HomeMy WebLinkAbout20110208Staff 1-15 to PAC.pdfNEIL PRICE DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, IDAHO 83720-0074 (208) 334-0314 ISB NO. 6864 REeE ZûH FEB -8 PM l: 58 Street Address for Express Mail: 472 W. WASHINGTON BOISE, IDAHO 83702-5918 Attorney for the Commission Staff BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION OF ) PACIFICORP DBA ROCKY MOUNTAIN ) POWER'S REQUEST FOR APPROVAL OF ) REVISIONS TO ITS DISPATCHABLE ) IRRGATION LOAD CONTROL PROGRAM. ) ) ) ) CASE NO. PAC-E-11-6 FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO PACIFICORP The Staff of the Idaho Public Utilities Commission, by and through its attorney of record, Neil Price, Deputy Attorney General, requests that PacifiCorp dba Rocky Mountain Power (Company; PacifiCorp; Rocky Mountain Power) provide the following documents and information as soon as possible, but no later than TUESDAY, FEBRUARY 22, 2011. The Company is reminded that responses pursuant to Commission Rules of Procedure must include the name and phone number of the person preparing the document, and the name, location and phone number of the record holder and if different the witness who can sponsor the answer at hearing if need be. Reference IDAPA 31.01.01.228. This Production Request is to be considered as continuing, and Rocky Mountain Power is requested to provide, by way of supplementary responses, additional documents that it or any person acting on its behalf may later obtain that wil augment the documents produced. FIRST PRODUCTION REQUEST TO PACIFICORP DBA ROCKY MOUNTAIN POWER 1 FEBRUARY 8, 2011 Please provide answers to each question, supporting workpapers that provide detail or are the source of information used in calculations, and the name, job title and telephone number of the person preparing the documents. Please identify the name, job title, location and telephone number of the record holder. Please provide all Excel and electronic fies on CD with formulas activated. REQUEST NO.1: Please provide a copy of the 2010 Idaho Irrigation Load Control Program Report. REQUEST NO.2: Please confirm that the Company proposes limiting participating sites to a minimum 50 hp pump size, resulting in an estimated elimination of 13 MW from the Program. REQUEST NO.3: If the previous inquiry is confirmed, does the Company believe it is appropriate to include minimum pump size in the tariff language? REQUEST NO.4: Please calculate the cost effectiveness of the Program, for 2010, implementing only the Company's proposed change to the opt-out penalty. Please provide all workpapers used in the calculation. REQUEST NO.5: Please provide a detailed list of each Control Event, time, date, number of sites interrpted, number of opt-outs, amount of MW curiled, and amount of MW opted out, for the 2010 Program. REQUEST NO.6: Please calculate the cost effectiveness of the Program, for 2010, implementing only the Company's proposed change to the credit payment. Please provide all workpapers used in the calculation. REQUEST NO.7: Please list any additional criteria beyond that included in the proposed tariff language the Company may consider in the paricipation selection process. FIRST PRODUCTION REQUEST TO PACIFICORP DBA ROCKY MOUNTAIN POWER 2 FEBRUARY 8, 2011 REQUEST NO.8: Please provide a copy of the February 15 letter sent to prospective paricipants. REQUEST NO.9: When wil the Company inform prospective participants of selection or exclusion from the Program prior to the star of the season? REQUEST NO. 10: Please list the substations and circuits experiencing voltage excursions AND provide a map locating the substations, circuits and participating irrigation customers. What percentage of participating substations does this represent? REQUEST NO. 11: Please define the types of voltage excursion the system undergoes during Program dispatch events. Explain the impact of each voltage excursion to the system. REQUEST NO. 12: What mitigation methods had the Company considered and/or tried to address the voltage excursions and load loss? REQUEST NO. 13: Does the Company have any type of Voltage Regulators in place in any of the circuits affected to maintain a constant voltage level? Explain why this method of voltage regulation does or does not work to address the voltage excursions and load loss. Identify which circuit does or does not have installed voltage control equipment. REQUEST NO. 14: On page 2 of the Application, the Company stated "the dominance of the participating agricultural pump loads on some circuits is simply beyond the compensatory abilities of the Company's installed voltage control equipment." What is the threshold point i.e., a percentage of the substation/circuit capacity, of each circuit when this circumstace wil occur? Please identify the threshold points separately for each circuit if they differ from each other. REQUEST NO. 15: Please explain how the Company determined the threshold points for the circuits. FIRST PRODUCTION REQUEST TO PACIFICORP DBA ROCKY MOUNTAIN POWER 3 FEBRUARY 8, 2011 DATED at Boise, Idaho, this ~~day of February 2011. IlJL~ -Neil Price Deputy Attorney General Technical Staff: Bryan Lanspery/l-9 TJ Golo/l 0- 15 i:umisc:prodreq/pace i i .6npbltj prod req i FIRST PRODUCTION REQUEST TO PACIFICORP DBA ROCKY MOUNTAIN POWER 4 FEBRUARY 8, 2011 CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS 8TH DAY OF FEBRUARY 2011, SERVED THE FOREGOING FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO PACIFICORP, IN CASE NO. PAC-E-11-06, BY MAILING A COPY THEREOF, POSTAGE PREPAID, TO THE FOLLOWING: TED WESTON ID REG AFFAIRS MGR ROCKY MOUNTAIN POWER 201 S MAIN ST STE 2300 SALT LAKE CITY UT 84111 E-MAIL: ted.weston(fpacificorp.com DANIEL E SOLANDER ROCKY MOUNTAIN POWER 201 S MAIN ST STE 2300 SAL T LAKE CITY UT 841 1 I E-MAIL: daniel.solanderaYpacificorp.com DATA REQUEST RESPONSE CENTER E-MAIL ONLY: dataequestßYpacificorp.com ~;n.kt SECRETARY CERTIFICATE OF SERVICE