Loading...
HomeMy WebLinkAbout20130712PAC to Staff 19 Supp.pdfROCKY MOUNTAIN 201 South Main,Suite 2300 I POWER Salt Lake City,Utah 84111 A DIVISION OFPACIFTCORP 2)I3JLtL 12 Jul 12 2013 TI; Jean Jewell Idaho Public Utilities Commission 472 W.Washington Boise,ID 83 702-591 8 jeaiiJewell@puc.state.gov (C) Tern Carlock TeniCarlock@opuc.idaho.gov (C) RE:ID PAC-E-13-02 IPUC Data Request (17-20) Please find enclosed Rocky Mountain Power’s 1St Supplemental Response to IPUC Data Request 19.Also providcd is Attachment IPUC 19—1 JSt Supplemental. If you have any questions,please feel free to call me at (801)220-2963. Sincerely, 7Z(6’€ J.Ted Weston Manager,Regulation Enclosure C.c,:Randall C.Budge/Monsanto rcb@racinelaw.net James R.Smith/Monsanto Company jirn.r.smit1--(.monsanto.com (C) Brubaker &Associates/Monsanto bcollins@consultbai.com Jim T.Selecky/Monsanto JSelecky(ZI),consultbai.com (C) PAC-E-13-02/Rocky Mountain Power July 12,2013 IPUC Data Request 19 1st Supplemental IPUC Data Request 19 for Data request #10 please provide information pertaining to the remainder of items with estimated in-service date of September 1-December 31,2013 as included in your file IPUC 8-i.Including,but not limited to: a.Cholla computer room,gantry crane,coal mill overhauls,plant paving, etc. b.Coistrip COLU5 generator reliability,capital project support c.Craig limestone handling modifications d.Hunter project for motors,gearbox,elect. e.DJ mill blanket,pumps and valves,coal yard,security bldg. communication equipment f Naughton regarding road repaving,fire pump,blanket asbestos reinsulation g.Wind Plant WGen,W-1799 repair gearboxes,turbine blades,generators Additional conversations with IPUC relating to this request yielded the following change in the scope of the request: Please send the detail already collected for all projects.For items not yet collected,feel free to reduce it to the following: 1.W-1799 Replace/Repair wind gearboxes,turbine blades,generators 2.Cottonwood Prep Plant Sampling system 3.Chehalis Balancing Authority Change 4.Cholla Active Carbon Injection 5.Huntington Main GSU Transformer for Attachment 19-1,please provide the percent complete as of June 30,2013 or the most recent date available for each project line. 1st Supplemental Response to IPUC Data Request 19 Please refer to Attachment IPUC 19-1 lS Supplemental,which includes the actual capital spend through June 30,2013 to indicate the progress of the respective projects.The Company does not generally keep records for percentage complete for these smaller projects,however in Attachment 19-i 1st Supplemental we have shown the percent of total project expenditures to date. Recordholder:Ian Andrews Sponsor:Ian Andrews