Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20110829PAC to Staff Attach 179.pdf
Idaho PAC-E-11-12 IPUC 179 Rocky Mountain Power Idaho General Rate Case - December 2010 PacifiCorp Environmental Remediation Co. Spending by Environmental Project Site Cash Remaining Received Cash at WBS 1996&after Dec31,2010 Updated ProForma Spending CY2O11 Attachment IPUC 179 Remaining Actual Cash at Spending Dec 3l,2011 2011YTD American Barrel PERCh 9971E/001 151,916 66,936 Astoria! Unocal PERCI1997/E/002 664,285 175,140 Eugene - PacifiCorp PERCI1997/E/003 344,354 30,174 Everett - PacifiCorp PERCI1997/E/004 391,328 18 Jordan / Barber Tar PERC/1997/E/005 - - Ogden PERCI1997/E/006 170,956 10,777 Tacoma A Street PERC/1997/E/007 195,296 3,145 Tacoma River Street PERCI1997/E/008 - - Bridger OW Sampling PERCI1997/E/009 - - Bridger Landfill Repermitting PERC/1997/E/010 - - Bridger Oil Spill PERCh 997/E/01 1 - - Carbon Fuel Oil PERCI1997/E/012 - - Carbon Landfill Permit PERCI1997/E1013 - Carbon Emerg. Gen, Remediation PERCI1997/E/014 - - Centralia Heavy Equipment Shop PERCI1997/E/013 - - Dave Johnston GW Sampling PERCI1997/E/016 - - Dave Johnston Landfill Repermit PERCI1997/E/017 - - Dave Johnston Diesel Release PERCI1997/E/018 - - Dave Johnston Landfill Closure PERCII9971E/019 - - Dave Johnston Landfill Reclamation PERCI19971E/020 - - Farm GW Monitoring - Hunter PERCI1997/E/021 - - Farm OW Monitoring - Huntington PERCI1997/E/022 - - Hunter Fuel Oil PERCI1997/E/023 1,075 515 Hunter Injection Wells PERC/1997/E/024 - Hunter Landfill Permit PERC/1997/E/025 - Huntington Injection Wells PERC/1997/E/026 - - Huntington Landfill Closure PERC/1997/E/027 34,191 22,353 Huntington Landfill Permit PERC/1997/E/028 - Huntington Lead Paint Removal PERC/1997/E/029 - - Huntington Wellhead Protection PERC/1997/E/030 - - Buried Pitch PERC/1997/E/031 - - Tank Farm PERC/1997/E/032 - - Naughton FGD Pond Closure PERCI1997/E/033 39,076 28,008 Naughton OW Monitoring PERC/1997/E/034 - - Naughton Landfill Repermit PERCI1997/E/035 - - Naughton Landfill Closure PERC/1997/E/036 - - Wyodak Pond Study PERCI1997/E1037 - - Wyodak Fuel Oil PERCI1997/E1038 38,099 3,532 Bank Stabilization & Restoration PERCI1997/E/039 - - Restore River Embankments PERCI1997/E1040 - - Cutler PERC/1997/E/041 - - Bank Stabilization & Restoration PERCI1997/E/042 - - Merwin Hatchery Fix Erosion Problems PERCI19971E/044 - - Speelyai Hatchery Stabilize River Bank PERC/1997/E/045 - - No. Umpqua Erosion Repairs PERCI1997/E/046 - - Klamath River Domestic Water Studies PERCh 997hE/048 - - Big Fork Flowline Repairs PERC/19971E/050 249,107 24,281 No. Umq Remove Contaminated Soils PERCI1997IE/052 - - Rogue River Domestic Water Studies PERCh 9971E/053 - - UST Removal PERCI1997/E1054 - - Lead Paint Removal PERCI1997/E/055 - - Annex I PERCI1997/E/056 - 12 Cedar Diesel PERCI1997/E/057 - - Holiday Gun Club PERC11997/E/058 - - Jordan Substation PERC/1997/E/059 14,653 2,661 Montague Ranch PERC/19971E/060 170,956 71,152 Ross Island Tower Clean-up PERCI1997IE/061 - - Spill Prevention, Containment and Countermeasi PERC/19971E/062 - - Ashton Substation PERC/1997/E/070 - - Rock Springs Plant Substation PERC/1997/E/071 - - Sinclair Substation PERCI1997/E/072 - - Parco Substation PERCI1997/Eh073 - - Garland Substation PERCI1997/Eb074 - Dexter Substation PERCI1997/E/075 - - Page 1 of 2 Attachment IPUC 179 ID PAC-E-11-12 IPUC 179 Attachment IPUC 179 Attach IPUC 179.pdf Page 1 of 2 Idaho PAC-E-1 1-12 Attachment IPUC 179 PUG 179 Rocky Mountain Power Idaho General Rate Case - December 2010 PacifiCorp Environmental Remediation Co. Spending by Environmental Project Updated Cash Remaining ProForma Remaining Actual Received Cash at Spending Cash at Spending Site WBS 1996&after Dec31,2010 CY2O11 Dec 3l,2011 2011YTD WyoMont Substation PERCh 997/E1076 - - Salt Lake Automotive Shop PERC/19971E/077 - - Vernal Diesel PERC/1997lE/078 - - Salt Lake Terminal Oil Spill PERC/1997lE/079 - - Bridger Coal Fuel Oil Spill PERC/1997/E/080 48,845 57,129 Bors Property PERC/1997/E/081 - - Coal Creek PERC/19971E/082 - - Ekotek / PetroChem PERC/1997/E/083 - - Environmental Pacific PERC/1997lE/084 - - Mountaineer Refinery PERC/1997/El085 4,884 - Northwest Triangle Property PERC/1997lEl086 - - Pinedale PERC/1997lE/087 - - PCB, Inc. PERC/1997/E/088 - - Portable Equipment OW PERC/1997/E/089 - - Idaho Falls Pole Yard PERC/1997lE/090 371,218 - Idaho Falls Pole Yard PERC/1997lEl091 - 155,930 Astoria Steam Plant PERCh1997lEl092 - - Bear River Erosion Control PERC/1997lE/093 - - Beaver Bay Drainfleld Cleanup PERC/1998lE/094 - - Bridger Boron Contaminated Soil Rem PERC/1998/El095 - - Bridger Coal Warehouse Spill PERCh 9981E/097 - - Bridger Oil Spill (New Releases) PERCh 998/E/098 387,500 47,421 Cedar Steam Plant PERC/1998/E/099 74,510 10,001 Centralia Mine Pond Reclamation PERC/1998/E/100 - - Cougar Shore Line Repair PERCI1998/E/101 - - Mining Central Warehouse Cleanup PERCI1998/E/102 - - Deer Creek Terrace Stabilization P ERG/i 998/Eli 03 - - Domestic Water System Testing and Review PERCI1998/Eh104 - - Hale Plant Cleanup PERCI1998/El105 - - Huntington Ash Storm Runoff Pond PERCI1998/El106 - - Huntington Lead Paint Removal PERCh 998/E/i 07 - - Lead Paint Removal (1998 Funds) PERCI1998/E1108 - - Lewis / Swift Reservoir Cleanup PERCh 998/E/i 09 - - Lifton Pumping Station Cleanup PERC/19981E/110 - - Merwin Oil House Removal PERCh 998/E/1 ii - - Naughton South Ash Pond Reclam PERC/1998/E/112 - - Ogden Pole Treating Remediation PERC/1998/Ei 13 - - Speelyai Well PERC/1998bE/i14 - - Big Fork PCB Soil Cleanup PERC/2003/E1123 - - Pwr Delivery UST Compliance Audit PERC/2003hE/1 24 - - Bridger FGD Pond 1 Closure PERC/2007hE/126 759,369 89,749 Huntington Plant Fuel and Lube Oil Tank Farm PERC/2007/E1127 - - Olympia, WA PERCl2007/Eh128 110,499 112 Powerdale Cleanup PERC/2008/Eh129 96,483 39,132 Lincoln Steam Plant PERC/2008/E/130 - - Portland Harbor Source Control PERC/2008hE/131 560,201 215,826 Grace Hydro Plant PERC/2009hE/132 - - Huntington Unit #2 Precipitator PCB Remediatior PERC/201 0/E/1 34 3,774 3,739 Dave Johnston Oil Spill PERC/201 0/E/i 35 76,174 4,797 SPCC Oil/Water Separator Project 406860 - - Astoria Young's Bay 401980 - - Silver Bell / Telluride (hits cost center) 401981 - - Attorney contingency fee received - - REGULATED TOTAL 38,624,130 3,888,236 4,958,749 - 1,062,540 Page 2 of 2 Attachment IPUC 179 ID PAC-E-11-12 IPUC 179 Attachment IPUC 179 Attach IPUC 179.pdf Page 2 of 2