Loading...
HomeMy WebLinkAbout20130708PAC to Staff 19.pdfROCKY MOUNTAINmmL, 4U l'-'1Ul'r July 8,2013 ,r-iii Jean Jewell Idaho Public Utilities Commission 472 W. Washington Boise,ID 83702-5918 i ean j ewel l(d)puc. state. gov (C) Terri Carlock Terri.Carlock@opus.idaho. gov (C) RE: ID PAC-E-13-02 IPUC Data Request (17-20) i: ,: i',201 South Main, Suite 2300 Salt Lake City, Utah 841 I I JtiL -ll :i.;.'!i!'-._ i I r'-.- Fil l+' 3-I Please find enclosed Rocky Mountain Power's response to IPUC Data Request 19. Also provided are Attachments IPUC 19 *(1-2). If you have any questions, please feel free to call me at (801) 220-2963. Sincerely, fr D4Ar.tb.r/tp-., J. Ted Weston Manager, Regulation Enclosure C.c.: Randall C. BudgeAvlonsanto rcb@racinelaw.net James R. SrnithAvlonsanto Company j im.r. smitl-@,,monsanto. com (C) Brubaker & Associates/Monsanto bcollins@consultbai.com Jim T. Selecky/Monsanto JSeleckv@consultbai.com (C) PAC-E- I 3 -02lRocky Mountain Power July 8, 2013 IPUC Data Request 19 IPUC Data Request 19 For Data request #10 please provide information pertaining to the remainder of items with estimated in-service date of September l-December 31,2013 as included in your hle IPUC 8-1. Including, but not limited to: a. Cholla computer room, gantry crane, coal mill overhauls, plant paving, etc. b. Colstrip COLU5 generator reliability, capital project support c. Craig limestone handling modifications d. Hunter project for motors, gearbox, elect. e. DJ mill blanket, pumps and valves, coal yard, security bldg, communication equipmentf. Naughton regarding road repaving, fire pump, blanket asbestos reinsulationg. Wind Plant WGen, W-l799 repair gearboxes, turbine blades. generators Additional conversations with IPUC relating to this request yielded the following change in the scope ofthe request: Please send the detail already collected for all projects. For items not yet collected, feel free to reduce it to the following: 1. W-1799 Replace/Repair wind gearboxes, turbine blades, generators 2. Cottonwood Prep Plant Sampling system 3. Chehalis Balancing Authority Change 4. Cholla Active Carbon Injection 5. Huntington Main GSU Transformer Response to IPUC Data Request 19 Please refer to Attachment IPUC l9-1, which is a summary of the updated in- service amounts and dates for the capital additions previously submitted in the response to IPUC 8. Included in the summary arc additional projects that were not anticipated for the test period at the time the filing was prepared, but are now included in the Company's forecast. Pertaining to the 5 specific projects listed in the revised request, the Company responds as follows: W-1799 Replace/Repair wind gearboxes, turbine blades, generators - This project represents an aggregate amount projected to be incurred this year based on prior experience. These capital costs are included as a placeholder in the plan and timing specifics are addressed when the equipment failures occur. In 2013, this project funding was more than fully utilized on various gearbox, blade, and generator projects at the Glenrock, Goodnoe Hills, Leaning Juniper, and Seven PAC-E- 1 3 -02lRocky Mountain Power July 8, 2013 IPUC Data Request l9 Mile Hill wind sites. Project approval documentation for several of these are included in Attachment IPUC l9-2. For the remaining four projects, in-service dates are based on project manager estimates taking into account several factors, including scheduled maintenance of major plant components, contractor availability, critical nature of the project component or system, contract schedules, and timing of regulatory compliance requirements. Cottonwood Prep Plant Sampling system - Please refbr to Attachment IPUC 19-2 for proj ect approval documentation. Chehalis Balancing Authority Change - Please refer to Attachment IPUC 19-2 for project approval documentation. Cholla Active Carbon Injection - As indicated in Attachment IPUC l9-1, this project has been postponed until 2015. Huntington Main GSU Transformer - Please refer to Attachment IPUC l9-2 for project approval documentation. Subsequent to preparation ofthe project approval documentation, this project was pushed out to a2013 completion date. Recordholder: lan Andrews Sponsor: Ian Andrews