HO lamps + EB (max 2) Compact Fluorescent Interior Lighting Energy Efficiency Project Information Fax 1LF96T12VHO 2F96T12VHO 3F96T12VHO 4F96T12VHO Prem 2T8 3100 lum 0.8 BF Prem 3T8 3100 lum 0.8 BF MHPS100 MHPS150 MHPS175 MHPS300 MHPS320 MHPS450 MHPS750 Prem 1T8 3100 lum 0.8 BF CFL10W/screw-in CFL12W /screw-in CFL15W/screw-in CFL17W/screw-in CFL14W/screw-in CFL19W/screw-in CFL20W/screw-in CFL22W/screw-in CFL25W/screw-in CFL26W/screw-in CFL27W/screw-in CFL2W/screw-in CFL30W/screw-in CFL36W/screw-in CFL42W/screw-in CFL5W/screw-in CFL7W/screw-in CFL10W/Hardwire CFL12W /Hardwire CFL14W/Hardwire CFL15W/Hardwire CFL17W/Hardwire CFL19W/Hardwire CFL20W/Hardwire CFL22W/Hardwire CFL25W/Hardwire CFL26W/Hardwire CFL27W/Hardwire CFL2W/Hardwire CFL30W/Hardwire CFL36W/Hardwire CFL42W/Hardwire CFL5W/Hardwire CFL7W/Hardwire CFL42W/screw-in 2 Part Yes D E Costs Per Unit Material Labor Installed Location Information Operation Schedules Custom Custom Description / Additional Info. Office Warehouse Other Incandescent10W Incandescent15W Incandescent20W Incandescent25W Incandescent40W Incandescent50W Incandescent60W Incandescent75W Incandescent100W Incandescent120W Incandescent150W Prem 3T8 < 30W Lmp 0.8 BF Prem 4T8 <30W Lmp 0.8 BF Prem 4T8 3100 lum<0.8 BF Exit elctro/luminescent HPS100OCS HPS1000OCS HPS150OCS HPS50OCS HPS70OCS HPS200OCS HPS250OCS HPS35OCS HPS400OCS MH100OCS MH1000OCS MH175OCS MH250OCS MH32OCS MH400OCS MH70OCS MHPS100OCS MHPS150OCS MHPS175OCS MHPS250OCS MHPS300OCS MHPS320OCS MHPS400 HPS35 HPS50 HPS70 HPS100 HPS150 HPS200 HPS250 HPS400 HPS1000 1LF28T5 2LF28T5 3LF28TF MV100OCS MV1000OCS MV175OCS MV250OCS MV40OCS MV400OCS MV50OCS MV75OCS --Compact FL Hardwire-- --Compact FL Screw In-- --Compact FL 2 Piece-- --4ft FLPremium-- --8ft FL VHO-- --W/ Intergal Sensor-- Prem 6LT8 6LF32T8Elec General Tips Where drop down lists are provided (indicated by arrow), user must select from available options. Check columns on the far right-hand side (Z - AA) of INPUT pages for helpful input error messages. Contractor Information - provide if available. Lighting Equipment Input Schedule "X" is to be used for Exit signs only. Fixture Type - Existing or Proposed Assumes an energy efficient magnetic ballast baseline for existing linear fluorescent fixtures. Use best match of fixture type if available in drop down list. Best match is defined within 10% of actual fixture wattage for incandescents, HIDs, etc. Custom fixture type can be selected if fixture does not match the standard fixture types available in the drop down list. Custom Description/ Additional Information % of Project Paid by Incentive Project Summary EX Fixture Type Qty. Savings Dollars Line Item Project Status --8ft FL -- kWh KW Per Month Induction85W Induction100W Proposed fixture Control Type Total kwh Dollar Costs Savings Photocell Timeclock Sched Material Control Measure Input PIR Sensor Ultra Sonic Sensor If you see "NA" on the project output form, you have invalid entries on the Lighting Equipment Input form. Check columns AA - AZ for error messages and helpful solutions. Proposed Fixture Selecting "Custom" in Fixture Type requires a custom measure description of the proposed custom fixture. Control Output Simple Paybacks ( in years) Positve savings Dollar savings Prepared by: Project Name: Years X If you see "NA" on the project output form, you have invalid entries on the Control Input form. Check columns R - S for error messages and helpful solutions. Incentive Breakdown Direct input is not allowed to this sheet. Check Information The information on this sheet comes from the Business Name fields on the Project Information sheet. Date: Integral OCS 4' - 1 or 2 lamp(s) T12 to T8 4' - 3 or 4 lamp(s) T12 to T8 <10 W (nominal) CFL (screw - in) > 40 W (nominal) 2 piece CFL (screw - in) > 10, < 20 W (nominal) CFL (screw - in) Delamp 3->2 or 1 (rplc 3-T12 with 2 or 1-T8 ) Delamp 4->3 (replace 4-T12 with 3-T8 ) Delamp 4->2 or 1 (rplc 4-T12 with 2 or 1-T8 ) Delamp 2->1 (replace 2-T12 with 1Premium-T8 ) Delamp 3->2 or 1 (rplc 3-T12 with 2 or 1Premium-T8 ) Delamp 4->3 (replace 4-T12 with 3 Premium-T8 ) Delamp 4->2 or 1 (rplc 4-T12 with 2 or 1 Premium-T8) HID (replacing MH,MV,HPS or Incandescent) 4' - 4L Standard or Premium T8 4' - 6L Standard or Premium T8 Occupancy Sensor (per sensor), Fluorescent Interior Lighting Prem 1T8 3100 lum<0.8 BF Prem 2T8 3100 lum<0.8 BF Prem 3T8 3100 lum<0.8 BF MHPS350 MHPS350OCS sched AMOUNT: CFL48W/screw-in 2 Part CFL52W/screw-in 2 Part CFL60W/screw-in 2 Part 6LF55T5HO 6LF55T5HO/OCS 4LF55T5HO/OCS Prem 4LT8/OCS Prem 6LT8/OCS 4LF32T8Elec/OCS 6LF32T8Elec/OCS 4LF32T8ElecHO 3LF32T8ElecHO 2LF32T8ElecHO 1LF32T8ElecHO 4LF32T8ElecVHO 3LF32T8ElecVHO 2LF32T8ElecVHO 1LF32T8ElecVHO Prem 1T8 <30W Lmp 0.8 BF Prem 2T8 <30W Lmp 0.8 BF > 320 W < 400 W Metal Halide Pulse Start > 125 W < 175 W Metal Halide Pulse Start >175 W < 320 W Metal Halide Pulse Start With intrgal Occupancy Sensor (combined incentive) Integral OCS 4' - 1 or 2 lamp(s) T12 or T8 to T8 Premium (3100 Lum) MHPS400OCS MHPS450OCS MHPS750OCS 4' - 1 or 2 lamp(s) T12 or T8 to T8 Premium <30W Lmp 4' - 3 or 4 lamp(s) T12 or T8 to T8 Premium <30W Lmp <10 W (nominal) CFL Screw in fixture (with incentive) for the project is one year. If needed, incentives will be decreased to reflect a one-year payback. 2. Upgrade your lighting. 3. Submit project cost documentation including invoices with breakdown of materials and labor, and contact 4. Receive incentive check within 45 days of completion of step 3. Steps to receive an incentive: 4LF32T8Elec/Highbay 4LF32T8Elec/Highbay/OCS 6LF32T8Elec/Highbay 6LF32T8Elec/Highbay/OCS --Highbay T8-- 4 and 6 LampT5HO 4' - 4L Highbay T8 4' - 6L Highbay T8 With integral Occupancy Sensor (combined incentive) Integral Occupancy Sensor > 20 W (nominal) CFL (screw - in) Delamp 3->2 or 1 (rplc 3-T12 with 2 or 1 Premium-T8 ) Delamp 4->3 (rplc 4-T12 with 3 Premium-T8 ) Delamp 2->1 (rplc 2-T12 with 1 Premium-T8 ) Delamp 2->1 (rplc 2-T12 with 1-T8 ) Delamp 4->2 or 1 (rplc 4-T12 with 2 or 1 Premium-T8 ) HID (replacing MH, MV, HPS or Incandescent) This field may also be used to provide additional information regarding the fixture. Example: pendant mounted, lensed, parabolic. Project Output Form Common Errors and Solutions Set print area to accurately display all information in the printed form. To do this, highlight desired area to be printed, go to "file", select "print area", and choose "set print area". Proceed with printing. MHPS400- MHPS250- MHPS300- MHPS320- MHPS150- MHPS175- MHPS100- MHPS450- MHPS750- Project Name and Site Address Lori Hansen Craig Bruderer Brent Barker 1LF96T8VHOElect 2LF96T8VHOElect 3LF96T8VHOElect 4LF96T8VHOElect 1. Sign a Rocky Mountain Power incentive agreement before you order equipment. Rocky Mountain Power or your Energy Efficiency Alliance vendor for a post-installation inspection. Account Number can be found on the customer's monthly Rocky Mountain Power bill. Project # will be provided by Rocky Mountain Power. Wattage 3LF55T5HO/OCS 8LF32T8Elec/Highbay-- 8LF32T8Elec/Highbay/OCS HPS750 CMH20 CMH39 CMH50 CMH70 CMH95 CMH120 CMH150 CMH200 CMH250 CMH300 CMH320 CMH350 CMH400 MH750 Automotive Facilty Convention Center Courthouse Dining:Bar Lounge / Leisure 8' - 1, 2, lamps T12 Payee Contact Information (if different from above) LED or electro/luminescent Exit sign - (1 or 2 faced) ~ This document has been copied from PacifiCorp version and will not approved Altered from original Costs $ Project Manager: Pre - Inspection Post - Inspection 5LF32T8Elec/Highbay- --Ceramic Metal Halide -- MV700 Labor Total project Other Demand Diversity Table LPD Calculated Demand Diversity Factor IsError IsCustom T5 interior fixtures - 2 lamp ≤100W Ceramic Metal Halide ≤320W Ceramic Metal Halide ≤400W Ceramic Metal Halide < 400 W Metal Halide Pulse Start 4' - 3 or 4 lamp(s) T12 or T8 to T8 Premium (3100 Lum) > 175 W ≤ 320 W Metal Halide Pulse Start > 320 W ≤ 400 W Metal Halide Pulse Start ≤ 750 W Metal Halide Pulse Start < 750 W Metal Halide Pulse Start 4' - 8 lamp T8 + EB(s) (High Bay) 4' - 4, 5 or 6 lamps T8 + EB(s) (High Bay) ≤ 30 W T8 lamp Summed incentive 50% Capped incentive Lighting incentives are capped at 50% of eligible energy efficiency project costs, and the minimum simple payback The incentive and energy savings above are estimates only. Project Cost Per Year Project Total invoices(by Rocky Mountain Power). Lighting Fixture Retrofit Controls Relamp Only: ≥ 30 W T 8 Lamp Energy Savings The simple payback with incentive is the net project cost divided by the annual electric cost savings (dollar savings). Assigned Incentive Information Name Street City Zip 4,5 and 6 Lamp T5HO 8' - 1, 2, 3 or 4 lamp(s) T12 to 8' T8 8' - 1, 2, lamp(s) T12 to 4' - 2, 3 or 4 lamp T8 Premium 8' - 1, 2, 3 or 4 T12 HO/VHO lamp(s) to 8' T8 Date 4LF55T5HO- 6LF55T5HO- 4LF32T8Elec/Highbay- 6LF32T8Elec/Highbay- The actual incentive paid will be determined based on the results of a post-installation inspection and review of project MHPS350- Business name must be provided even if it is the same as the Project Name/Address. The Business name info. is used to direct the incentive payment to the proper contact and address unless it is assigned via the agreement. Rate Schedule can be found on the customer's monthly Rocky Mountain Power bill. At least one Schedule of Operation must be developed with the number of hours per day. Account Manager Chris Helmers Chris Kanoff The Open Major Holiday field is mandatory for kWh savings and incentives to be calculated. Location description should provide adequate info. for others (customers/contractor/utility representative) to identify the area affected by the lighting retrofit. Schedule is selected from operation schedule (drop down list) you created on project info. page appropriate for this location. Use best match of fixture type if available in drop down list. Best match is defined within 10% of actual fixture wattage for incandescents, HIDs, etc. For example, If no exact match for an incandescent lamp, take the conservative route and select the next "lowest" wattage for "existing" fixtures. Select the next "highest" wattage for a "proposed" CFL fixture. Clarify the actual situation in the "description" column. Proposed fixtures listed as prescriptive baseline fixtures are not eligible for incentive. (See applicable 115 tariffs for a list of prescriptive baseline fixtures) Dining: Cafeteria / Fast Food Dining: Family Dormitory Exercise Center Gymnasium Hospital / Healthcare Hotel Library Manufacturing Facility Motel Motion Picture Theater Multi-Family Museum Parking Garage Penitentiary Performing Arts Theater Police/Fire Station Post Office Religious Building Retail School / University Sports Arena Town Hall Transportation Workshop Demand Diversity Incandescent90W 5LF55T5HO- Direct input to this sheet is only allowed by Rocky Mountain Power staff or consultants. Total project costs must be entered by material, labor and other (taxes, disposal fees, etc.). Final costs entered in the software must reconcile with actual customer invoices submitted at inspection. Schedule EEM Installation Labor – Description Eligible (Y/N) Notes ≤ 400 W Metal Halide Pulse Start > 125 W ≤ 175 W Metal Halide Pulse Start Yes - for contractor labor (including sales tax, rental fees for equipment rented for the installation like lifts) Yes - for in house Sales tax can be listed as an "other cost" or included with the labor cost.  Equipment rental expenses like lifts can be listed as "other" or included with labor.  Materials – Yes - contractor/third party (including freight, sales tax) Yes - in house supplies Subject to reasonableness approval Sales tax and freight can be listed as "other cost" or included with the material cost Other costs Design Yes – design firm Yes for in house if stamped drawings are produced Project development not eligible Disposal/recycling Yes – for proper disposal/recycling according to applicable environmental regulation If invoice says “disposal”, we assume contractor is in compliance with environmental regulations Disposal/recycling Customer must submit documentation/certification showing they complied with environmental regulations PAYEE NAME (Unless assigned - see below) Costs must be itemized and entered by material labor and other on this worksheet . Direct input to this sheet required for assigned incentives only. Proposed Project status is preliminary until project has been installed, inspected, and invoices provided (final phase). State selected for the project must match with a rate schedule from the selected state. Owners’ overhead or project development costs Limited to direct installation costs only Manufacturer rebates EEM cost needs to be after rebate, reflecting what the customer paid Manufacturer discounts EEM cost needs to be after discounts, reflecting what the customer paid Maintenance contracts Financing costs General conditions Retrofit project – yes New construction – no The number of weeks per year the facility is in operation must be selected. Application fees or requirements for other incentives – public funded Public taxpayer funded incentive programs may be calculated on total project costs – prior to utility incentive calculation. Utility program will not adjust project cost by other public incentive payments Application fees or requirements for other incentives – rate payer funded Each EEM can only receive one incentive or credit Added cost for performance contracts, including: Yes – if present valued using customer’s discount rate ·        In house limited to direct install. Project management not eligible ·        Contractor ·        Subject to reasonableness approval ·        In house ·        contractor/third party ·        in house supplies ·        Design firm ·        In house ·        in-house ·        On-going monitoring ·        Reporting ·        Additional engineering ·        Maintenance contracts Cost Inputs to Summary Page Selecting "Custom" in Fixture Type requires a custom measure description of the existing or proposed custom fixture. Fax a data or cut sheet of the custom fixture to the RMP coordinator. Controls Input Location description should provide adequate info. for others (customers/contractor/utility representative) to identify the area affected by the lighting retrofit. Each line item represents one (1) sensor. The column "quantity" refers to the number of light fixtures being controlled by that one sensor. Labor and materials for EEM installation Hallie Gallinger George Humbert In Use ID 6 ID 9 ID 23 ID 6-A ID 10 ID 35 William Gatchel Tariff Effective ID Retrofit Jan 15, 2011 Retrofit Electrical Customer: Facility Owner: EEA Participant: Lisa Romney Nancy Goddard Chad Ambrose Bryan Anderson Harold Babbitt Alene Bentley Leslie Blythe Candice Collins Diana Knous Mark Cox Vince Crawford Joe Drnas Debra Dull Larry Elcock Lynn Everett Jim Gossett Matt Grant Tom Heaton Bret Hunter Martie Leo Alan Meyer Craig Nelson Greg Noyes Glen Pond Steve Rush Bob Smead Dave Spalding Travis Tanner Rod Taylor Unassigned Prem 1T8 <30W Lmp 0.8 BF Prem 1T8 3100 lum<0.8 BF Prem 2T8 <30W Lmp 0.8 BF Prem 2T8 3100 lum<0.8 BF Prem 3T8 < 30W Lmp 0.8 BF Prem 3T8 3100 lum<0.8 BF Prem 4T8 <30W Lmp 0.8 BF Prem 4T8 3100 lum<0.8 BF OCS kWh OCS Incentive Total Incentive April 1, 2011 Facility information - Enter facility address as found on utility bill. Project name Facility address Mailing address Authorized signator name Project contractor Contractor phone Project site account number Meter number Rate schedule Total square footage Business type Weeks operated per year Open major holidays Dollar Savings Develop operation schedule for areas with different hours of use. ( Example: storage 1 hr. a day Mon-Fri, front office 9 hrs a day Mon-Fri) vers 102411.1 Energy efficiency program participant information - Enter mailing address where incentive check is to be sent. Participant business name Participant is: Participant Contact Information 2.00 0.94 1.50 0.89 1.40 0.78 1.40 0.94 1.50 0.94 1.80 0.94 1.90 0.51 1.50 0.94 1.40 0.89 1.70 0.84 1.60 0.51 1.70 0.89 1.50 0.96 2.20 0.51 2.00 0.78 1.60 0.78 1.00 0.89 1.60 0.78 1.30 0.96 0.30 0.94 1.20 0.78 1.50 0.94 1.30 0.94 1.60 0.89 2.20 0.94 1.90 0.71 1.50 0.89 1.50 0.78 1.40 0.78 1.20 0.96 1.20 0.94 1.70 0.78 33.00 32.00 59.00 58.00 80.00 63.00 59.00 117.00 109.00 160.00 96.00 87.00 179.00 167.00 240.00 126.00 112.00 154.00 154.00 234.00 234.00 219.00 320.00 292.00 192.00 222.00 222.00 351.00 351.00 308.00 308.00 10.00 10.00 16.00 12.00 18.00 14.00 19.00 15.00 21.00 17.00 24.00 19.00 25.00 20.00 26.00 22.00 29.00 25.00 30.00 26.00 31.00 27.00 2.00 2.00 35.00 30.00 40.00 36.00 46.00 42.00 42.00 48.00 52.00 5.00 5.00 60.00 7.00 7.00 0.00 3.00 1100.00 138.00 188.00 250.00 295.00 46.00 465.00 66.00 95.00 142.00 1080.00 1080.00 142.00 210.00 210.00 295.00 295.00 42.00 42.00 458.00 458.00 95.00 95.00 118.00 118.00 170.00 170.00 194.00 194.00 275.00 275.00 324.00 324.00 349.00 349.00 380.00 380.00 435.00 435.00 485.00 485.00 818.00 818.00 28.00 46.00 58.00 79.00 107.00 134.00 168.00 221.00 295.00 355.00 377.00 402.00 458.00 23.00 24.00 44.00 48.00 66.00 73.00 95.00 88.00 95.00 146.00 146.00 32.00 2.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 43.00 3.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 113.00 4.00 15.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 75.00 5.00 10.00 0.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 20.00 20.00 20.00 20.00 20.00 0.00 0.00 0.00 0.00 0.00 4.00 1.00 205.00 6.00 15.00 15.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 2.00 80.00 7.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 3.00 390.00 8.00 15.00 15.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00 4.00 59.00 9.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 10.00 10.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 5.00 72.00 10.00 10.00 0.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 15.00 10.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00 6.00 207.00 11.00 15.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 7.00 123.00 12.00 10.00 10.00 0.00 10.00 0.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 0.00 0.00 11.00 8.00 109.00 13.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 9.00 160.00 14.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.00 10.00 585.00 15.00 15.00 15.00 0.00 0.00 0.00 0.00 0.00 14.00 87.00 16.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 15.00 0.00 0.00 0.00 0.00 0.00 15.00 115.00 17.00 15.00 15.00 0.00 0.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 20.00 20.00 20.00 15.00 15.00 0.00 0.00 16.00 319.00 18.00 15.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.00 198.00 19.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.00 760.00 20.00 15.00 15.00 0.00 0.00 0.00 0.00 0.00 19.00 112.00 21.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 15.00 15.00 0.00 0.00 20.00 112.00 22.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 15.00 15.00 0.00 0.00 21.00 144.00 23.00 25.00 30.00 25.00 25.00 0.00 15.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.00 30.00 30.00 30.00 20.00 20.00 15.00 15.00 15.00 0.00 0.00 22.00 414.00 24.00 15.00 15.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.00 246.00 25.00 10.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.00 222.00 26.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 12.00 27.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 15.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26.00 30.00 28.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 15.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 27.00 138.00 29.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28.00 1100.00 30.00 70.00 75.00 75.00 75.00 75.00 75.00 75.00 100.00 100.00 0.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 29.00 188.00 31.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.00 60.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.00 250.00 32.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.00 60.00 60.00 60.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 31.00 295.00 33.00 70.00 75.00 75.00 75.00 0.00 75.00 75.00 75.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.00 60.00 60.00 60.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32.00 46.00 34.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 33.00 465.00 35.00 70.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00 0.00 0.00 0.00 0.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00 0.00 0.00 0.00 0.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 34.00 66.00 36.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 35.00 95.00 37.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 36.00 840.00 70.00 75.00 75.00 75.00 75.00 75.00 100.00 100.00 0.00 0.00 0.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 37.00 100.00 39.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 10.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 5.00 5.00 5.00 10.00 2.00 5.00 10.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 25.00 25.00 25.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38.00 10.00 40.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 2.00 0.00 10.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 39.00 120.00 41.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 10.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 5.00 5.00 5.00 10.00 2.00 5.00 10.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 25.00 25.00 25.00 25.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.00 150.00 42.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 10.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 5.00 5.00 5.00 10.00 2.00 5.00 10.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.00 60.00 60.00 60.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 25.00 25.00 25.00 25.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.00 15.00 43.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 2.00 0.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 2.00 0.00 10.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42.00 200.00 44.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 10.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 5.00 5.00 5.00 10.00 2.00 5.00 10.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.00 60.00 60.00 60.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 25.00 25.00 25.00 25.00 0.00 0.00 0.00 0.00 0.00 0.00 43.00 20.00 45.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 0.00 2.00 0.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 2.00 0.00 10.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 44.00 25.00 46.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 0.00 2.00 0.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 2.00 0.00 10.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 45.00 300.00 47.00 0.00 0.00 0.00 0.00 0.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 10.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 5.00 5.00 5.00 10.00 2.00 5.00 10.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 60.00 60.00 60.00 60.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 25.00 25.00 25.00 25.00 0.00 0.00 0.00 0.00 46.00 40.00 48.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 10.00 2.00 20.00 2.00 0.00 2.00 0.00 0.00 0.00 0.00 0.00 10.00 2.00 0.00 10.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 47.00 50.00 49.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 10.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 5.00 5.00 0.00 10.00 2.00 0.00 10.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 25.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 48.00 60.00 50.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 10.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 5.00 5.00 5.00 10.00 2.00 0.00 10.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 25.00 25.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.00 75.00 51.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 10.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 5.00 5.00 5.00 10.00 2.00 5.00 10.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 25.00 25.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.00 90.00 52.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 15.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 10.00 2.00 20.00 2.00 20.00 2.00 20.00 2.00 5.00 5.00 5.00 10.00 2.00 5.00 10.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 25.00 25.00 25.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 51.00 142.00 53.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 52.00 1080.00 54.00 70.00 75.00 75.00 75.00 75.00 75.00 100.00 100.00 0.00 0.00 0.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 53.00 210.00 55.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.00 60.00 60.00 60.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 54.00 295.00 56.00 70.00 75.00 75.00 75.00 0.00 75.00 75.00 75.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.00 60.00 60.00 60.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 55.00 42.00 57.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.00 458.00 58.00 70.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00 0.00 0.00 0.00 0.00 0.00 0.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00 0.00 0.00 0.00 0.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 0.00 57.00 95.00 59.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58.00 850.00 70.00 75.00 75.00 75.00 75.00 75.00 100.00 100.00 0.00 0.00 0.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 59.00 119.00 61.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.00 1075.00 62.00 70.00 75.00 75.00 75.00 75.00 75.00 100.00 100.00 0.00 0.00 0.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 61.00 197.00 63.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.00 60.00 60.00 60.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 62.00 285.00 64.00 70.00 75.00 75.00 75.00 0.00 0.00 75.00 75.00 75.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.00 60.00 60.00 60.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 63.00 50.00 65.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 64.00 455.00 66.00 70.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00 0.00 0.00 0.00 0.00 0.00 0.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00 0.00 0.00 0.00 0.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 0.00 65.00 63.00 67.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 66.00 88.00 68.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 67.00 780.00 70.00 75.00 75.00 75.00 75.00 75.00 100.00 100.00 0.00 0.00 0.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 0.00 0.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 68.00 50.00 50.00 292.00 31.00 1.00 33.00 62.00 1.00 125.00 31.00 92.00 1.00 74.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 43.00 114.00 1.00 71.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58.00 2.00 80.00 0.00 0.00 0.00 0.00 0.00 15.00 0.00 0.00 0.00 0.00 104.00 71.00 2.00 0.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 0.00 0.00 83.00 115.00 2.00 62.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 71.00 165.00 2.00 72.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 82.00 220.00 3.00 208.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 64.00 3.00 123.00 15.00 0.00 0.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 58.00 82.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 72.00 160.00 3.00 115.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 0.00 118.00 240.00 4.00 160.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 208.00 320.00 4.00 93.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 123.00 4.00 112.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 115.00 160.00 4.00 4.00 20.00 0.00 0.00 0.00 0.00 0.00 20.00 0.00 0.00 0.00 97.00 86.00 2.00 115.00 5.00 176.00 7.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 319.00 10.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 197.00 12.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 165.00 14.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 240.00 15.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 128.00 17.00 6.00 30.00 0.00 0.00 0.00 0.00 0.00 30.00 0.00 0.00 0.00 112.00 19.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 144.00 20.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 236.00 22.00 7.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 416.00 25.00 7.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 246.00 26.00 7.00 220.00 27.00 7.00 320.00 30.00 7.00 2.00 10.00 36.00 7.00 5.00 12.00 42.00 7.00 7.00 14.00 7.00 10.00 15.00 42.00 7.00 12.00 17.00 95.00 7.00 14.00 19.00 142.00 7.00 15.00 20.00 210.00 7.00 17.00 22.00 295.00 7.00 19.00 25.00 458.00 8.00 20.00 26.00 1080.00 8.00 22.00 27.00 8.00 25.00 2.00 275.00 9.00 26.00 30.00 435.00 9.00 27.00 36.00 9.00 30.00 42.00 44.00 9.00 36.00 5.00 61.00 9.00 42.00 7.00 10.00 12.00 14.00 15.00 17.00 19.00 20.00 22.00 25.00 26.00 27.00 2.00 30.00 36.00 42.00 5.00 7.00 116.00 9.00 0.00 173.00 9.00 12.00 240.00 9.00 63.00 30.00 295.00 9.00 88.00 3.00 465.00 9.00 119.00 116.00 1100.00 9.00 197.00 1100.00 9.00 285.00 173.00 33.00 9.00 240.00 64.00 9.00 295.00 97.00 9.00 44.00 128.00 9.00 42.00 465.00 10.00 95.00 61.00 58.00 10.00 142.00 93.00 118.00 10.00 210.00 100.00 176.00 10.00 295.00 10.00 236.00 10.00 120.00 10.00 150.00 55.00 10.00 15.00 10.00 200.00 87.00 11.00 20.00 11.00 25.00 107.00 11.00 44.00 300.00 157.00 11.00 61.00 40.00 165.00 11.00 93.00 50.00 11.00 116.00 60.00 11.00 173.00 75.00 12.00 240.00 26.00 12.00 45.00 13.00 67.00 13.00 89.00 13.00 27.00 13.00 51.00 13.00 75.00 13.00 99.00 13.00 142.00 13.00 1080.00 13.00 210.00 14.00 295.00 14.00 42.00 14.00 458.00 14.00 95.00 15.00 118.00 15.00 170.00 15.00 194.00 15.00 275.00 16.00 324.00 16.00 349.00 16.00 435.00 16.00 485.00 16.00 805.00 16.00 119.00 16.00 1075.00 17.00 197.00 17.00 285.00 50.00 455.00 63.00 88.00 205.00 390.00 585.00 760.00 42.00 48.00 52.00 60.00 116.00 1100.00 173.00 240.00 295.00 44.00 465.00 61.00 93.00 142.00 1080.00 210.00 295.00 42.00 458.00 95.00 118.00 170.00 194.00 275.00 324.00 349.00 435.00 485.00 805.00 119.00 1075.00 197.00 285.00 50.00 455.00 63.00 88.00 154.00 123.00 144.00 236.00 189.00 416.00 246.00 220.00 320.00 230.00 184.00 33.00 32.00 43.00 59.00 113.00 75.00 205.00 58.00 80.00 390.00 63.00 59.00 72.00 117.00 207.00 123.00 109.00 160.00 585.00 96.00 87.00 115.00 179.00 179.00 319.00 198.00 167.00 240.00 760.00 126.00 112.00 154.00 154.00 144.00 234.00 234.00 414.00 246.00 219.00 320.00 292.00 192.00 222.00 222.00 351.00 351.00 308.00 308.00 10.00 10.00 16.00 12.00 18.00 14.00 19.00 15.00 21.00 17.00 24.00 19.00 25.00 20.00 26.00 22.00 29.00 25.00 30.00 26.00 31.00 27.00 2.00 2.00 35.00 30.00 40.00 36.00 46.00 42.00 42.00 48.00 52.00 5.00 5.00 60.00 7.00 7.00 0.00 12.00 30.00 3.00 138.00 1100.00 1100.00 138.00 188.00 188.00 250.00 250.00 295.00 295.00 46.00 46.00 465.00 465.00 66.00 66.00 95.00 95.00 840.00 100.00 10.00 120.00 150.00 15.00 200.00 20.00 25.00 300.00 40.00 50.00 60.00 75.00 90.00 28.00 46.00 58.00 79.00 107.00 134.00 168.00 221.00 295.00 355.00 377.00 402.00 458.00 142.00 1080.00 1080.00 142.00 210.00 210.00 295.00 295.00 42.00 42.00 458.00 458.00 95.00 95.00 850.00 118.00 118.00 170.00 170.00 194.00 194.00 275.00 275.00 324.00 324.00 349.00 349.00 380.00 380.00 435.00 435.00 485.00 485.00 818.00 818.00 119.00 1075.00 1075.00 119.00 197.00 197.00 285.00 285.00 50.00 455.00 455.00 50.00 63.00 63.00 88.00 780.00 88.00 23.00 24.00 44.00 48.00 66.00 73.00 95.00 88.00 95.00 146.00 146.00 4FinAnswer Express Lighting Retrofit Incentive of 4FinAnswer Express Lighting Retrofit Incentive of 4FinAnswer Express Lighting Retrofit Incentive of 4FinAnswer Express Incentive 4FinAnswer Express Incentive 4FinAnswer Express Incentive Location: , ID Total Quantity: 0 4FinAnswer Express Incentive ] 4FinAnswer Express Incentive ] 4FinAnswer Express Incentive ] ID Retrofit , ID A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A ID Retrofit vers 102411.1 0.00 ID 49.00 6FinAnswer Express Retrofit Lighting Incentive 6FinAnswer Express Retrofit Lighting Incentive 6FinAnswer Express Retrofit Lighting Incentive ID Retrofit vers 102411.1 Input required > 0.00 Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered 0.20 25.00 Error Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered 0.20 30.00 Error Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered 0.40 20.00 Error Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered 0.20 30.00 Error Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered 0.20 20.00 Error Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered 0.20 30.00 Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered Error: Invalid rate schedule. Refer to Project Information Sheet Status: No Location has been entered ] ] ] - Location: , ID Error Error Error Error Error 8760.00 From the schedule developed on Project Information Sheet Default is Schedule A Use the X schedule for exit signs only. - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected Error 0.00 - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected Error - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected Error - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected Error - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected Error - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected 8760.00 - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected 154.00 - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected 123.00 - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected 144.00 - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected 236.00 - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected 189.00 - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected 416.00 - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected 246.00 - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected 220.00 - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected 320.00 - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected 230.00 - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected 184.00 - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected - - Error: Invalid rate schedule. Refer to Project Information Sheet Status: No proposed fixture selected From the schedule developed on Project Information Sheet Default is Schedule A Use the X schedule for exit signs only. 6FinAnswer Express Retrofit Lighting Incentive 6FinAnswer Express Retrofit Lighting Incentive 6FinAnswer Express Retrofit Lighting Incentive 52.14 ?4?/?1?/?2011 51.00 $0.04 $11.48 50.00 $0.04 $11.48 49.00 $0.04 $7.68 48.00 $0.05 $4.84 47.00 $0.08 46.00 $0.05 $14.96 45.00 44.00 43.00 42.00 41.00 40.00 39.00 38.00 37.00 Invalid rate schedule based on site address < Required! 36.00 35.00 34.00 33.00 32.00 31.00 30.00 29.00 28.00 < Invalid! 27.00 26.00 < Required! Error Error Error Error Error 25.00 24.00 23.00 22.00 21.00 20.00 19.00 18.00 17.00 16.00 15.00 14.00 13.00 12.00 11.00 10.00 9.00 8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 Go to Help Enter the project facility's address as listed on the electrical power bill. Where the incentive check is to be mailed (unless assigned to a 3rd party) Electrical Customer is: A) The Electrical Account Holder. B) The Electricity User at the Facility. Enter the Company who has signed the incentive agreement. 3.30 Back to Project Information