Loading...
HomeMy WebLinkAbout20120724Staff 9-19 to PAC.pdfKARL T. KLEIN DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION P0 BOX 83720 BOISE, IDAHO 83720-0074 (208) 334-0320 IDAHO BAR NO. 5156 2012 JUL 24 AM 10: 37 iDAHO PUBLft MSSlJ Street Address for Express Mail: 472 W. WASHINGTON BOISE, IDAHO 83702-5983 Attorneys for the Commission Staff BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF PACIFICORP DBA ) ROCKY MOUNTAIN POWER'S ) APPLICATION FOR AN ACCOUNTING ) ORDER REGARDING COSTS INCURRED ) FOR NAUGHTON UNIT 3. ) ) ) ) CASE NO. PAC-E-12-07 THIRD PRODUCTION REQUEST OF THE COMMISSION STAFF TO ROCKY MOUNTAIN POWER The Staff of the Idaho Public Utilities Commission, by and through its attorney of record, Karl T. Klein, Deputy Attorney General, requests that PacifiCorp dba Rocky Mountain Power (Company; Rocky Mountain) provide the following documents and information as soon as possible, by TUESDAY, AUGUST 14, 2012. This Production Request is to be considered as continuing, and the Company is requested to provide, by way of supplementary responses, additional documents that it or any person acting on its behalf may later obtain that will augment the documents or information produced. Please provide answers to each question, supporting workpapers that provide detail or are the source of information used in calculations, and the name, job title and telephone number of the person preparing the documents. Please identify the name, job title, location and telephone number of the record holder. THIRD PRODUCTION REQUEST TO ROCKY MOUNTAIN POWER 1 JULY 24, 2012 In addition to the written copies provided as response to the requests, please provide all Excel and electronic files on CD with formulas activated. REQUEST NO. 9: Please describe the process for selecting the engineering, procurement and construction (EPC) contractor. Your description should include how the vendor was selected resulting in a contract (i.e. competitive bidding, etc.) that was the lowest possible cost. REQUEST NO. 10: Please provide copies of monthly progress reports from the EPC contractor. REQUEST NO. 11: Please explain the cost difference between the (a) EPC Contract Cost in Attachment 1 to the Application, and (b) the Maximum Cumulative Progress Payment Amount for a February cancellation date as shown in the EPC contract. REQUEST NO. 12: Please describe the Dry Ash system study (as shown in Attachment 1 to the Application). The description should include the study's purpose (what it is and why it is important to the overall project), a list of the major deliverables, and a timeline of the major milestones. Please also state what percentage of the study was complete when the suspension of work was issued, and the total estimated cost. REQUEST NO. 13: Please describe the Landfill siting study (as shown in Attachment 1 to the Application). The description should include the study's purpose (what it is and why it is important to the overall project), a list of the major deliverables, and a timeline of the major milestones. Please also state what percentage of the study was complete when the suspension of work was issued, and the total estimated cost. REQUEST NO. 14: Please describe the Pulse Jet Fabric Filter (PJFF) system studies (as shown in Attachment 1 to the Application). The description should include the study's purpose (what it is and why it is important to the overall project), a list of the major deliverables, and a timeline of the major milestones. Please also state what percentage of the study was complete when the suspension of work was issued, and the total estimated cost. THIRD PRODUCTION REQUEST TO ROCKY MOUNTAIN POWER 2 JULY 24, 2012 REQUEST NO. 15: Please describe the best available retrofit (BART) study (as shown in Attachment 1 to the Application). The description should include the study's purpose (what it is and why it is important to the overall project), a list of the major deliverables, and a timeline of the major milestones. Please also state what percentage of the study was complete when the suspension of work was issued, and the total estimated cost. REQUEST NO. 16: Please generally describe the scope of work for each contract under the category of "Owner's engineering consulting contracts" shown in Attachment 1 to the Application. What was the process used to select each contractor to ensure lowest possible cost? What was the total estimated cost and the percent of completion for each contract when the suspension of work was issued? REQUEST NO. 17: Please provide Rocky Mountain's targeted (or estimated) level of emissions that it believes it will need to achieve compliance at the Naughton facility for the following environmental regulations: a.Regional Haze Rules (BART) b.Mercury Toxics Standards (MATS/MACT) c.National Ambient Air Quality Standards (NAAQS) d.Coal Combustion Residuals (CCR) e.Water Impingement Standards (Clean Water Act 316(b)) Please provide this for each individual generation unit, for the entire Naughton facility, or both, depending on the method required by permitting agencies. For clarity purposes, please describe if the permits for each regulation will be (or assumed to be) issued by each individual generation unit or for the entire facility. REQUEST NO. 18: Please provide a breakdown by generating unit of usage and capital investment for common infrastructure/equipment that is required to use coal as a fuel. REQUEST NO. 19: Please list the capital investments (including estimated dollar amounts) that could/would be leveraged as common facilities by Naughton units #1 and/or #2 if they were converted to natural gas. Please include a utilization breakdown by generating unit. THIRD PRODUCTION REQUEST TO ROCKY MOUNTAIN POWER 3 JULY 24, 2012 DATED at Boise, Idaho, this i '1ay of July 2012. I I z 41-1 Karl T. Klein Deputy Attorney General Technical Staff: Mike Louis/9-19 i:umisc:prodreq/pace12.7kkm1 prod rcq3 THIRD PRODUCTION REQUEST TO ROCKY MOUNTAIN POWER 4 JULY 24, 2012 CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS 24TH DAY OF JULY 2012, SERVED THE FOREGOING THIRD PRODUCTION REQUEST OF THE COMMISSION STAFF TO ROCKY MOUNTAIN POWER, IN CASE NO. PAC-E-12-07, BY MAILING A COPY THEREOF, POSTAGE PREPAID, TO THE FOLLOWING: TED WESTON ID REGULATORY AFFAIRS MANAGER ROCKY MOUNTAIN POWER 201 S MAIN ST STE 2300 SALT LAKE CITY UT 84111 E-MAIL: ted.weston@pacificorp.com DATA REQUEST RESPONSE CENTER E-MAIL ONLY: datareuuest@pacificorp.com YVONNE HOGLE SENIOR COUNSEL ROCKY MOUNTAIN POWER 201 S MAIN ST STE 2300 SALT LAKE CITY UT 84111 E-MAIL: Yvonne.hog1e(pacificorp.com SECRETARY CERTIFICATE OF SERVICE