HomeMy WebLinkAbout20130708LJ1-S08 Gearbox Repl.doc PACIFICORP ENERGY Proposal Date: 01/22/2013 Plant: Leaning Juniper APR#: 20002873 TITLE: W-1700 LJ1-S08 GEARBOX REPLACEMENT OBJECTIVE: Remove and replace the gearbox and main shaft assembly in wind turbine LJ1-S08 located at Leaning Juniper wind plant. 1. Introduction This project is to purchase a new or refurbished gearbox and main shaft assembly, and remove and replace the damaged gearbox and main shaft assembly in wind turbine LJ1-S08 located at Leaning Juniper wind plant. This project requires a large erection crane with a smaller tail crane to remove the rotor assembly and the gearbox and main shaft assembly. The new or refurbished gearbox, main shaft, and rotor assemblies will be installed with all new mounting hardware and oil as required. The damaged gearbox has been identified to contain severe intermediate gear and pinion shaft teeth. This turbine has been operated at a reduced load until the replacement can be made due to the severity of the damage. The scheduled replacement project requires extended contractor labor and equipment costs due to the wind restrictions and weather conditions. The total estimated capital expenditure for this project is $418,010. 2. Description and Strategic Fit The wind energy plants at PacifiCorp are an integral component to the generation portfolio. Management of the operations and maintenance functions of the wind generation plants is critical to protecting our assets and providing a reliable generation resource. This project is considered a requirement as the wind turbine generator has been placed out-of-service until the replacement can be completed. 3. Capital Budget Status Funding for this project will come from the approved 2013 capital budget. This will be a G2 APR under the approved G1 APR 10009911. 4. Benefits The gearbox must be replaced before further damage occurs. Replacement of the damaged gearbox/main shaft assembly will prevent the further loss of revenue, production tax credits and lost green tags for wind turbine generators. The benefits of doing the project now rather than later include a positive PVRR(d) benefit of $24K and a project IRR of 9%. 5. Alternatives Considered The alternative considered was to operate the wind turbine generator until the gearbox/main shaft assembly has a catastrophic failure, this will place no salvageable return on the gearbox/ main shaft assembly investment. Another alternative would be to not replace the damaged gearbox and main shaft assembly which would eventually make this turbine inoperable. 6. Risk Factors Evaluated Risk factors involved with this project are moderate to high as wind speed restrictions and blade icing conditions for the removal and installation operations may affect this project’s final completion date. 7. Retirement and Removal Information This project will remove the gearbox and main shaft assembly on LJ1-S08. This gearbox and main shaft assembly will be sent to a repair facility to be evaluated for refurbishment. A new or refurbished gearbox and main shaft assembly will be installed to restore operation of this wind turbine. Author: Michael Mackey, Supervisor, Wind Operations Final Approver: Douglas Mollet, Director, Wind Operations Project Purpose & Necessity Page 2 of 2 Project Purpose & Necessity Page 1 of 2 Sheet1 Requested (without AFUDC) Budgeted (without AFUDC) Difference (+/-) Requested AFUDC PRIOR FUTURE TOTAL CY13 CY14 CY15 CY16 CY17 Escalated Budget (without AFUDC) PACIFICORP Share TOTAL Requested Funds * Change amounts in white cells only - questions call 220-4956 CAPITAL EXPENDITURES - $000 CY18 CY19 Lookup Escalation (1) Escalation (2) CY20 CY21 Escalation Factors (2012 10YP) Escalation Factors (2013 10YP) CY22 $0.00 $414.00 $0.00 $0.00 $0.00 $414.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 2.00 2.00 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 1.00 0.00 0.00 0.02 0.04 0.06 0.07 0.09 0.11 0.13 0.15 0.17 2.00 $0.00 $414.00 $0.00 $0.00 $0.00 $414.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $414.00 $0.00 $0.00 $0.00 $414.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $4.00 $0.00 $0.00 $0.00 $4.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $418.00 $0.00 $0.00 $0.00 $418.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00