Loading...
HomeMy WebLinkAbout20110705PAC to Monsanto Attach 2-89-3.xlsID Irrigation 2011 OLE_LINK5 **System net power cost impacts not quantified Difference FERC Idaho Utah Wyoming Washington Oregon California Total Net Impact of Change System Treatment Situs Treatment Year Program Cost Impact Allocation Impact (Rolled-In Revenue Requirement) SG Factor 2011 Idaho Irrigation Compare Situs to System Treatment Loads are presented as participating meter loads, not intended to imply realized impact of load reductions at dispatch. Total Program Costs (Incl. Incentives) Incentive Credits Dispatchable Option Scheduled Forward Option Approximate Participation (MW)* Idaho Irrigation Load Control Program - Estimates for 2011 * As reported in annual program reports for years through 2010. Year 2011 figures reflect the reduction in costs as stipulated in Docket No. PAC-E-11-06. Difference Situs Vs. System Estimates of participation in 2011 are preliminary estimates, are subject to change, and are provided for illustrative puposes only. System vs. Situs Treatment of Idaho Irrigation Load Control in Jurisdictional Loads Attachment 2 0ID PAC-E-11-12 Monsanto 2.89 0Attachment Monsanto 2.89 -3 0 0Page of 2003.00 2004.00 2005.00 2006.00 2007.00 2008.00 2009.00 2010.00 2011.00 21.00 39.50 45.70 43.50 39.30 4.00 2.00 30.09 68.20 64.30 58.20 50.00 4.00 2.00 47.20 42.70 22.60 1.50 1.90 2.00 2.00 64.70 203.40 254.20 278.30 220.00 $277,584.00 $410,325.00 $842,666.80 $925,577.33 $1,752,930.47 $5,993,868.57 $7,246,582.84 $8,101,480.75 $6,281,000.00 28.55 1000.00 $500,900.34 $717,143.98 $1,224,786.56 $1,299,128.83 $2,584,508.07 $8,908,215.76 $10,680,610.54 $12,031,779.50 $9,581,000.00 3300000.00 2011.00 1.00 0.02 0.26 0.08 0.17 0.42 0.06 3.91E-03 2011.00 1.00 0.02 0.26 0.08 0.16 0.41 0.06 3.89E-03 0.00 -7.16E-05 -1.04E-03 -3.02E-04 -6.07E-04 -1.60E-03 3.63E-03 -1.47E-05 2011.00 -596.58 -154578.04 -2233758.31 -652906.50 -1308582.43 -3440940.57 7821641.71 -31472.45 2011.00 $9,581,000.00 9581000.00 2011.00 $9,581,000.00 173008.25 2512205.93 735458.93 1574933.75 3973137.75 574958.38 37297.01 0.00 173008.25 2512205.93 735458.93 1574933.75 3973137.75 -9006041.62 37297.01 -596.58 18430.21 278447.62 82552.44 266351.32 532197.18 -1184399.91 5824.56 The 2010 Protocol Baseline Study treats the impact of the Idaho Irrigation Load Control Program as a reduction to Idaho jurisdictional load. If the reduction to Idaho load is removed, Idaho's load-based allocation factors increase and the other states' factors decrease. The impact to study results is shown below: