Loading...
HomeMy WebLinkAbout20110112XRG to PAC 26-51.pdfPeter J. Richardson Gregory M. Adams Richardson & O'Lear, PLLC 515 N. 27th Street P.O. Box 7218 Boise, Idaho 83702 Telephone: (208) 938-7901 Fax: (208) 938-7904 peter~richardsonandolear..com greg($chardsonandolear .com iou JAN l 2 PH 2= 38 Attorneys for Complainants XRG-DP-7, XRG-DP-8, XRG-DP-9, XRG-DP-I0, LLCs BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION XRG-DP-7, XRG-DP-8, XRG-DP-9, XRG-DP- )10, LLCs, )Complainants, ) ) ) ) ) ) Case No. PAC-E-IO-08 PACIFICORP, DBA ROCKY MOUNTAIN POWER, Defendant. RESPONSES OF XRG-DP-7, XRG-DP- 8, XRG-DP-9, XRG-DP-lO, LLCs, TO ROCKY MOUNTAIN POWER'S SECOND SET OF PRODUCTION REQUESTS vs. Pursuat to Rule 225 of the Rules of Procedure of the Idaho Public Utilties Commission (the "Commission"), XRG-DP-7, XRG-DP-8, XRG-DP-9, XRG-DP-I0, LLCs (collectively "XRG" or "Complaiants") hereby provides the following responses to the Second Set of Production Requests of Rocky Mountain Power, served on December 22,2010. Each response was prepared by James Carkulis and Colln Rudeen ofXRG, in consultation with attorneys Peter Richardson and Greg Adams. Mr. Carkulis or Mr. Rudeen can sponsor the responses at a hearng. REQUEST FOR PRODUCTION NO. 26 Did XRG or Exergy ever contact Idaho Power Company about sellng output from the XRG projects, or any project that would use the same site (wind) leases as any of the XRG projects? If yes, please explain. XRG RESPONSE TO REQUEST NO. 26 XRG objects on the ground this request calls for irrelevant information. See XRG Response to Request 23. Without waiving this objection, XRG states as follows. As indicated in the 2007 leases provided in XRG's Response to Request No. 24, XRG's objective has been, and remains to be, to enter into long term agreements with Rocky Mountan Power. To date, Rocky Mountain Power has been less than receptive. XRG has not engaged in discussions to sell the power to other utilities. XRG LLCs' RESPONSES TO ROCKY MOUNTAIN POWER'S SECOND SET OF PRODUCTION REQUESTS - P AC-E- 1 0-08 PAGE 2 REQUEST FOR PRODUCTION NO. 27 Did XRG or Exergy ever contact A vista about sellng output from the XRG projects, or any project that would use the same site (wid) leases as any of the XRG projects? If yes, please explain. XRG RESPONSE TO REQUEST NO. 27 See XRG's Response to Request No. 26. XRG LLCs' RESPONSES TO ROCKY MOUNTAI POWER'S SECOND SET OF PRODUCTION REQUESTS - PAC-E- 1 0-08 PAGE 3 REQUEST FOR PRODUCTION NO. 28 Did XRG or Exergy ever contact any potential buyer other than Idaho Power Company, Avista or Rocky Mountain Power about sellng output from the XRG projects, or any project that would use the same site (wind) leases as any of the XRG projects? If yes, please explain. XRG RESPONSE TO REQUEST NO. 28 See XRG's Response to Request No. 26. XRG LLCs' RESPONSES TO ROCKY MOUNTAIN POWER'S SECOND SET OF PRODUCTION REQUESTS ~ P AC-E- 1 0-08 PAGE 4 REQUEST FOR PRODUCTION NO. 29 Did XRG and or James Carkulis market the XRG projects to potential investors or joint ventuers in 2009? If so, pleae provide all marketig materals discussing those projects that were shared with such persons or entities. XRG RESPONSE TO REQUEST NO. 29 XRG objects on the ground ths request is unduly burdensome and calls for irrelevant information. Without waiving ths objection, XRG states as follows. Yes. See XRG Response to Request No. 8, which includes Exergy's Janua 2009 "Strategic Sale or Parership Opportty" and its Januar 2009 "Exergy Book of Business - Strctud." The XRG projects subject to ths complaint are contaned in these documents as the "Malta Projects." To the extent that request calls for additional informal materials such as maps, emails, and other correspondence with potential investors or joint ventuers, XRG objects for the above-stated reasons. XRG LLCs' RESPONSES TO ROCKY MOUNTAIN POWER'S SECOND SET OF PRODUCTION REQUESTS - PAC-E- 1 0-08 PAGES REQUEST FOR PRODUCTION NO. 30 Did XRG and or James Carkulis market the XRG projects to potential investors or joint ventuers in 201 O? If so, please provide all marketing materials discussing those projects that were shared with such persons or entities. XRG RESPONSE TO REQUEST NO. 30 XRG objects on the ground this request is unduly burdensome and calls for irrelevant information. Without waiving this objection, XRG states as follows. Yes. See XRG's Response to Request No. 29. In 2010, XRG had communications with potential counter parties, which may have involved, among other materials, the materials included in XRG's Response to Request No. 29. XRG objects to providing fuer materials for the reasons stated XRG's Response to Request No. 29. XRG LLCs' RESPONSES TO ROCKY MOUNTAIN POWER'S SECOND SET OF PRODUCTION REQUESTS - PAC-E-I0-08 PAGE 6 REQUEST FOR PRODUCTION NO.3 1 Did XRG work on aspects of the XRG projects other than the PP A durng 2009? If so pleåse list all milestones (e.g. contracts awarded, engineering completed; permits grated, etc.) related to the XRG projects that occured in 2009. XRG RESPONSE TO REQUEST NO. 31 Exergy sufered setbacks in its development of the projects in 2009 due to Rocky Mounta Power's resistace to enterig into PPAs. Exergy had first submitted BPA interconnection requests on November 1, 2006 (BPA Queue Nos. G0245, G0246, G0247, G0248). XRG paid for and received feasibilty studies in November 2007, and continued though the study process retaiing those queue numbers until March 2009, when BPA deemed XRG's requests withdrawn due to å misunderstanding regarding payment of an additional $20,000 for an additional environmental study for each project - a tota of $80,000. At that time, Rocky Mountain Power had expressed its resistace to executing PPAs for all 4 projects, and XRG had to bear the futilty of its PP A effort in mind when committng additional fuds to the interconnection process. Rocky Mounta Power's delay was certnly a factor in XRG's inabilty to remai in the queue under those prior interconnects requests. Despite Rocky Mountain Power's resistace to PPAs in 2009, XRG did continue to work on the projects in 2009. That work included: . Engaged in landowner negotiations, and maintaned XRG's good stading on its leases. . Engaged a thd par to complete title and surey work on the lease sites to plan constrction, tubine and road layouts. . Continued wind data monitoring and analysis, which was initially commenced July 2006 with erection of met towers. . Continued Sodar monitoring and analysis of wind, which commenced initially in 2008. . Resubmitted Interconnection requests to BPA -- Queue Nos. G0388 (XRG-DP7 submitted 11/02/09), G0395 (XG DP8 submitted 11/23/09). XRG LLCs' RESPONSES TO ROCKY MOUNTAIN POWER'S SECOND SET OF PRODUCTION REQUESTS - PAC-E- 1 0-08 PAGE 7 REQUEST FOR PRODUCTION NO. 32 Did XRG work on aspects of the XRG projects other than the PP A during 201 O? If so please list all milestones (e.g. contracts awarded, engineering completed; permts granted, etc.) related to the XRG projects that occured in 2010. XRG RESPONSE TO REQUEST NO. 32 Despite Rocky Mountan Power's continued resistace to executing PPAs in 2010, XRG did continue to work on the projects in 2010. That work included: . Engaged third pary environmenta consultants who completed investigation into likely endangered species impacts. . Engaged in landowner negotiations, and maitaned XRG's good stading on its leases. . Continued wind data monitoring and anlysis, which was initially commenced July 2006 with erection of met towers. . Continued Soda monitoring and analysis of wind, which commenced intially in 2008. . Resubmitted Interconnection requests to BPA -- G041 1 (XG-DP9 submitted 3/12/10), and G0412 (XRG-DPlO submitted 3/12/10). Due to BPA's rejection of these submittals, XRG resubmitted the requests to comply with BPA's concerns. BPA accepted the submittal for XRG-DP9, which now has a Queue No. G0445 effective on 12/6/10. XRG is stil awaiting confrmation from BPA on the submittal and deposit for the XRG-DPI0 interconnection, which it signed and sent to BPA on 11/24/10. . Received completed interconnection system impact studies from BPA for Queue Nos. G0388 (XRG-DP7), G0395 (XRG DP8) and executed Facilities Study Agreements for same. . Engaged a thrd par consultat to complete a microwave bean study for all 4 projects, to ensure the projects will not interfere with any microwave tower operations. . Engaged a third par consultat to complete a study coordinating with the National Telecommunications and Information Administration to ensure all 4 projects will avoid interference with governent systems. . Initiated formal TSR process in order to become a BP A transmission customer and engaged in discussions with BP A transmission personnel regarding PTP trsmission from the XRG projects to Brady substation. XRG LLCs' RESPONSES TO ROCKY MOUNTAIN POWER'S SECOND SET OF PRODUCTION REQUESTS - PAC-E-I0-08 PAGE 8 REQUEST FOR PRODUCTION NO. 33 How many projects did Exergy develop to the point it obtaned one or more fuly executed PPAs with a counterpary in 2008? Pleae list each project, counterpar, and PP A execution date. XRG RESPONSE TO REQUEST NO. 33 XRG objects on the ground this request calls for irelevant information. Without waiving ths objection, XRG states as follows. XRG is not aware of any PP As executed by Exergy in 2008. XRG LLCs' RESPONSES TO ROCKY MOUNTAIN POWER'S SECOND SET OF PRODUCTION REQUESTS - PAC-E- 1 0-08 PAGE 9 REQUEST FOR PRODUCTION NO. 34 How many projects did Exergy develop to the point it obtaed one or more fully executed PP As with a counterparty in 2009? Please list each project, counterpary, and PPA execution date. XRG RESPONSE TO REQUEST NO. 34 XRG objects on the ground ths request calls for irelevant information. Without waiving this objection, XRG states as follows. Exergy developed the following projects to the point of fully execute PP A in 2009: . Yahoo Creek Wind Park with Idaho Power Company, executed 7/9/2009 . Camp Reed Wind Park with Idaho Power Company, executed 7/9/2009 . Payne's Ferr Wind Park with Idaho Power Company, executed 7/9/2009 XRG LLCs' RESPONSES TO ROCKY MOUNTAIN POWER'S SECOND SET OF PRODUCTION REQUESTS - PAC-E- 10-08 PAGE 10 REQUEST FOR PRODUCTION NO. 35 How many projects did Exergy develop to the point it obtained one or more fully executed PP As with a counterpar in 2010? Please list each project, counterpar, and PPA execution date. XRG RESPONSE TO REQUEST NO. 35 XRG objects on the ground ths request calls for irrelevant inormation. Without waiving ths objection, XRG states as follows. Exergy developed the following projects to the point of fully execute PPA in 2010: . Big Blue Wind Far with Nortern States Power Company d//a Xcel Energy, executed in 7/10 and approved by the PUC on 8/26/2010 . Deep Creek Wind Park with Idaho Power Company, executed 12/10/2010 . Cottonwood Wind Park with Idaho Power Company, executed 12/10/2010 . Salmon Creek Wind Park with Idaho Power Company, executed 12/10/2010 . Rogerson Flats Wind Park with Idaho Power Company, executed 12/10/2010 XRG LLCs' RESPONSES TO ROCKY MOUNTAI POWER'S SECOND SET OF PRODUCTION REQUESTS - PAC-E-I0-08 PAGE 11 REQUEST FOR PRODUCTION NO. 36 Please provide the name of all entities that have invested in, or taen an ownership interest in the XRG projects. XRG RESPONSE TO REQUEST NO. 36 XRG objects on the ground ths request calls for irrelevant information. Without waiving this objection, XRG states as follows. Exergy and the XRG LLCs are sole owners ofthe rights to develop the XRG projects at issue in the Complaint. XRG LLCs' RESPONSES TO ROCKY MOUNTAIN POWER'S SECOND SET OF PRODUCTION REQUESTS ~ PAC-E- 1 0-08 PAGE 12 REQUEST FOR PRODUCTION NO. 37 Does XRG curntly have rights to interconnect the XRG projects to Bonneville Power Adminstrtion's (BPA's) system? If yes, did XRG control such rights on December 14, 2010? On March is, 2010? On November 10, 2009? On October 2, 2009? On Januar 21, 2009? Please anwer separately for each date. XRG RESPONSE TO REQUEST NO. 37 XRG objects on the ground this request calls for irrelevant information. XRG maintains its right to obligate itself to PP As, and the risks inherent therewith, prior to securng interconnection rights and transmission rights for the entire output. Reference, e.g., IPUC Order No. 32144. XRG fuer objects on the ground tht the request is ambiguous as to the meanng of "rights." Without waiving these objections, XRG states as follows. See XRG's Response to Request Nos. 31 and 32 for XRG's efforts and rights obtaned regarding interconnection. The timing of the interconnection process with the PP A process has been diffcult, and has been made no easier by Rocky Mountan Power's reluctace to execute PPAs for thes.e projects since the PPA requests submitted Januar 21,2009. XRG has initiated and paid for several interconnection applications and studies since 2006. Each interconnection application requires a $2,SOO deposit, and each system impact study deposit is $S,OOO. Each Facilties Study deposit is $7,000. BPA additionally requested a $20,000 deposit for an environmental study for each project in Janua 2009, which would have been an $80,000 deposit at a time when Rocky Mountan Power maintained it could not accept the output of all 4 projects. XRG has incured substatial interconnection study costs, and, largely as a result of the delay in securing PPAs, has been bumped out of its initial queue positions for these projects. Neverteless, XRG has continued to proceed through BPA's interconnection process and has curent rights to interconnection proceeding through BPA's study processes. In preparing this response, XRG discovered additional correspondence with BP A not provided in XRG's initial response to Request No.6. XRG has omitted confidential study materials for the reasons explained in XRG's Response to Request No. 49. XRG hereby provides that additional correspondence as XRG Attachment to RMP Request No. 37. XRG LLCs' RESPONSES TO ROCKY MOUNTAIN POWER'S SECOND SET OF PRODUCTION REQUESTS - PAC-E- 10-08 PAGE 13 REQUEST FOR PRODUCTION NO. 38 Does XRG curently have Firm rights as defined in the tranmission service provider's OATT to deliver all output from the XRG projects across the transmission services provider's system to Rocky Mountain Power at Brady for the full 20-year term requested in the PPAs? If yes, please describe the specific transmission provider(s) and did XRG control such rights on December 14, 2010? On March 15, 2010? On November 10, 2009? On October 2, 2009? On Janua 21, 2009? Please answer separately for each date. If no, please explain curent status of transmission service request(s) with the transmission services provider(s). XRG RESPONSE TO REQUEST NO. 38 XRG objects on the ground this request calls for irrelevant information. XRG maintans its right to obligate itself to PP As, and the risks inherent therewith, prior to securing interconnection rights and transmission rights for the entire output. Reference, e.g., IPUC Order No. 32144. Without waiving this objection, XRG states as follows. See XRG's Response to Request No. 32 for XRG's effort and rights to PTP tranmission. As expressed to Rocky Mountan Power many times previously, and most recently at the meeting between the paries on December 7, 2010 and in XRG's letter and attchments dated December 14,2010, XRG is confdent that transmission to Rocky Mountain Power will be achievable and cost-effective. Ths is paricularly so if Rocky Mountan Power agrees to accept conditional firm transmission, which it stated it was able to do when the paries met on December 7, 2010. XRG LLCs' RESPONSES TO ROCKY MOUNTAIN POWER'S SECOND SET OF PRODUCTION REQUESTS - P AC-E- 1 0-08 PAGE 14 REQUEST FOR PRODUCTION NO. 39 Wht is the earliest date at which firm transmission for the XRG projects to Rocky Mountan Power's system will be available? Please explain. XRG RESPONSE TO REQUEST NO. 39 As stated in XRG's letter to Rocky Mountan Power on December 14,2010, XRG has proposed an online date of Janua 1,2013, and rights will be available at that time. XRG LLCs' RESPONSES TO ROCKY MOUNTAI POWER'S SECOND SET OF PRODUCTION REQUESTS - PAC-E- 10-08 PAGE 15 REQUEST FOR PRODUCTION NO. 40 Does XRG seek to deliver and sell 70 MW of net output to Rocky Mountain Power under the PP As sought from Rocky Mountain Power or does XRG seek to deliver and sell 80 MW of net output to Rocky Mountain Power under the PP As sought from Rocky Mountain Power? If 80 MW, when did XRG first make Rocky Mountain Power aware that it seeks to sell 80 MW of net output? Please provide any documentation of such notice. XRG RESPONSE TO REQUEST NO. 40 70 MW. Reference Complaint, ~ 6. XRG LLCs' RESPONSES TO ROCKY MOUNTAIN POWER'S SECOND SET OF PRODUCTION REQUESTS - P AC-E- 1 0-08 PAGE 16 REQUEST FOR PRODUCTION NO. 41 Please describe and provide a one-line diagram of the physical path by which net outut from the XRG projects will be delivered to Rocky Mountan Power's system. Please describe the tota transmission capacity on each segment of the path, the available transmission capacity on each segment, and who owns each segment of such path. XRG RESPONSE TO REQUEST NO.4 1 XRG objects on the ground this request cals for irrelevant inormation and documents not in the possession ofXRG. XRG maintans its right to obligate itself to PPAs, and the risks inerent therewith, prior to securng interconnection rights and transmission rights for the entire output. Reference, e.g., IPUC Order No. 32144. XRG LLCs' RESPONSES TO ROCKY MOUNTAIN POWER'S SECOND SET OF PRODUCTION REQUESTS - PAC-E- 10-08 PAGE 17 REQUEST FOR PRODUCTION NO. 42 Please describe what steps XRG must tae before it has a legal right to firm transmission (e.g. Firm PTP or Conditional Firm PTP) from the XRG projects to Rocky Mountain Power's system in the amount needed to deliver all net output for the XRG projects. XRG RESPONSE TO REQUEST NO. 42 XRG objects on the ground this request calls for irrelevant information and requests a legal opinion. XRG maintains its right to obligate itself to PP As, and the risks inherent therewith, prior to securng interconnection rights and trsmission rights for the entire output. Reference, e.g., IPUC Order No. 32144. XRG LLCs' RESPONSES TO ROCKY MOUNTAIN POWER'S SECOND SET OF PRODUCTION REQUESTS - PAC-E-1O-08 PAGE 18 REQUEST FOR PRODUCTION NO. 43 Please refer to XRG's response to Rocky Mountan Power's Production Request 8. Has XRG provided all project schedules (scoping, finacing, development, etc.) possessed by Exergy or XRG for the XRG projects, since Janua 21, 2008? XRG RESPONSE TO REQUEST NO. 43 Yes. XRG ha no formal schedules for development of these projects. Thus far, XRG has self- financed the projects as the need for ea.ch development step approaches. Any thd-pary financing schedules are put in place afer a PP A is secured. Based on Exergy's past experience and contacts as well as the several years of wind data for the sites, it expects no trouble receiving finacing for the projects once PPAs are executed. Given Rocky Mountan Power's reluctace to execute PP As, constrction and development schedules would be premature at ths stage. XRG LLCs' RESPONSES TO ROCKY MOUNTAI POWER'S SECOND SET OF PRODUCTION REQUESTS - PAC-E-I0..08 PAGE 19 REQUEST FOR PRODUCTION NO. 44 Please refer to your response to Rocky Mountan Power Production Request No. 15. Please itemize the expenses listed generally in XRG's response. For each expense, provide the dates when they were incured and XRG's basis for its cost estimate. XRG RESPONSE TO REQUEST NO. 44 XRG objects on the ground ths request is unduly burdensome and calls for irrelevant information. XRG also objects on the ground that this request inquires into the XRG QFs' finances. See 18 C.F.R. § 292.602. XRG LLCs' RESPONSES TO ROCKY MOUNTAIN POWER'S SECOND SET OF PRODUCTION REQUESTS - PAC-E-I0-08 PAGE 20 REQUEST FOR PRODUCTION NO. 45 Pleas refer to XRG's response to Rocky Mountan Power Request No. 19. IfXRG intended to obligate itself to the May 11,2009 PPA on or before March 12,2010, why didn't XRG manfest ths intent in explicit languge (or by tenderig such PPAs to Rocky Mountan Power) on or prior to March 12, 201 O? XRG RESPONSE TO REQUEST NO. 45 XRG did c01!it in explicit languge. See XRG's Response to Request No. 16. XRG maintans that Rocky Mountan Power resisted XRG's attempts to obligate itself to PPAsby asserting from March 23,2009 though September 21,2010 ''tat available transmission capacity from the proposed delivery point - Brady substation - was insufficient for accepting more than 23 megawatts of net output from XRG's proposed qualifying facilities." Reference Answer il 8. Indeed the very correspondence referred to in this request from May 1 1, 2009, stated, "PacifiCorp does not have sufcient transmission at Borah or Brady to accept any project greater than 23 MW and you selected one project, XRG-DPI0, that would be developed into a PPA." Reference Rocky Mountan Power First Production Request, Exhibit A-15. XRG intended to develop all 4 projects. Rocky Mountain Power stated it would only accept 1 project for a PP A. To submit PPAs for all 4 projects therefore seemed to XRG to be an act of futilty. XRG LLCs' RESPONSES TO ROCKY MOUNTAIN POWER'S SECOND SET OF PRODUCTION REQUESTS - PAC-E- 10-08 PAGE 21 REQUEST FOR PRODUCTION NO. 46 Please refer to XRG's Response to Production Request NO.8. Is the Janua 2009 "Strategic Sale or Parership Opportty" document provided by XRG the latest version of that document? If not, please provide all post-2009 versions. XRG RESPONSE TO REQUEST NO. 46 XRG objects on the ground this request calls for irrelevant information. Without waiving this objection, XRG states as follows. Yes. That is the latest version of the document. XRG LLCs' RESPONSES TO ROCKY MOUNTAIN POWER'S SECOND SET OF PRODUCTION REQUESTS - PAC-E-I0-08 PAGE 22 REQUEST FOR PRODUCTION NO. 47 Please refer to XRG's Response to Production Request No.8. Is the Januar 2009 "Exergy Book of Business-Strctured" document provided by XRG the latest version of that document? If not, please provide all post-2009 versions. XRG RESPONSE TO REQUEST NO. 47 XRG objects on the ground ths request calls for irrelevant information. Without waiving ths objection, XRG states as follows. Yes. That is the latest version of the document. XRG LLCs' RESPONSES TO ROCKY MOUNTAIN POWER'S SECOND SET OF PRODUCTION REQUESTS - PAC-E- 1 0-08 PAGE 23 REQUEST FOR PRODUCTION NO. 48 In the documents provided in response to Production Request No. 46 and Production Request No. 47, above, which projects descnbed therein are the XRG projects subject to ths Complaint? XRG RESPONSE TO REQUEST NO. 48 The XRG projects referred to in the Complaint are referred to as the "Malta" project. XRG LLCs' RESPONSES TO ROCKY MOUNTAIN POWER'S SECOND SET OF PRODUCTION REQUESTS - PAC-E- 1 0-08 PAGE 24 REQUEST .FOR PRODUCTION NO. 49 Please provide copies of all agreements, correspondence and documentation demonstrating XRG's proof of rights to (1) interconnect to BPA's tranmission system, either now or since Janua 21, 2008 and; (2) deliver net output across BP A transmission on a long-term firm basis as defined in BPA's OATT to the proposed Point of Delivery with Rocky Mounta Power, either now or since Janua 21, 2008, for the XRG projects. XRG RESPONSE TO REQUEST NO. 49 XRG objects on the ground ths request is unduly burdensome and calls for irrelevant infonnation. XRG maintans its right to obligate itself to PP As, and the risks inherent therewith, prior to securng interconnection rights and transmission rights for the entire output. Reference, e.g., IPUC Order No. 32144. XRG fuer objects on the ground that the request is ambiguous as to the meaning of "rights." Without waiving these objections, XRG states as follows. See XRG's Response to Request Nos. 31, 32, 37, and 38. To the extent this request calls for interconnection and transmission studies, XRG wil not provide the same. These studies are generally confidential between BPA and XRG, as stated in the July 15,2010 BPA letters providing system impact studies. XRG has provided the interconnection queue numbers for the projects where Rocky Mountain Power can view the public inormation on BPA's OASIS website. For on-system PUR A projects, Rocky Mounta Power C&T may not demand such transmission studies due to FERC's requirement for fuctional separation of the merchant and tranmission sides of the Company. Rocky Mountain power has provided no reason why XRG's off-system QFs must provide more inormation than on-system QFs to obtan a PPA. Therefore, XRG objects to providing confidential interconnection studies. XRG LLCs'RESPONSES TO ROCKY MOUNTAIN POWER'S SECOND SET OF PRODUCTION REQUESTS - PAC-E-I0-08 PAGE 25 REQUEST FOR PRODUCTION NO. SO Wil the delivery of net output from the XRG projects to the Point of Delivery with Rocky Mountain Power require any form of a locational swap or exchange of power with the transmission services provider( s) or other utilities? If yes, please explai in detail and provide all communcation and documentation with the transmission servces provider(s) and/or other utilities on swaps or exchanges. XRG RESPONSE TO REQUEST NO. SO XRG objects on the ground this request calls for irrelevant information. XRG maintans its right to obligate itself to PP As, and the risks inherent therewith, prior to securng interconnection rights and transmission rights for the entire output. Reference, e.g., IPUC Order No. 32144. Without waiving this objection, XRG states as follows. No. XRG is not planng a swap or exchange. XRG LLCs' RESPONSES TO ROCKY MOUNTAIN POWER'S SECOND SET OF PRODUCTION REQUESTS - PAC-E-I0-08 PAGE 26 REQUEST FOR .PRODUCTION NO. 51 Did XRG ever apply to BP A for Firm transmission for the XRG Projects? What is the curent status of those applications? XRG RESPONSE TO REQUEST NO.5 1 XRG objects on the ground ths request calls for irrelevant information. XRG maitains its right to obligate itself to PP As, and the risks inherent therewith, prior to securng interconnection rights and transmission rights for the entie output. Reference, e.g., IPUC Order No. 32144. Without waiving this objection, XRG states as follows. Yes. See XRG's Responses to Requests No. 32 and 39. XRG LLCs' RESPONSES TO ROCKY MOUNTAIN POWER'S SECOND SET OF PRODUCTION REQUESTS - PAC-E-I0-08 PAGE 27 ~ Respectfully submitted on this \11 day of Januar, 2011. RICHASON & O'LEARY, PLLCQ, J. Richardson r ory M. Adams Attorneys for XRG LLCs XRG LLCs' RESPONSES TO ROCKY MOUNTAIN POWER'S SECOND SET OF PRODUCTION REQUESTS - P AC-E- 1 0-08 PAGE 28 CERTIFICATE OF SERVICE I HEREBY CERTIFY that on the ~1-f'day of Janua, 2011, a tre and correct copy of the withn and foregoing RESPONSES OF XRG-DP-7, XRG-DP-8, XRG-DP-9, XRG-DP-lO, LLCs, TO ROCKY MOUNTAI POWER'S SECOND SET OF PRODUCTION REQUESTS was served in the maner shown to: Jean Jewell Commission Secreta Idaho Public Utilties Commssion 472 W. Washington Boise, ID 83702 jean.ìewell~puc.idaho. gov x. Hand Delivery _U .S. Mail, postage pre-paid Facsimile lL Electronic Mail Mark C. Moench Rocky Mounta Power 201 South Main Street, Suite 2300 Salt Lake City, UT 8411 1 Mark.moench~pacificorp.com __ Hand Delivery X U.S. Mail, postage pre-paid Facsimile X Electronic Mail Danel E. Solander Rocky Mountain Power 201 South Main Street, Suite 2300 Salt Lae City, UT 84111 Daniel.solander~acificorp.com _ Hand Delivery X U.S. Mail, postage pre-paid Facsimile X Electronic Mail Jeffey S. Lovinger Lovinger Kaufman LLP 825 NE Multnomah, Suite 925 Portland, OR 97232 lovinger~LKLaw.com __ Hand Delivery X U.S. Mail, postage pre-paid Facsimile lL Electronic Mail Kenneth E. Kaufan Lovinger Kaufman LLP 825 NE Multnomah, Suite 925 Portland, OR 97232 Kaufman~LKLaw.com _ Hand Delivery XU.S. Mail, postage pre-paid Facsimile lL Electronic Mail By:~C# Gregory M. Adams RICHASON & O'LEARY PLLC Attorneys for Complainant XRG LLCs' RESPONSES TO ROCKY MOUNTAIN POWER'S SECOND SET OF PRODUCTION REQUESTS - PAC-E-I0-08 PAGE 29 Case No. PAC..E-IO..08 XRG-DP-7 XRG-DW~b~~F XRG-DP-l 0 LLCs, , ,." TO ROCKY MOUNTAIN POWER'S SECOND SET OF PRODUCTION REQUESTS XRG Attachment to RMP Request No. 37. "'~"'~'_'_""-'---_""'''.--,,,,-,-...._._~--, --"'-'-_"'_~"'~"~'-"'''-''--'-'",., "---".-._.-..._---.. ,,',_. ."-......._-- --""'-" "_-,.'. ..__.., "~"" ..-- '-., XRG Response to RMP 37 - page i Dfnt of Energy BpnellPow Adisat P.O. Bo 6140 VanUVel. WA 984409 TRSMfSfO sevic Janua 22 20 In NPy refe to: TSElP~2 Mr. J.. CaÎ$~ Magw P. ~t Gr of Id, LL80W.~.8utel20 Bose, ID 33702 t De Mr. Cautis: ..~ o.ve~t Oip ()f ~.L. (Eergy) submitted a Small Getot ~rt..l'l1to theBoiie Power Adininistrtiøn (BPA), dated Novembe i. 20. Sf A re.~. this l'tit OJ Novebe 1, 20, and entere it in the Geor l~tiQÐ Queue as Requet No. 00248 (Rues). The Reque~. inte~necon()f 2l. ~W of wind ..ion in Caa County, Idao. The projec is i~ as the XRG-J)P-lO Prjee (Pjet). As . ~ ~y~ BPA mu coside potetial environmental imps ~it$~"i. to tlPrjec ~t to _ NatønlSvironmtal Policy Act (NEPA).BPAmuai 00le tlii1lts .-lting fr the teably forble prvate acions that would be ~ltwitb in. inf.ØD() of th ~ Proect into BPA's tra$mjS$on~ ~, BPAmay ha-. obtipt01 to comply with oter Fe ervirorntallaws for its acOl ~to intetion of th pr Prject. For the reasns, a stuy mUSt be ~.n to .. tli cnvita impa of the Prject. Bn~ foX'.)' $ÏgnW' ar two orgiaJof Environmental Stuy Agt No. 09- 139 (~t) beee &qy 8f BPA. Among other things, tli Agnt prvide forf~S or th Envi1'runtai Stuy uid spifies mileones in which Exery must prvide cen infoton to BPA. If yo co~ pl sigh bo orginals, retain on ongìnal for your re, and return th otr orsi_ to OR of th following ad~: "'*-~.1g:U.S. ~'un of Bn Bonelle Poer AdttniltonATT: Kelly Joh - TPP-4 P.O. Bo 6140 VimVlt, WA 936 O,.ifby ewrnigM.I1K: U.S. :Ðpamntof engy BonneviUe Powe Administion A'T: Ke.lly Johnsn - TPPP-4 7500 NE 4 ¡st Str Suite 130 Vancouver. WA 982 Phne: (36)619-675 XRG Response to RMP 37 - page 2 2 The reuire advanc payment of $2.00 can be ma either electrnieaHyor by chk (instrtions enclos). Plea refere Agrmet No. 09X~ 13921 when retl~_~t. The executed Agrment and paymet must be reived by CIOl of Busine (COB) on February 20,200. . . At a minimum. failure by Exergy to execute and return the A~-~l paymet by COB On Febru 20. 200. will indicate that ~ .Í$~~Jl\witJt. dilgee with its Generator Interconnection Request and will permitB'A.~~~Y.fJ~ proessing of Exergy's Interconnection Request. If you have any questions. feel fr to contact me at (360)6194514 or Jennifer.~toz. Environmental Speialist. at (503) 230-3233. SincerelYí4¿'~~ Erc K. TaylorTmnS8 Acct ExecveTrasmon Sa 3 Enlosre ---~~---------_.- -----.--"-,.--.,,_.--...,._~"'_.,',._--~..._.~--_...,,--;",.~..--..'~-"---~'~~'--""';--"",-""",. XRG Response to RMP 37 - page 3 Agrement No. 09X-.13927 BHItONTAL STUDY AGREEME Tlll Äf'~ is ~ an ente into mii _ day of .20.by" be ..y De~ ~ of Ida, a I1mied liablity comy orgize and wa.. tÀ'" øf th St* t) id \ItetioA Cu. and th U.S. De of as i". ~Ùl hy .. tll' th BovilJe Power Adisttion('~" Pm~ ~neiòn Cume and Transmission Prvide each may be refer to as a "Pary," or ooUectively as th "Paries." t IlITALS Wla., .~on Custor has submi an iRteonnecion reue to Traion Prvide to int~t li to 20 MW of win generon from the Intercnnetion Cusom's pro XkG-DP-10 Prje (Pjet) with th Feral Columba Rive Traisson Sysm (FeTS); WlNS T~ssio Prvi en the .Rue into the GeonInt~_ i~ ~ as Reue No. 004$; WI in maing a ~ision concrning the pro intercnneion.T~OI PrvW, as a Fe agy. mu includ a conideon of potial eD..Sl iiJ if ils acti rd to internection of the Prjet, pursuant to the Naton Enviromel Poy Ac (N A); WlKA Tt¥~ Pr'\ide mu conider tl impts resulting fr th re~y ....~ pr"al ~0Ð it woud be asat with th intenection; WB TrSlon Prvide may also have obligaons to coly with ot~ oa~ laW;J. Sl as th &dre Speies Ac (BA) an the NationalHî ~ .k (NA). fo it¡ acio reat to th il\ection of the Prjet; WIAl ~ ~ shal prvi Tran Prvide notfiion no .. _ 8111 (15) ltJl pØ to puc meings he by Casia Coy or any otapitie auty as pa of th boy's site peittns pr in ordr for the T~ . . to atd th meng an as appat, explai th role of poally intercneng the Prject an ac cots relevant to Tramisson Prvides NBPA anysis. TO NOW, TI.,I" ÎA ~ of and sujet to th mutua covenants cotainehein. th Pa .. ..follows: 1. r~~P7.r'8 Scf8 of Work: At tb Intercnetion Customer's ~ Trwsson Prvide win cond ~ss aeivitie for compliance wih. NlA and ot environmeta laws related to the propod Prje. Enviro SWy Agrt Geon Intercon Reque No. 008 Page 1 of7 ~......~.~., ..,-~"--.",,,,~--,". .,'- ....--~ _._+ ''''',,-- XRG Response to RMP 37 - page 4 Agrement No. 09X-13927 (a) Transmission Prvider will prepar a R.ecor of Oeision (ROD) tiere to Tr~mission Provider's Business Plan~vÍl~n~lJ~~t S~atemnt (BPES) for NEA docmentation ofTras~~i~llY:l~'Sp~actions related to the intenetion of th pto_~.~~i~ Provider rerv the right to comme a Prjeç-~i~çBnvj~nttd Impact Statemet (E) in acrdce with Secon l(o)bèow. Transmission Provider wil condut a tiere ROD prSOy peõiiJlg the following: r i. Conducting site visits and attendng metings, as ne, to unand the scop of the Projet and to deermine and ev~uate Transmisson Prvide's prpo action for th Pr, as well as the charr of the affected environment; ii. Attding public meetings held by Cassia CØUy as .paor'M boy's site peitting profor..tb Prjeçi in ~ tQ~plai Trasmission Prvidet s role in potially imerene~th~jec and to accept comments relevan to Transræ PrviWs NSA analysis; iii. Conng vanou other puic involvet.aevi, .~~crtion of a mail list, mailings,.~Jt of.~ ~~iån creion of a webpage(s) for the Pfoje~ an iv. Deding whthr to apve Qi pro ~ ad prpang and executing a ROD tier to th BPHS'th dos this deision. (b) If at any time Tramission Prvide ~ at its sole direon lbthe tiered ROD prs is no the apprat NBA doume for the prop Prject. suh as due to significat puic, eny. ortrhaconc that ar relting in unrelve , Prvirees th nght, at its so discon. to coie a BlS und NEA. If Transmission Prvide tMes se a . ,it willse a new bu reue to Ineroiion Cufor any ad work that may be reuire. (c) Trasmission Provide WiUCOply with othe Fe cnvirmta laWS. such as ESA and NHA, as aplicable by pecmng the fo1lowing: i. Idetifying al aplicale Peraetri~l~l~Òl. review. and peit reuirets f() its ac(s) relatto tl pro intercnetion. including but no lini~to ESA Secn 1 an Nl A $eçtion 106 consta9J ai QôUålóe; Environmental Study Agrmet Genetion Intercnneon Request No. 00248 Pa2of7 ~"'._"'~"'--'-''''"'-'~'''-'''''._'''''-~,...",-. .__. "'-". ".,--.,'.-- XRG Response to RMP 37 - page 5 Agrment No. 09-13927 ii. Colting ab thes reuirements with reevant Feral. trbal. .. an local ~ies-jusdctons. as applicale; and ii. ~g_es aplica and apva dou.mets, as~at. r. (4) T..,ainn PtYi willus ap_enviro~tal da colleted fortb ~Ptbythe Imneon Cu and any consultant(s) that mtefiti Customr may ren. Trainissøn Prvider teNes the right to gathr iIldet dat on the prpo Trtinission Prvider facilties site. as nee. Any such data collecion activities wil be at th cot of the Internecion Cusme. and wiUbein adtion to the costs debe in Section 2 below. (e) As .. .~ witiu1timareponsibilíty for theSêandootent of the ~taQltlndNEPAan otlFelenvÌTnmmLal Jaws, Tra~mi8$îon Prvidershall retain final auority o_thescpe and ~ ôl th tl ROD and other necesary Federal enviromental~~. (f The Pat sh work tothr coravely (l envirome data ~øi..~.~.. ~tmtion Cl!Ølr shalt .~..~ Ptvide with alln~ daa on site chaerstics andptjet f1iîUti in a timely fasion. (g) Trsmisson Prvide wiU us go faith effor to comple its tier ROD for ~pr~t ina es..in 3-6 mondi; fro when the Tra$rsson ~.'.mi lb. it høteveS4ffåetJyooplee infotioo~lø ~6(i) an (bJófthì ~t. Notwithtading this.~.~ Trøison PrviisMt obligaed to issue its tie liOÐfor.tb Prje until afth b1~necot Custom has ~ aU of its ot Federal, stat. andlol envirotal pres for the Preø, inclødiigreluton Qf any âdnistrve or judcial aps. eØ1$l wi its bune præs. In adtion. Trasmission Prvide ~ th right to revise th esmat date of coinon of theenviri:tal study pro as ne. 2. Pttymm: Ca) T~i~ Pr wiUspfytl est~ cos of the environmental sty ~san eJ envi~ wor by Ttmisson Provid conduCl undr Attint A, Finacial Teran Cotion Stamet. (0) in~ Cuom shaH submit a det of $20.00 to thTrasaion Pride in acdanc with Attmet A. Envi Study A~rnt Geiønlntooection ~uet No. 00248 Page 3 of7 ......_-,_... -~._--,- ._- .__._..,..,.,......__.,..----'" ,,---- _.'-- XRG Response to RMP 37 - page 6 Agrment No. 09-13927 (c) Interconneio Custor unta and ag that the desit provide puruant to Setions 2(a) and 2(b) resets th estimated cost of all environmetal wor to be peorm by Trasmission Provider under Section i. Interconnection Customer furter undtand and agres that the actual costs of this work may differ frm the Trasmission Prvide's estimatedcosi. Interconnetion. Cnstomer shall pay to Transmission provider theaetual cøstsincur by 'lransfli~i~ pl'~ìder in performing th environmetal work. unar this. Agrmel1t, plusapplìeable overhd rate as índicated in Attachment A. t 3. Preliminary Environmental Revew: Interconnection Customer shall submit information necsar for preliminary environmenta review to Trasmisson Prvider withn thirty (36) calendar days of the date of execution of this Agrmet. This info~Qn include the following: i. Project facilties ma, includingth~cai Informon System (GIS) layers of wind Project boundies, if available. ii. Deaile Prjec deripton, includgataJ1nim:um th leal deri.pton of the Prt ~ the ~x.jrnai llumber. size andlocion of turne, an a ~ptono-f th prpo ttsnssion line, aces ro, opraticm an maintence, communications,. andot pr Prje facilties; iii. Nam an adds of all pry ow wihin the Project ar an within a on mUe raius of the Prje facilities. public agenci kno by lnieecon Cus to have jurisdiction over the Prjet, and any oter indivi or enty known to have an int in th pr Projet; an iv. Copies of all inforon relat t&any pettng alrey condute for th. Prject, 4. Study Plan: (a) Interconnetion Custome shll provide a Stuy Plan to Trasmi$$ion Prvider fo all fie1d work. ne to~ycØl:plel.eenvi.rometal review for th .pr Prt withi si:;ty(~)~ clys of executionof this Agrt. (b) lnteon Custom wíU includ a brfdeript o-f J.terneonCusl.~'s.pr fid $ludan ~r ~co~ion acvities, includng a proed schedule, in the Study Plan. Interonnection Custome ~trji:n~ta Study Ag~nt Getiòn Interèrttton Reuest No. 00248 Page40f7 .-.--.--...-,,-......--.........--..........-............,'''.....-. XRG Response to RMP 37 - page 7 Agrmet No. 09X..13927 will also dilo in th Stud Plan any ongoing st and includ a summa of the reultsof any stes aly co. (ç) ~_ot Cuwìll aI$OdisclOl in th Stu Plan any known~ Rci~of ot st. Fe, éflooo(iti. (d) T~$$ØlPævìde wìl review an eithe apvetbe Study Plan Or give'QClt( ~ CU$toof revisio ~ to th plan within SèVê ('1) (:~.)i()frept of th Stu Pfan. Ifrevisions are ~ ~aeon Custom shal revise _d reit th Stud Plan toT~ion Prvi$ Within fourtee(l4) calar days after notice from the Ttamission Prvi. t (e) Tnmas Prvi may re stus re fro the Intercnecon Cus tb 4eail th Innetion Cusoi s prgr in completing th St Pl. If reue Intenetion Cutom shall prvide Trass Prvide with th st rert within seve (J) calenda days. 5. Field Work a,uJ Daa Collecion: (a) Within twelve (12) moths of exêCtlø of ths ~t. aU field wor aD da .ç.1e AO in th Sty Pla wil be completd byIn~eulO. (b) IfTr Prvide dees, at its sole discon. that the fiel wo lIor da coleon do not me th reuireme of NBP A or its oboa UD ot Fe envirolaw~ Tramiion Prvide ha !b rigb to, at de expe of lnneon Cusom, hire a third pa coor to coplet any nery fu stes. TheInteuc Cume und an ag that the cot of adtional stdies wiD be above and be any esti prde or pror dets sumitt du to this Agmet. 6. EiwirØlí31tiIRerts: (å) Wiln fift (IS) moth of execution of this Agrt, Internnecon CUsrnr $h1.ptWl ~ me, or o(agi up dørnta to Transmisson Prvîder that prvide th methodlo and reults of in (reId.wo and daaoollecionconue. (I:) Inton Ciimeshl also prvide as so as it be av$it~, aIym'rJ'menta ~ÔQ for th ~Prjet~ by~a Coty as pa.oftñ gO\melabø's site petting pr for the Prjet, so that this informaton ca be incortêinto th ti ROD to be pre by Trasnssion Prvide. Envi~ Stiy Agrmet Oeneiioo ~netionReque No. 0028 PagS of7 -",. ,_........,....,-- ...~--'.".,. "'~- XRG Response to RMP 37 - page 8 Agrment No. 09TX-13927 7. Dtie Diigence: (a) Interconnection Custme shall pro with øuøi~ienceW'ith its resibilties idetified in this Agrt. lfTtånssson Pmviderdeteines that Intercnnection Customer is noprng with du díligence~ Trasmssion Prvider wiUprQvki wttt~ notiOèro Inte(Çneion Custom. Inrcnnection. Cutom Wil then have foureen (14) cale days to provi a wrine ~. eithertOrrcting the deficiency or prviding a ren acable to. Tr~mi$Sion Pmvider as to why Inærcøonectipn Custome lias nøt~wìth due diligence or believes that it has proceed with due diligence. t (b) Internetion Custome shall exer~ dueçjm~ to timely complete and prvide to Trasmission Prvide copi ofatliiúortion rela.te to pernttng conucte for th Project. Such inføri() shåll includ, but is n€X limite to, Enery Facilty Sitig Coil sitecefretion, and relatd permits; or related pennits; and state, loal or county siting permits. 8. Governing La: This Agrment shaH be interpted costn and enføred in acrdan with Feral law. 9. Waiver: Th faìlure of a Part to this Agr.ttoi1llslon.any occasion. upon strict performce of any provision or this Ag~nt wm not be considere a waiver of any obligation, right, or duty of. or i~ epo.sucbPay. Any waiver at any time by eithe Pa of its tiglwitl..~. to this Agrment slall not be de a continuing waiver or a.waivèt WÌÛ1~pet to any other failure to comply with any other dty, ri~prQ1lJ,~ ddiis Agrent. Any reueted waiver of this AgrintsballbePf'Vl~in wrtjng. 10. Anie1'dment: Th Pares may amend this Agrt by a wrtte instrment duly executed by the Parties. 11. Signatures: The signtores reret that !My are autbo¡fze to enter into this Amendment on behalf of the Pary for whom they sign. 12. This Ageemet is effective on th date of execon by th Paes. 13. Atthmet A. Financial Ter an Contion, is ine into this Agrment. 14. Attachmt B, Contacts, is incorpte into th Agr. Either Pary may revise tkr conta informaton by wnttn notice to th oth Party. Enviroental Study Agrement Generation Interconnection Request No. 00248 Page6of7 XRG Response to RMP 37 - page 9 Agrmet No. 09. i 392 Di Wl WlBI, the Pares have cau this Agrme to be exute by tlti1~. ofal. ~¡;~ NamtJ: ~ Ac &ective Da: inAlø DUGY DEVEWPM GROUP OF IDAHO, LLC By: Na: Da: &vi01m-i 8i A~t Ge aloo ~neoo :Reque No. 0048 Pa 7 of? XRG Response to RMP 37 - page 10 Agrement No. 09TX- 13927 Attmet A FINANCIAL TERM AND CONDITIONSSTATlMENT The cost of performing the study by the Transmission Prvide atlnteronæcon Custotner's expense shall be the actual cost of doing the work spe~ inthis~e~~%liusan ovemea rate of 48% for labor and 23% maerials, renting the _rei co$ clthe Sty office plus th contratual supprt costs of contra negotiation. oWing an acnting futions.. an contrat management. t Interconnection Customer heby agres to advan $20,QO,the estiated $t cot, to Trasmission Provider upon execution of this Agrment. Depoits:mde to Transmission Provìde shall be held in an acunt estab1íshe.f() tliis A~innt. If Transmission Provider nee additional funds to complete the work at any time during perforance of the study, Transmission Provide may request, in wrting, for Interconnon Customer to advance such additional funds to Trasmission Prvider for deposit in the~iit. Interconnection Custom shall advan such adtional funds withn 30 days of Transmisson Provider's wrtten request, and Trasmission Prvider may tempraly stop work until Interconnecon Cust supplie the reue funds. If Intennetien Cusmer do n() advance such aditional funds by the due date or, if at any time beore completon of the study Intercnnection Customer elects to stop work under this Agrment, Trasmisson Prvide wiH ceae all work and restore. as a cost to the study at Interconnection Cusomer's ex.pens. governnt facilties and/or reords (l) to their condition prior to work under ths Agreement, or (2) to some other mutualy agreable condition. Within a reonable time after completion of the study or terminaion of this Agrt Transmission Ptovider shall ma a full accounting to In~reJlon CllstQmer sbwiRg the a.tual costs charged agnst the account. Transmission Prvider shall either remit any unexpended balance in the acunt to Interonnection Custom or bil for any cost in exce cl the deposits in the account. Intercnnection Customer shall pay any exce costs within 30 days of th biling. Paymts not reived within 30 days of the.invoice date win aeUé interet on tM~OUnt d\ frm the invoice da to the date pad, at th apprprate ra calculated in acanc with th mehodlogyspefiec for intere on refunds in the Feeral Energy Regulalor Cosson's regulations at 18 C.P.R. § 35.19a(a)(2)(ii). Environmental Stuy Agrment Generation Interconnection leques No. 0024 Pag 1 of 1 -~-_.- ---- - - --- XRG Response to RMP 37 - page i i Agrment No. 09X-1392 Attat BCONAC' 1I11GXHYllMGBOOP 2f'mAHo. LLC r Admin&trati~ COtact: Ph: E-mal: Tee_cai Conta: Phon: Biling Add: Jam Cakulis Ma.r, XlO..DP-lO (208) 938..790peririanooleay.c.m Clar Le Options Maager (208) 3369793 &~ Devclopnt Grup of Idaho, LLC 40 West 14th Stet Hena, MT 5961 JllW.mw.AaMITBDQN Adnistrave Contact: Ph: &mal: Technical Cotac: Phon: E-mal: &ivh'Onmta Contact: Ph: E-mal: Malin¡ Add: Erc Taylor Trasmisson Acount Executive (36)619-614 WyJor(l¡OV James Hal CUtome Serice Enginee (36) 619-651 ill~bpgov Jenifcr Stolz &iviromenta Speialist (S03) 2303233 ipsii~bRa.Qov U.S. Det of Enrgy llonneville Powe AdmiiûstrtIon A 1T: Kelly Johnso - TPP4 P.O. Box 6140 Vanuver, WA 9866-140 Enviro Study Agrment Oeon Intercnecon :Req No. 0024 Pa 1 of 1 XRG Response to RMP 37 - page 12 -.-.....-"'"........._...~ ....--..... .~..,...,._~,.".....,.._~_..,.._---..._'..,.--.,-'",._--_..~,~...,.,~-- -_.-,----.,-,~,....,._,..".:,....--......,,..-..- XRG Response to RMP 37 - page 13 ~tofEnerg Sone Powr Adnistrtio P.O. Box 6140 Vanve. WA .98140 TRNSMJS SEVICES Janua 22, 20 t In rely refer to: TßFJP-2 Mr. James CatkuUs, Man ~. J)v~lopnt Ortip of Ida, I. 80 W. Bannook, Suite 120 Ilse II. 83102 De Mr.eaulis: Exery Developnt Gr. of Ida.. LL (Exery) submitt a Small aeflentror In~tion reuet totl Boneville Power Administration (BPA), datec November J, 20. BPA reive this ~ue on Novembe 1, 2006, and ente it in the Geerator In~aeon Queu a$. R.eque No. G07 (Reque). Th Reqest seks intercnnetion of 20MW øf wind ~ran. in CasSla Couty, Ida. Th projet is identified as the XRG-DP-9Pr. (Prje). As a Fel agey, BPA mu coider potential enviromental impats from its action related to th PMjt pursuant to the N'atoral Environmental Policy Act (NEPA). BPA must also Conide th inr reltingfrm the renably forble private acons that would be åSiat with tb i~neon of th pro Projet into BPA's trnsmion sysem. ~ BPA ~ylia~ øbli¡2!ons to comply with otr Fe envtrol laws for its ac relat to in~() the prse Prject. For th rens. a study tnst be ~ to as th en~tal impats ()the Prject. BolO for your signatur ar tw orgi of Bnvironmtal Stuy Agrt No. 09- 1392 (.At) bewee Exer an BPA. Among ot things, the Agrnt prvide for fundng of the BnYiroint.al Study and speifies milestones in which Exergy must prvide cen infotaO t.o BFA. If YQ cocur, pi.sígn b.oth originas, reain one orginal for your rerds. and retur the other .original to on of th following ad: Bei sid A.lU to:U.S. Det ofBn Bonneville Power AdministonA Tl: Kelly Joh - TPP-4 P.O. Bo 6140 Vancouve. WA 98 Qr, if by ovemigJ mail: U.s. Det of Engy Bonneville Poer Administtin ATt: Kelly Johns - TPP-4 750 NE 41 st Str. Suite 130 Vanuver, WA 9862 Phone: (360) 619-75 XRG Response to RMP 37 - page 14 XRG Response to RMP 37 - page 15 2 Th ~ ad~ paymt of$2.OO ca be ma either eltroicaly or by c~k (î~.i~ Ph ~ AlI No. 09-J39 wh mnttgpayrt. T'.. A~._ paymt mus be reve by Clo of BUSne (COB) 00~.20,20.l Ai. inBimum fajI. hy :Jer to euie ~ re the Agrmet an corng pI~ by COB 00 ~ io.2C, will incae that Exer is no prng with du dililO wi iis~~on R.ue an win pe BPA to delay fu prng of~$ ~øn Reue. If yo ba_ anyqUCion fel fr to coac me at (36) 6 i 9-6 i 4 or Jenife Stlz, Bnvil'...Spat . (50) 233233. Sioay,~i/ Er K. TaylTI1 Ao ExectiveTrajon Sa 3 Bira XRG Response to RMP 37 - page 16 _..-_..,..v....";,,.""_.,~_._.... XRG Response to RMP 37 - page 17 Agrnt No. 09-1392 ENONMEAL STUY AGREME THI AGUEMiN is ma and enter into this _ day of . 20.by an bot~~eiy Development Grp of Idaho, a limited liability compy orgize an ~stng Ulr th laws oftb State of Idao ("Inteonnection Cusomer"), and the U.S. ~. .of Enrgy, acng by and thI'gh the Bonneville Power Administrtion (~t$mjSSonPrvide'j. Intennetion Customer and Trnnsmisson Prvider eah may be .~er to~. a "Pay," or collevely as th "Pares." r RECITALS WHEREAS Inteitonnion Cusomer has submitte an interconnection reuest to TI'mi$$Wn Prvide to i:mercOfne up toW MW of wind geeration from the Intercnecion CU$l$ pro XRG-DP-9 Prjet (Pjet) with the Fera Columbia River Tramisson System (PCRTS); ~ TraiS$on Provi ented the Reque into the Geation Intetion R~ Queu li Reue No. 007; w~ in mang adtision conrnng the pr intenetion, Tl8niiss.onPnYide, as a~ agy. mus includ a consideon of pontial envinmta iri frm its actis reated to interconnection of the Prject, put to the Nåti,(al Enviromctal Pôlicy Act (NEA); W1. Tranmiion Prvir must consider th impacts reulting from thereaby fo~leprvat action that would be asiated with the inteonneon; WHI Traìon Prvider may also have obligations to coly with ot Fe en\l~ law~. $lØ as th Bndageed Speies Act (EA) and th National H'l$torc Praton Act (NA), fot its aeors relat to the intennection of the Prjet; 'W In~tionCuom shal provi Trasmission Prvide notificatior no lat than fiftee (15) dkyspnor to public mengs held by Casia County or any other aplieable reatry authorty as pa of tha body's site peitting press in order for theTraisson Prvide to $etd these mengs and, as approate. explain th role of potially inteting th Prjet an acpt comments relevant to Trsmission Prvide's NBA analysis. TERM NOW, TIH, in consideraion of and subject to the mutual covenants contaned hein, the Paie ag as fQnows: 1. TrQRS1iÎSs;oo Provider's Sclle ofW()k: At the Internnection Customer's expe, Tråsmsson Prvide wiJ cot near activîties for complian with NEP A an Ot environmtal laws relat to th pr Pr. Enviroal Study Agiment t3neroß Intenection Requet No. 00247 Page lof7 XRG Response to RMP 37 - page 18 --"..""'."...._........,"-'"~",.,"'--"~.,.-.,...,,~-,._- XRG Response to RMP 37 - page 19 Agment No. 09X-13926 (a) Transnii8S Prvide Will pre a Rec of Desion (ROD) tier to Tran$USSbf Prvide's Busine Plan Environmeta Iipa Stiiteme (BPB fC) NBA doumntaion of Trasmisson Prvider's prpose acoos ~lat to the interconnon of th prpo Prjet. TraJlmission Pr. re th right to come a Prjet-spific Envirometal Itnt Stant (BIS) in acnce with Setion 1 (ò) below. Trasiion Prviderwilloonduct a tier ROD pt by performng the folloing: t ì. Coodutingsite visits and attending metings. as ne. to un~an th sc of the Prect and to determine an evaluate Trasmission Prvider's prpose actions for the Prjet, as well as th charter of the affected environment; ii. Atteing public mengs held by CasSiii County as part of that bOy'ssitepenitting pr for the Prjet in ord to explain TtaSson Prvidets role in potentially inteonecting ~Prject an to ac cOltt relevant to Traission Providets NEPA analysis; iii. Co.ng varou ot public involvemt acvities, including crn of a mal Jist, .rnlíngs, prpation of meng materials, an crøn of a wes) for th Prject; and iv. Deiding Whher to apove the prpointenneti, an prpang an execting a ROD tier to the BPEIS that doumtsths desion. (b) If alany time Trasmiss Prvide deernes, at its so discretion, thatth ~ ROD~. is no the apprate NEA documeaton for th ~ Prjet, su as due to significat public, agecy , or trbal co th ar relting in unrel ve contrVery, iTMmion Prvide æsesth right, at its sole discreon, to commence a Prject-speific BlS undr NEA. If Tramission Prvider maes such a deinaon, it wiU sed a new budget re to Interonneion Customr for any addtional wor that may be reuire. (c) Transmssion Prvide wil comply with oth Feal envirotal laws. suc as !SA an NHA. as aplicable by peorming th following: i. Idetifyngali applicabl Feral enviromental con$Ultation, review, anpennt reuirements for its actions) related to th pr inteonnecon, includng but not limite to ESA Section 7 and NHA Section 106 coultation and copliance; En'VirStudy Agrmet Getion IntenneetionReii No. 0047 Page 2 of7 'j XRG Response to RMP 37 - page 20 XRG Response to RMP 37 - page 21 Agmet No. 09-13926 ii. Coting abt the reuiremets with relevant Fe. tribal, stae, and Ieal agencies an jursdictions. as aplicable; and iii. Prng nec aplication and approval douments, as apprate.t (d) Tramisson Prvider wil us approriåte environmntal data coleted for tbprpø Project by the Interonneon Cusomer and anyconsltant(s) that Interconnection Cutomer may retain. Tramission Prvider rerv the ri~t tog$er indpendt data on the pred Transmission Prvider facilities site. as .ne Any such data colletion activities wil be at the CO of the In~otnetion Cusomer, and wil be in adtion to the Co deribe in Setio 2 below. (e) As th Pay with ultimate repoibilty for the scope and content of the doumentation Un NEPA and other Fel enVironmeta laws, Tramisson Prvide shaH rein final authority over the scop and cots of th.ti ROD and oter necar Fede envirortinenta doumetaon.. (£) Th P$es shall wo toger cooively on enviroiinental daa colleèon an dét pr&rtion. Interonnetion Customer shall provideT_misson Prvide with aU ne dåta on site chaterstics an prjet facilties in å timey fashion. (g) Traimîssion Prvide will us goo faith effor to comple its ti ROD for the ~t in an esimat 3-6 month; frm when ~ Transmission PtVi dene th it ha reive sufciently complet inforon spifi il18eOns 6(a) an (b) of this Agrmet. Notthstding this emmatimetr, Transmission Prvide is not obligated to issue its tier ROD for the Prje until after th Intercontion Cutotnr has cop.Ieall of its other Feral. ste. an locl environmetal prse for tñ Prje incuding relution of any adinistrtive or judcial ap costt with its busine prce. In addition. Trasmission PrVi ~ th righ to revise th esmated da of coniletion of th enviromel..st pro as need. 2. Pf.ien: (a) TrasmiønPrvider wil spfy the estiincost of the envirinenal stdy pr an oter envirota wok by Transissiøn Prvi couele un Attmet A. Finanal Ter and Conditions Staemt. (b) Intßtnneon CustÒt shaH submit a depoit of $20.00 to th Trassion Prvide in accorde with Attacbmnt A. EnVilltal Stuy Agrnt Oeio Inttion ReqYet No. 0047 Page 30f7 XRG Response to RMP 37 - page 22 ---','.-'''.--.,---~,._.".,.__..,''--'''-........_-_.....----"-~ ~.~ .,--.,.. .. ._..ú;........-'.~.,..,'..,........"'~.__.....,..._..,~___ XRG Response to RMP 37 - page 23 Agreent No. 09~ 13926 (c) I~ne Customr undend and ag th the depoit prvide pursuant to Seon 2(a) an 2(b)reprets the estima cost of ali envil'ral wo to be. perform by Trasmison Prvider und Seti( l. InteCOneöt Custmer furerlltands and agre that the ae~.eo.of thiswør may diff frm the Transmisson Prde's esti~ OOt. m.ønnection ClJoorshaii pay t( Trasmission Prvi the acual cos incWT by Transmisson Provider in peforming tbe environnintal wøt undr this A~ment. plus åppUcable ove~ raes as indi~ted in Attachment A. t 3. PrelimÍlI(Jf' Euw.mental Revew: Inte~9n Custo shl subit informon ne for prliminar enviroal review to Ttansission Provider wtthinthirty (30) caenda days of th dleofexeçtion of this Agrmet. This infon ineludetb following: i. Prjet faciltie ma, including the Oepbical Infortion Syste (eUS) layers of wind Prjet boaries, if availab. ii. De~ Prje deripton, inclRdng ata minimum the legal dept of the Prject ara, the ap~iin. numbe. siZé and l~() of tures, and a descptonof the prø trissionIlne .at ro. option an mante, oominicatis,an odpr Prje facilties; iii. N~ an.~ of an proy owne withinth Prt .. an withn á on mile nid.usof th Prjet faclities pUblc~¡. known by Innetion.Cume to have JursdetQÐ ove th Pr an any othe individual or entity known to have an intein t~ prpo Prje; an iv. Coof aU infortion relate to any permttng alrey conucted for th Prjet. 4. St-y Pia: (a) ~ CU$()meshall prvide a Stuy Plan to TnmsmssPrvi fo all fid wotk neessary to prly com envirtminta reviw for the pr Prjet within sixty (60) caleda days of executiOß of this Agt. (b) 1nteneti Custom will include a bref deripton of Intercecon ~. s pr fild studies and other da colletion activities,including. pr sched, in th Stuy Plan. Internecon Cusmer Envirometal Stuy Agrt Ge Intertion Requet No. 0041 Pag4of7 XRG Response to RMP 37 - page 24 -~''''-""..~.,~.--,.._,,. --.~__'~_"0""''''__~~,~~, -'--~""'_'-"'~"'"-"-"-'-'-'-"""~''- .,..,_...--"'.,.-.,-,._..,..",.....,..:,.,-,,----.,...~..-, XRG Response to RMP 37 . page 25 Agt No. 09-13926 wil aIdiscla in th Stu Plan any ongoìl1g studie and include å $lmma of the rets. of any studies alrey completed. (c) Irite~nection Custome wil also disclos in the Study Plan any known pet reuirets of othe state, Fera, or local entities.r (d) Trassion PrVide wÎl reView and either wove the Study :Plan or live noce to ~tlec¡on Cusomer of revision ne to th plan within $.\'. (7) ~ days of rept of tbe StU Plan. If revisÍón$ ar re~. Ir~n~tiOÐ Q.tomshaU revise an i-bmt the Study Plan to Tr.siion Prider within fouree (14) calend daysaft notice fro the Ttasmissiol1 Prvider. (e) Transmisson PrvWe may reuet status res frm th Interonneon Custøtltdel the Innnedon Custoinr's pr in compting the Stud pi.. If teted Intercnection CustOl shall prvide T~mi$$ Prvide with th status re within seve (7) cakda dayš. 5. Field WqrkQ1d l)(JQ Collection: (a) Within twlve(l2) moths of execution of this Agrmet, all field work al dacôlia no in the Study PLal wHl be cople by lnteneon Cuomer. (b) If Trmi$$ion Prvide denníne, at its role disc~ion, tnat th field wotanord.acoJleion do not l' the reuiretS of NEPA or its ()bliøi_ nn Otr Feral cmviroentallaws, Tra$mis$ionPtvide has th riglt.to,at thexpe of Internection Custo. hire a third pa *~ to.co1etany n~ fur $t. Th~Qt CUtemeundedsalagcc. that the.CO ofadtíon ~will be ~bove an be any e$ittè& provide or pror ~ts subn du to this Agrent. 6. Etvirtl Reprt: (a) Witbin fift (IS) months of ex.ecution of this Agt, Intercoiiecon Cuom sIl1 prvide res, meora or oter ag upo .~ to Tramisson Prvide that prvide the methlog and relts of all fiel wor and data colleion eø. (b) Il1etDetion Cuom shall also provide, as son as it beomes avala~. any envirota domentaon for the prpo Prjet ~ bt.Cå COnty as par of thatgoemnitaJ bôy's si ~ltg.pt fo th Prjet, so that this infoon ca be iIl~ mto the tilO:D to be prpa by Trmsnsson Prvide. EiviroJltal StUy Agt ~ 1nernecon Re No..G047 Page 50f7 XRG Response to RMP 37 - page 26 ._..........~_...~...."',..,,"_"......._~c-.,~..........~...,'-~"",.;--......,.....-'~"."".....,...,._._"._'__.,.._..,...._o~__._.,......... XRG Response to RMP 37 - page 27 Agnit Nó. 09TK¿ i ~92 7. Due Dilgee:,.-:..,..-l; ............; (a) intwç.~ti. Cøøi shan pr with du diligenc with its ~ibilíti idtifi in this Agre0lt. If Transsion Prvider deili that Irmiecon Cusom is no prng with due dìli~. Trasmiion Prvide wil pride writte notìee to Int~øn Ctorn. InteOnneiOl Cusomr wm then haVé fomt (l4)cåladar days to prvide a written repo, either contìng th "'I(i~y Qt prviding a re acle to Tran$lsson Prvider as to why ~otecon Custor has not pree with due dilgenc or ~Yethtit ha pr with du dìl1gence. t (b) Inter~tì Cuoir shall exercise du dilgeeto timey coplee and ptvideto Trasmission Prvider coes of all infotrtion reJat to peltti~ co\&ed for th Prje. Such infollaii(f snall include. I:tis ll limite to. Ene Faclity Siting Council site ceifiion. an reated pem; orre~ pets; and stat. locl or countysitin:g permits. 8. Gøllg .L: Ths Agt shl be interpeons and eafOl inacwith Fe law. 9. "awr: Th filu~ da Pay to this Agrniílt to inJst, on any oc, upon it pe~ of any prvi$i of thisAgni will nø be oode a wa_of aly obigaoi~ right, or duy of, or impo Upoi such Pary. Any waiveåt~y time by eithe Pay of its rights with re to tbis Agrt $hl nø be deiCQtÎnUing waver or a waiver with repet to any ot tàlur to compy with any ol duty, right, or obligaton of this Agremet. Any reue waive or", ~t shall be provide in writing. 10. An/'~RdI.. Tl ~ may am this Agrt bya wrtt insint duly execute by th Pae$. 1 1. Sig~.. Th li¡natries ~t tbtthy ar authorize to enter into this ~. onbe.ir øfth Pary for whom they sign. 12. Th$~t is ~ffecve on the dae of exeetion by the Pares. 13. A~tA. F'ma Ter an Condition. is inerainto thisA~t. 14. AWlbit B. Coiita~ is incorte into thi Agrnt. Either Par may revise thir cota inforon by wrtten notic to the othr Pay. Enviromeal Sty Agmet Geion Inteneon Reqt No. G07 Pag6of7 XRG Response to RMP 37 - page 28 XRG Response to RMP 37 - page 29 Agent No. 09-13926' IN .WI WlF, IM.hr have cause this Agt to be exec bytlr ~ûve ofals. ~PO"~TlONBy: L~ ¡l.'--a.YkiNaitl: T~on Aøt BMve .. ì u. 14i./It ØBY ~ GROUOFIDABO, LLC By: N..illè: Da: E1vi St ~t Gotion ~ Re No. 007 Pa 7 of7 XRG Response to RMP 37 - page 30 -,-','..-..,-,-- _.-.,.-._,,-_..._~.. ..-...._~....,.,---.-~,....--~-,..,-" XRG Response to RMP 37 - påge 31 Agrment No.09-13926 Attt A FINANCIL TERM AND CONITIONS STATE 'T 00 of peonthe stu by-the Tramission Provi at InteonneetionCustome's ~pe$ln bet~actu coøidQing the work speified in this Ag, plUS an overad rae of4l~ro la and 23lf maals, reprenting th indiret cOS of the sty offie plus the çOtrua su ~ of cotrt neotiation, biling and accOWting funtions, andcotr maagt t In~nrioo Cusome heby.ag to advance $20,00, the estimate study co, to T~ilSi_ Provide llpone.xecuton of this Agrmet Oepoits mad to Transmission Prvider $ban be held in an ~unt eslishe for this Agrment. If ~ioPr~~actiooi fund to complee the work at any time duñng peorce of th sty. TraniiS$oo Prvide may reue, in writing, for interon~tiQtCusQin to a4v~ SUêb titioml fun to Tmssson Prvide for deit in the accot. int~neion CUškmeshU adva suh aditional funds within 30 days of Trasmission Prvide's writt reue and T~$Sion Prvider may temly stop wok until Interoo Custom suplies th reuested funds. If Internetion Customer do not adv$l sue adtion funds by the due date or, if at anytime beor completion of th$tudy Inoo Cutomelec to stop work undr this Agrnt, Trasmission Prvider will ~.ll wQt an æsio, as aÇ(t to the stdy at Interonnection Cutom's expens govermet facliti aBor re (1) to their condition prior to wor und this Agrement, or (2) to S9otr mutUåly ~~e cQndition. Witna.~t~_ _~OR.of th stuy or ternaon of this Agt Tnaiss Prvi shan.mø a full acounting to Interoneion Cutor showing th aa_ .cois ~ ...Qi~t Trassn Prvider shalleithmnt any unxpe baianceInthe acnt to lnteonnecôn Cuomr or bil for any costs in exces of th delS in th atL lrttercoo Cume shall pay any exce cost within 3( days of the billing. Paym DO~ived witln"30 daYl of the invoce da wil ace intt on the amt du fro tlinVOdât to th dat ~d,at th apat rae calculate in accordance with the in~y$pififo intereønrends in the Fedra Energy Regulatory Coinssíon's relatorat is C.F.R. § 35.19a(a)(2)(i.ii). Enviro Study Agt Oeneior Jion Reque No. G07 Pa 1 of 1 XRG Response to RMP 37 - page 32 ~..'~"""'_""""'_~"""'...'_",....__......_., XRG Response to RMP 37 - page 33 Agrmet No. 09-13926 Attebøit B CONTACT UIIGI RlYlWlM Q. Of IDAlO, LLC ~ Administrave Contt: Ph: E-mal: Tecnical Conta: Ph: Biling Addss: Jam Carkulis~.XRQ-DP-9 (20)938-79penÇnaolv.com Clar Les Opions Manage (20) 336973 &erg Devel()prt Grup of Ida, LL 40 West 1411 Str Helena, MT 5961 _Vl.mWU~TlON Admnistve Contact: Ph: E-mal: TecCota: Ph: E-mal: Envirome Contat: Ph: E-mal: Maling Ad: BrTaylor Traision Accnt Executve (360) 619-614 ektaylortibpgov Jam Hall Custome Seice Engine (36) 619-607jJbflgov JénnìtèStolz &virçnmeta Speialist (50$) 233233ilf...mv U.S. Dent of Energy Boneville Powe Administion A'f: Kelly Johnson. TPP-4 P.O. BQx61409 Vanøouver. WA 9866140 ERviiæl'I Siuy A~t Geti~ lniwnection lequest No. 0047 Pa 1 of 1 XRG Response to RM 37 - page 34 .-......;...~".,~,_............,~._,._... ..-.-.---~"" XRG Response to RMP 37 - page 35 ~en of energy ~ Po AdinatP.O.b8140Var, WA 98-140 TRANSMISION sævi 1_~22,20 l: In rely refer to: TSEI-2 Mr. Jam Calws, Maage Hxagy Delo Gr of Ida, LL 80 W. Banoc, Suite 120 Boise ID 8370 De Mr. Cais: Ex~.De~ Giupof Ida. LL(Eerg) suitte a Sni oeorln~io ra~to tl. BoaiUe Power Adnisttion (BPA), dat Nover 1, 26.BPA reve ttiuequesnm Novebe i, 20, anenter it in th Genertor ln~ ~ a$~. No. 005 (R~uet). Th Requet seksinteonnetion of 20 MWofWind ~ ill Casia County, Idao. the prjet isidetìfiedias theXRG-DP-7 Prt ~t). ÅSa~l "'Y. BPA ~CQi" poenial environi impa fro its aclions relat to .th~je ~ tath Natoo Enviromental Policy Act (NEPA). BPA mus also code .tb i~sreklrtg fr thetey forele prvat acons th wonld be asat with th interon of the pr Prjec into BFA' s trissio sysm. p~ BPAiny have obligaOl to comply with ot Fel environmetal laws for its ~Oß rd to i~~on atth pr Proje For the teas, a stuy mus be unêrt to __ the CIVD'Oin impts of th Projcct. ~ f() .yoliga ar tw orginas of Envirometa Stuy Agrmet No. 09- i~ (A~t) .~. ~ _BPA. Amng otr things. th Agr.nt prvide for fungoftb :&~Sty and spifi milestón in wbich Exy must prvide ce iRfoon to BPA. If yo CODCurl ~ sig, bo øigimils. retain one orginal for your re an retur th ot ongina to.on of the follO'ngads: &n1iÂf_ ¡PU.S. Det ofEDBonelle Poer AdniATl: Kelly Joh - TP-4 P.O. Box 6140 Vanvel WA 986 Or. .ifkY ownúglt nu:U.S. De ofBDyBoUe Power Ad$iston AnN: Kelly John - TP-4 7500.NB 41stStt. Suite 130 Vanouve, WA 982 Pbone: (360) 619-75 XRG Response to RMP 37 - page 36 ..XJG Response to RlP 37 - page 37 2 n..........~ 01..00_ be mad either elecnically or by ehk (i~ f.i-). ~..~ A..nt No. 09-139 ~ $mttng payit 1'~ ~_ ~.mut tireve by Clo of Busine (COB) on~.20. ~ l Atl~.~..~_te~"md ~urn th Agrt an ~& ~t .,00. ...~. m.... will iie tb ~ is.OO ~ng witb due dili"-.,, il$ .~.IJ~~ i~t and will pet BPA to delay fw ptlI8_of""s.~. ReUê If .).i.w. .Y ~ ÍÌ. _ to cotact me at (360) 619-14 or Jenni Stolz,iDw~ ~-. 4( (5O) 233233. ~Y. ~ ,4.~--- Br fC. Taylo TrSlmssion ~ &ecveT.....3~ XRG Response to RMP 37 - page 38 ,.~~ ..--'-'...,'~.~-,-..,'~- .....~. ......_..,._,.......".'..__c.__'",'_ XRG Response to RMP 37 - page 39 Agrt No.09- i 3924 mVIQNMAL STY AGREEM 11 AG"'" is ma an enter i~ this ~ day of .20. by an bewetl Exery Dêvelop Gr of Ida, å limited liaUty company o~ize and ~isrtDg ~.~ i.W$oft~ St. of ¡Gao C"Intønneon Customer"). ~d lhe U.S. ~tor~.dnl.bY an thr the BonneVìlle Power Administration ("T~0l Pridel In~oo Cuome an Trasmission PrVì4er eaniay be refertto 8& a "'Pay," or colleively as tle"Paries. ,. t RECITALS WlBAS ln~necnon Customer has submtted an iiiteronnetion reuet to Ttaiss01~ to intettit ill to 20 MW of wind geerion . from the Interconnetion Cosom's~ XRG-PP-1 Prject (Prject) with the Fedel Coumbia River TråìniSSon8ysem (FRTS); WUøA.S Trasìnissio PrVìder enter th Reue into the Generon ln~i~~ Qøeue.R~uest No. 00245; WllSin ning a ~siøn cøming the p~ i~necon,T~jóiPm_. asa.~ agy,mU$ includ a oosiraionof potntial .¥it01' ì~ fr its Qon ~ tointernetion oftñ Prt, pursuant to the NationåJEnvirome Policy Act (NA); WlS T~ Pride musteoide the impacs relting frm the ~.ly f~lepivate ac th. wold be asiate with thinterneetion; WI Tr Provide may also have obligatons to comply with other Fe envii laws, suc as th Endangere Spe Act (EA) an the National Historc Prat Ac (NA)~ for its acon re to the internecion of th Pr; W"'~iQ CUSme shnll provide TraS$on Prvide notf"icon no i-.r tb~ (151ci .pr to pulic mengs hed byCaia County or any other ~re~~ty.lS pa Of that boy's site pettig pr. inotd for tte 1'__$$onPi¥itito ai itbmengs and, as apprat. .explÆiin the role of ~aily m~nltti Prt an ac comttsælevant to Tmnsmis$ion PrVìder's NiA anysis. TE NöW,.~in cocion of and subje to th mutual coveMts eontah1é ttn,.the Par. ag.. fOllows: 1. Tn:ssi Provider's Scpe tJfWork: At the Intennetion Cuomr's ex~, "'smi$$ionPrvide will condu ne acvities for complian wi NBAanothe enviîOmetal laws related to the pro Prject. Envirometa SQ AgtGe Inteneon R~ No. 005 Pag 10f7 XRG Response to RMP 37 - page 40 XRG Response to RMP 37 ~ page 41 Agremet No. 09X-13924 (a) TtaiS$ Prvide wil pr a Recrd of Desion (ROD) tier to T~S$Prvi's Busne Plan BnvitomeUli Impat Statem (BPm) fol'A. domeion of Traission Prvides prpo actiOl .~ to th intetenetion of the proposed Prjet Trassion Ptvide~ th right to co a Prjet-spefic Bnvirometa Ir~ ~t(EIS) iJ' ae with Section l(b) below. Tniissio'Pvide wiUcondu a ti ROD pr by performng the following: t i. CooduôDgsite visits and attnding metings, as ne, to ~th scop of th Prject ana to deteine andeva.luaie Ttàl\mi Prvids proposed action for the Project, as wei i as th ~rof tbeaff enviroint; íi. Altipttblicnings he by Caa County as part of that bo's sitepetöng proc for the Prjec in or to explain TnminisS~ Prvr's ro in poentially intenneing th Prt and to.ac commets relevant to TI'smssìon Prvid.'$ NEPA analY$s; m. OJing vaoU$ other public involvent activitie including ~of a mail list malings, prpaion of meting maerals. an cronöfà weges) fOT the Pr; an iv. Deidig ~ to apve the prpo internnection, and ~g aii executing a ROD tier to the BPE th doumens tbbdeison. (b) If at my tin T~sson Prvide deternes, at its so discretion, that the G~:lQJ)~ Î$not the approate NEP A dQuinntaon for ti prø Prjet,.su as due to significat public, ageney, or trbal ~that .ít. ~uiting iJ' unrelvtd coltVeY. TrasmSSon PrYi_ ~thright, at its soe discon, to eonc a Projet-secfiEISunNØA. Lf Trion Prvide ni ~b a ~naon. it Will Sè a nê.~ieue to IntenelionCuome for any adtial wòt m.i. mAY be . reuire. (c) Tnøissoo Prvider wil coply wìth other Fera environmetaIlaw. .sh as ESA anNHA, as aplicable by peorming th following: i. Idetifying all ~licable Fedl envimel consultatio. reviw. .an. pet reuire for its aeøn(s) relat to th ~ i~ne. includùbut no Iimite to liA Secton 7 and. NHA seiO 106 coultat an coliance; Envi Stu Agt 0e Jnneon Req No. G05 Page 2 of1 XRG Response to RMP 37 - page 42 ._--"_.,..".-~_..,.-.... ".~.--'" "--'~'.-'--'....,.-.-__.",,._...-..-..-.--.-.. XRG Response to RMP 37 -page 43 Agt No: 09TX. 1 392 ii. CosUng abt th reirets with relevan fe. trbal, stat, an locl apcs an jurisdctons, as aplicle; an iii. Prng ne application an appval doumnts, as apprate.t (d) 'fraiSS.Prvìde wil us approat envirometal da collec for the .pr ~je by the Intercneon Custome an anycøtat(s) that Intenetion Cusome may retain. Trasmission Prvide re ~iigpt to.pt in~det data on the prpo TrasrniS$on ProVide facilties site, as ne Any su da colletion activities wil be at the ept of th Inteøetio Customer, and will be in addition to the costs debe in Seon 2 below. (e) As th Påi1Y with ultimate resibility for the ~. an cotet of the ~inta i. NEAand othe Fel envifOtMnta laws. Transssion Prvide shan retan final autty ove the sc and co~of th tíe R.OD and oth near Fe envirotal dotntation. (0 Th Pa shall wor tog coopeively on environmental data colle aD c:t prion. Inteonnetion Cutome shaU pr\t T1'ss Provide with all nec da on site chtestican pr faclitie in a timely fashion. (g T~i~Prvide wil use go faith effor to complete its ti ROD for tlProjeclÎn.$1 esmate 3- months; from when tl Tral1Ission Pr.~ ~netb it hås reve suffciently comple inforion speti in seon 6(.) and (b) of this Agrt. Noithtang:tl -_ee tiine, Transmission Prvide is no obligate to iSS its ~~Gl)forthe Prjeet. un after the Jntenetion Cusme hac~ allof its øt Fe, ste, and Jo envirometa pro tothePìje,inolUng retion of any adnisttive or judical a~ costt with its buine prce. In adition, Transmisson Pli_ ~es th right to re\lst th esmated da of completon of theri\l~ta.sty pres as ne. 2. P~t: (a) t~01Prvi wil sp th este cos of .thenviromental st~. Qt environmtta wor by Trasisskn Prvider condted ..un Attme A. :Fnaial Temsan Codition Statmet (b) Ineron Custome shall submit a deposit of $20.00 to th TrasiÌ$iò PrVi in accorde with Atthmet A. Bnvial.StyA~ Geon lniereon:iiectioo. R.eque No. 0045 Pag 3 of7 XRG Response to RMP 37 - page 44 .. .......V.~......A.,.._.___ ._,__"",,,,~--_,., _..-......~'7_W XRG Response tö RM 31 - page 45 Agrnt No. Q9X:. 13924 (ç) I~ CuQt unnd and agr that the depot prvide ~ t( Søon 2(.:) an 2(1) ~ th esimaed cot of all envi_~ wOî to be peor by Tramission Prvider unde Sen l. l'lneon Cutom further undetand and ags that the actulc08 òf thiswot may diff fr the Trasmssion Prvide's esmaed cot Ition CUSom shall pay to Tr.smission Prvj th acual cots inc by Tramission .Pvide in pedongtlenvirotn wOlundr this Agt, plus aplic overh rate as indca in Attment A. t 3. p.reiu.." ttlw1Yl1ental Review: ln~ ..Cu sñallsubmit informat ne fQt tmlimina envirønnt review to Traisson Provider Within thirty (30) canda days of th cØ.ofexecion of this Agmet. This information includ the following; i. ~ fa.ities map, includng the Geica Infoitntion Sys (GIS) layers of wind Projet bondes, if avlable. ü. DelePrje deptiOl,iooh.idng ata mìnimutn the leal ~pton of tlPr~t ar. the apxima numb, size and ..~ of tu~ an a deripton of the prse trsmisson lì~ ~ ~~ option an manteanc communons~ anot ~ Prje facilti; ii. Name ånd ad of aiiprpey ownrs within th Prject ar an wittiin a on mile raus of the Prje fali~ public agencieskn. by In~ot1 Cur to have jursdon ove th ~ and anyot indvidu or entity knwn to have an intet in_ pr Pr; and iv. Copt$ ofal inforon reat to any pemittng .aJrey codute for th Prject. 4. St Plt: (a) i~tíoiCtomesha11 prvide a Study Plan to TrasmiS$ionPrvi før ~tfild woi.øe to prlycøenviroia revi foth~ Prjewitb sìxty (60) ea days of eiecutiGtof th$ Ag (0) It~neiÐJ Cusom win includ a bref deript of Intennetion Ci.'s ~ field studies and oter data oolJeon activities, inclU(ng.a ~ schele, in the Study Plan. Intercnetion Custoier Envi Stu Aønt Ge Inn Reque No. G04S Pag4of7 XRG Response to RMP 37 - page 46 ~-"-~-""-~"~""~"._"'"""'~"'-''';'-----,;-'.''- ~..~.._--.,'" "'-;'-~',.,-- '_._'__"",~,-_'.-,,,c..,,"_.~.,__,.,_ -'x1tò R~... pons.e to RMP 37 - page 47,",',r ;',' ._'."'" ' , Agnt Nô. 09-"13924 wiIalso di$Clos in th Study Pla any ongoing sts an include a suma of th rets of any ltes alredy comed. (c) In.~OI Cuom will als disclointhe Study Plan any knwn l*nit it~ of oter stae, Fel. or locl entiti.t (d) Ttà~ Prvide wUl reviw and eithe ape the Study Plan or give noCe lO. ll~tiOt Cusme of remion ne to th plm withn seve (7)~ days of reipt of tl Study Plan. If reyision ar renxl~nnetion Custme shall revis aM reubmit the Swdy PI..tè 'I~on Ptviôe within fou(14) ca days aft notice fr tlMTraimiS8oo Prvi. (c) T:ltsson ~yi may reue st report frm the In.tercecioii Cus th del the Internetion ClJtome's prgr in coleting th Stuy~. If reueted Intercnnecion Ciiome shall prvi TJ'mi$sWn Prvide with the Status rert within seven (7 calndar days. 5. Fiøl We1'andDtt(l Celet01t: (a) Withn. twlve (lZ)moth of execti of this Agrment.áll field wor an.da (:leton noed in th Stud Plan wil be comple by Inlêl'Cneon Cuome. (0) lfT~S$øn Prvide denes. at its sole direon. th th field woi~r~ æuøn 40 not met ~. relrre ofNEA or its o~..~ øt ~ enviroin laws, Trassion PrVide h._riR). ll th expese of Internetion ClJton, bire a third pø coac .løcolee any ney furt studes. Thtn~ Cusme unds at ag. th thc C(of aditional $tes wil beabve aDd be.yond any esmates prvide or pror deitsSUi(t. du to ths Agt. 6. Eiivircm Rerts: (ai Wit fift (1S) moth of executon of this Agt IntenetionC~"'1 prvi re. memo or ot ag up ~ta to Tramion Prvide th prvide the inlogy an l'l$ orall fiek wo an. daco1lection couct. (b) J.~oi Cus slaU aI.prvide~ as$Qn as it beom à¥ilab anyetvirometá dotation fo th pr Prjet ~~Y~Cotyas pa oftht go~rntn bo:y's site .~ pr. fotb Prt, so th this inforaton ca be in~ into th tr. ROD to be prar by TtasmS$ Prvid. Envi Sty Agrnt Geon Intion Reqt No. G05 PaS of7 XRG Response to RMP 37 - page 48 XRG Response to RMP 37 - page 49 . , . --, _..~....,_'.".. "';O"~ ,.... ,~.._...____...... -~rNë09-13924~. ---., 1. /Je Diigeice: (ll i~øn Cuom shallpree with dlJ dilìge with its ~liijes idel1ifi intlís Agmet. If Trasmison Provider deii th ~ Cuome is no prßg with due dili~. TGUinÎloii Provide wil prvide written nOQé toIn_OOÛO~. In~netion CU$er wiU the have f~ (l.)cadJ åJysto prvide a writtn re.eithcoting tl~Y' Of piding a ~ acpt to Ttai$Sion Ptvid:ras to wb~ I~ooCutom has not proc witR duedilige () believe thátit hàs pr with c: dilgence. J: (b) ~ne Cu shall exerise due Qi1igenc to timelycopte an prde to Trssion Prvide coie of aU inføon rela to peittngcM for the Pr~. Suchinfotion Shan includ but is tl lim~tQ. :E Faility Siting Councíl site cefition. an ~lated pet:i or relatpeitS; and state. loc or COnty siting peits. 8. GowrngLa: 'I$ Agmet shalt be interted, costr and enfored in ~ With:P lâw. 9. W.vet': Th r.iu of a Pay to this Agrmet to insist. on anyocor. up 3t~of any prvision cf this ~ wiUnot be cosìde a waive of .y"iption. ri. or duy of, or impc upon. such Paty. Any waiveat..y tb- by ~ Par of its righs with re to this Agrnt $halnöbeJ~a couing waive or a w$ve witR rettoanyot f$.lur kl~Y wi..y ot duy. right. Ofohli¡aof this Agrt. Any~ UYeOftll ~t shl beprvidein writing. 10. ~êt Th P~ may amend this Agrmet bya wrtt insduly~eçtf by_PIl. 11. ~: ~$i~ret that thy a~ autbo to enter into ths A~ .ÕJl bêhafofth Par for whom thy sign. 12. Th ~ isolfeve.()th da of execM by th Paes. 13. A~A Anafiå.Tem ard Cotion. is incor into this~. 14. A~.8. ~, is incte into this Agrt. Either Pary may nmaetOOcoø inon by wrtten not to theøtli Pa. Envirome St Apt Ge Iiteæ Re No. 0045 Pl 6 of7 XRG Response to RM 37 - page 50 XRGRepose toRMP 37 -page 51 ~.N6:-09;.t39'...--""--,._"......_--,._,---"'''..~~"..,~.,._.''__''.~-'.r._'';;:_,,'".~~,_~.".."'_,.""_.~~._.,._'" .. Wll. ...ll.....l th.Pa.l' ca thi ~ to be exec by~.. ..' ....-,-ø..i~.tI~ ~..~TJONSy. ~.~ ~tt: Im.'.~i.t!.~.~~ Da: 11&./. t .,. . :2 DDY BW 8l OP IDAHO, LL By.NI I.: Btv~ 8D AØlløn~ _a£~ Ri, net No. 0(5 Pa 7 of7 XRG Response to RMP 37 - page 52 -'"'~'~"'''-''---~'''-.'"---~-,,.,.~, XRG Response to RMP 37 - page 53 Aji1fNOC09l392'-"-- Attclmet A FIAN TERM AND CONITION STATE 11 ~ofpe()lDli th stud by th Trasson Prvideåt Inteneion Cur's e~pe shbedi acual OOøf.dong the wor spified in tlis Agrnt, plus an ove ,..: ~fø lar lØ~inal. renting th indi~t cots of the study offoeplus ml~~...éö.()f cotr neaton. hiUing and acnting funetions, an~~t. t I~tion ~~y ågto _van $2,00. the esima s~y QOt. to Tl'smSSPrvide.up cxtcon of this Agrt. Deits made to Tranmission Prle.lhl be held it an ~t esablish for this Agrt. ir~ Prvide "'adti fund to cople the wo at any time during.~.. urthe ~..T~i3$ionPrvide may reuet, in writing for Internection ~ to._~ Slb adt~ f\ to Tnmssion Prvir for deitin.th acnt l~~sbn.ad sucbiltiona funds with 30 das of Tramission F'vf&'swritt ~.an TrassìooPrvide may tempoly st wok until i~~()C~mc $UpPie.there~ fu. If Inteonnetion CusOler doe not ~.$U adÛOalfibyth dU da or, if at any time beore copletion of the study I~øn a.meelets to st work unde this Agrmet, Trnsmission Prvider wiU CC.all W' an reor, as a CQtoth study at Internecon Customer's e~se. go~faJites an4~ (1) to thr cotion pror to wo unde this Agrnt or(4) to.so..ØI mutly ~ coition.. Witl a FeaW time . eøon of th study or termnaion of this Ape T~$$~vi... ..a.fuJl actig to Intennion Custome showing thae ØO ~"A$ th aê. Transsson Prvide shalleithe remit any~~~iii th~to In~on Cutome or bil for any cotS in exce of th ~ iii th~. ~nCu shl pay anyexce cots Withn 36 days of tb.billiag. Pa~ ao æeve wilniii 36 days of th invoice da will.ac intet on the amunt du fm.ab i~m. to ab ~ pad, at th apprat rate calculat in acan with the ~ógy .~~ for in.. on re in th Feer Energy Reglator Commission's ~iu.øns at 18 C.P.R. § 35. 19a(a)()(ii). En Stuy Alt Geon Jn Reue No. 0045 Pag I of! XRG Response to RMP 37 - page 54 ".""-~~."'-'-"-""""-"~..--...-~~...--.,.,--.,~_..,---~ XRG Response to RMP 37 - page 55i\tnt Nt09 Atthme B CONTACT ¡¡AGI DlYI iB OF lDAHo, LLC t Admini Cota: Ph: E-mal: Tecnica Cota: Phne: BiliDg Add: Jam C8lis Ma...XRG-DP-1 (24) 938-790~richariea.cQm Clar Le Opons Maage(2) 33691 Exer Developt Group of Ida. LL 40 Wes 14Øl Str Hd MT 5961 _mu l'WIAJllON Admnistive Conta: Pb~ E-mal: Tec Con: Ph: B-mal: Enviro Con: Ph E-mal: Mali Add: &iTaylor Traio Accnt Executve (36) 619-614-Qiylf:gov JanHalCUS 8e Enginee (36)6i~S7 Neòpa.gov Jenfe Stolz Envirota Spealist (50) 233233i¡i(fv U.S. Det of Energy Boville Pow AdmnistonATI: Kelly.Jso - TP-4 P.O. Box 6140 Vaave. WA 986-140 Envita Stuy Agt Geon Intnetio Requet No. 00245 Pag 1 of 1 XRG Response to RMP 37 - page 56 ""- ..--._,._"~..,'_.".~- ..~., ._".---~ XRG Response to RMP 37 - page 57 ..'rPower Adm ...ftlsz1l\VACHmcaøbiw Pay_ U.thfo~i~ to mae pa~ts to th Bonevile Power Administrion (BPA) by Wi ",mr, AQl ~t. or ..J) paymts. Alth BPA pr that fu be se via.~pa~i~_y aIti setviapape payms. Und ceaicircums ~ in .~. to~pa~opOl cibe beløw, it niyalsbe poble to make paymtvi.pr.~~t.crt.cmor. if a fedlagey, the Intr-governtal Paym an ColIeOl(iA.C) s~in P~ contac Pilar Rowe at (503) 23Q3523 if you have queti åb. anyøt thpaymtopors. t 1. EL'lONC PAYM a. WIll TMNSA ~ ~îSat~ie trer of fun via the Unite State Treury's (Treury) Pere ~t$~.It is a eoéf-tQ-mputer link be Trery and the Feral ~..Qkof Ne \'oí. Th foltoWigimtetions detal th impont fields that yo nee to prvi. to your bank in ~ to ma a wire trasfer paymt to BPA. WlKETlNSl7 IHSlJCTONSUMMay Pl~t$ tøBPA b~ Witetrei _ ma to th Fe RC$ Bank in Ne Yor City ~yçii.a fS~ Ple be awre of time Zon d.ff When wiring fund toèt tim.ly paym. Chk With yo bak for wire tter deline. BFA ca verfy wire pl)'t ~Pl laOJlbe day itii ~ or the following day. Verification is1"11 for firs üniwirepaymts. Th follo iD del th impot field il you ne to provide to your bak in or to ii a wire tn paymt to th Bonnelle Powe Admniston (BPA). 1) AB Nu - Th ABA numbe for th Fe Res Bak in New Yor City is02103. ~) RevqØak - ."'NYC"degn th Fel Res Ba in New Yor City asth ~¥ibl. 3) Pt Cod - Th PitCod is "'S NYC I er". 4) Ac - ~y Loon Co of 8901401 direts the paymt to th BfA fund in th U.S. Tie. $) 'l~y Infor - ~ "0&1=" prvid the BPA invoice numb you ar payjng ai -COtt.mibêt öt.ot iâtiying inforon in or for BPA to idefy the pa~t whe itisreve. XRG Response to RMP 37 - page 58 ~""'_"~"'_'_C-. __.'_'-"~'"__"'_'__"'._..,...--.~.~-----_.~;""- '~"'" ._--_..-.-_._..._.."...~._-_.,~ XRG Response to RMP 37 - page 59 2 Th physoa ad aA lele num of the Feal Resrv Bank in New Yor City is: Fc ReB Ba of New Yor 33 Liy Stre Ne Yor NY 1005 Tel: (212) 1250 (swtc) t b. ACHc.1T ~Clni.ao_ (ACH n:lltt expr or REX)ereit is a funds trfersysm pive. b~$eAæ.~ ofth~ai Autoed Cleng ßo ASSatì (NACHA). ~ Pl'o'ri~.fQl..'" i~ *,ng of el~roic entr for papaingfinaial i.~ l'~~a.k in Richmond, Virga. administers it Th following i~$l ~I t".~tfildstl yo nee to prvide to yo bak in or to mae an Am trit påytto SPA. ACH amDIT INSTRUCTION Pa~ to BPA by ACH crt ar ma to th Fe Rerv Bank in Richmond Virgnia. Paym mu be au no li th the day befor paymnt is du sinc ACH is pr o¥eJh. SPA oa vefy re of an ACH crt paymt the day aft th paym is ma. Pæ (tet) tt ca be vefi pror to pring of ac paymnts. Venfiaton is a go id on firs time ACH cr paymts. You ne to pr yo ba th folowing impoant fields in or to ma an ACH credit paymt to BPA. 1) ABA Nur - The ABA num for th Fedl Re Bank in Rihmod. Virgnia is 0510370. 2) A~nt - Ac.~ 312013 direthé pa;yt to th BPA fund in the U.S.T~. 3) ~.. Nam -BPA. 4) I_tif~ Nube- May be U$ illte of the ad re (CCD+ for). Prvide the BPli invo nunt yo ~ payi anor the eontr numb. or ot idetifying inf~ m or forDPA to idefy th paymnt when it is reved. BPA Î$ ab to~ tf.€CD (Ca Cotrìo or Disbrsment Plus Addum) or CTX(C~T~~).fòai. XRG Response to RMP 37 - page 60 XRG Response to RMP 37 - page 61 3 2. :PAPER PA YMNT Pa paym includ pe or corpe chks moy orrs, ceified cheks, caiets chks, an ca (al seg ca is not remend). All par paymnt should be set to th foUowing Po Of Box in Lo Angele. Paym ar re ved an prse eve bune day. To en prcæt, st rhe re for th remitt including the BPA invoice numbe, co numbe, or ot idtiying account informn on th chek. t BOLLE POWER. ADMRATION P.O. BOX 891" LO ANGELES CA 911&9-419' Fo paym reuiri ovegb deiver or a signatW' vefying reipt, us the following phys ad an il's. Do no us this ad for any othe purpse. Bøvl. Po Å.tion Atta 41" SM UpIM WayCu Ci, CA J0 Ph Num 310-~1329 (rere for Fe deivees) ***PI wr File l4l96 on ib aill an on all coten of th paka.*** .. abUt b 1 aL" Æ" iw' 'P ll re81.eflM üo..le=i:=:==:t:==::ii~¡¡ ll==t"'_.A"~I'l..øcacl1.tP.o. Bofi~, Or ........ .. ..... to.A.. JØplJmet wibe re to )'.. . I)_~ ....d.._or.~ wi payi 1b lt JI be sent4l."'A. XRG Response to RMP 37 - page 62 XRG Response to RM 37 - page 63 ~ofEne 8oin'Ji Po Ad P.O. Bo614O VitC. WA ..140 TRAHSMRIO savtaJi..,_. :I .y refe to: TS-2 t: *,o.lL DeMr.~: ~ ~ Cr of Id, 1L (Bery) sutted a Small Ge ~ ~ to th Boville Powe Admniston (BPA). daed Novem 1.2l. UA 1W_ .. fC CI Nov 1, 20. an a4ed it in the Geenor~OB Qu asll No. 00 (R). Th ~ sø intne of 20 MW of wØ.. 1f Caa Co, Id. Th prjo is idfi as th XRG-DP"¡Pr (P). Â$ a f1 .ltÐ)', BPA mU CO poal envirometal ìmp fr its ai ie to ti Pm ...l to dt ~ Bavinmta Polic Ac (NBPA). BPAaplØ 00.. ~ .... ft tI lUy fole prva action tha wold be __it wi .. ~ of tb pr Pr into BPA's trsson sy ~ IPA.y ll ~to coiy wi ot Fe envimel law fo itsae l1 to i~ of th prpo Pr. Fo th re, a stuy must be .. tßli th ~ imp of th Prjet. ~ for )l ~ IR two. €Jgils of Baviroment Study Agrt No. 09- l3t (.AID) bewe li¡y8D :SPA. Am òt thin~ th Agrt prvi fo ru.. oflå :s~ Sty an spifi mile in which Exery mu prvide cen iRor to BPA. If~ CO,,... lJ ~a. reain on original. for your rerd, an tè th ot--. toon of lRføllo~: _ I lEi'. 1 ..:tJ.S.:D i" ófli~ ~ lWlilATT: Ke Jo - TP4 p.Q.Bø6i..VanYe, WA 9M Or. fa rtht 1J'u.s. De of BayBoville Po Adniston A Tl: Kelly Johns - TP-4 150 NE 41st Stn, Suite 130 Vanver, WA 982 Phon: (36) 619-5 XRG Response to RMP'37 - page 64 Th reuiHd advaee.payi of $2l) ca be ma ei. ~lI..~ (insons enclo).Pleøæfen Agr No. 09-l..,...'..J... Th tmecut A~ and paymllt mus be reve by Clo øf ~ ~l- Febar 20. 20. At a mìninu.lm. ftJlti by. BKery to exec an re. paymt by COø oo~ 20,20, will in....lldili~ 'With ¡t$ Geneor Inneon Reuet an wil ~. prng ofExer's Internetioo Reue. If you have any queons. feel fr ro conac me It (3€) 619-14 or~'" Etvìronmental Speialist, at (50) 230323. Sincely.~K.~~ Er K. TayloTnmll ~ ~T~Sa 3Bi~ XRG Response to RMP 37 . page 65 Agrmet No. 09T..1392S .1I~AL STY AGUE . . ... ac.. iaw ths da of . 20. (. or :w, a limite lity coy orze ankW l'~ Cu'), ad th U.S. .. th Bolle Po Adaton (1llri.. .if.:Ðin~ Cv aD TrssOl Prde eah may be re to as a "Py," oroollcvey as th "Paies." t uc.u w_...__._~.. MfB.. ¡~ne re toT~OR ~ia.....IJI.VP. 2Ø li oJwiDd ..~ from th Intenetion Cø's pr DODP-3 trje (Pje) with the Fe Coumbia Rive Tru..S.... (Rn); . . . ~ CI th Re iD th Geation. .'~. Q(; .. ia ma a de cong tl pr inton.T"l\iif.,"llI"f~..Il.II.. .1i, must ~ a ~() of potial . . . _._.. -.lJei. to ~tiOR of th Pr, purs to thNal ií p~ Al (NA); ...Mli1'iilili .,~~ çæ_ th ina reng from th. ... tN wuW be aøial wi$. _ intneion; WII ~ PNvide may also have obliga to coly with other Fe .lIIiI..n...... . .. ~ ~ Ad (BA) aa.th Naonalm-m.P.. .. ._ __ reat to th ~ of th Prje; c.t_"1 prvi ~ Prvide notficationn$. . ~~ held by e.a Cor or any oter . . .... ili4ts.. ~~ in ord for theTii¡itDDli...lâ.ID.~. -.n th ro of ~ßy ~JlI th Prje lA ac ~ rdt to Tnmmisson Prvide's NEA aMys. TDMS NO, TlII..9.~ of aD Slje to th mutu coveants cota be., ....ill...WIJia: 1. rAM.i". "...'1 ~ øfWor At th Inteon Cutome's ., IRac, ~ Prvide will codut nec acivities for coplian wi NEA an ot envirometa laws related to the prpo Prject. Er.. .Il"Y AptGeat lioODnecliæ Re No. 00 Pai1 øf7 XRG Response to RM 37 - page 66 Agrt No. 09-1392 (a) Transmission Prvide wil prpa a ~ of~ (ROO) tier to Transmisson Prvide's Busne Plan Envir ~l~ (BPE) fo NEA doumon efT' . action reat to th inter òf tl.Prvide re th ngñt to CO a 11rt Sta (ElS) in accoda with ~ l(b)"".Traission Prvi will coct a ti ROD ~'by peløia th following: t i. Conducing site visits an ating mengs as ne to undertand the scop of the Prjet an to ~mine an evaluaTraision Prs pr doo fo _ ~ . w. asthe ch of the affted erivi~; ìi. Attendng piblic meetng heldb)' .c.~ ~...,d.bois site peittng pr for th.~ in ~.to~nTraslon Prstôm pol.'*"i.lEø....~....~tand to acep co revar tOT~.. ~$MBA an~yss; iii. Conin va ot puli i~ -.. .ltdiftcrOJ of a mail lis, malift. ~ 4/ tReed_.~,_creon of a wes) for the Pm - iv. Deding whe to ap tb. ~ ~.. prng an exøg a RO titèth lf'' ~. this desion. (b) If at my lime Ï:r ~di~ at.. 61.","the ti ROD pr is DO ti ~~tllJ lllíill.Rdbrtk pr Prje, su as du to sigrfi .COtb ar Øltm in ~- ~ re lÐ at it td ~, to". 1 111"-. ....,...un . . PfO_ml..."....IIi.1i..seaRebuR!ueto~.O'.lm aLI fo..,~ wor th may be rere. (c) Trsion Provide will coy with ot Fe ea~ laws, suc as ESA an NHP A, as ap by peor th followllg: 1. ldefyi al apbJFe~. ¿ i_tilt.~. reviw, an peit reui foril ~.al!filO_ pr inern, includ bu no l. to ESA Se 7aøNHPASe i06~-t"'''æ; Envirome Stuy Agrme Ge Interconneion Reue No. 0046 ".iof? XRG Response to RMP37 - page 67 Agr No. 09-I39 ii C,..... th .re with releva Fe, trbal, .. ..,. qe àR ju~ as ap an ij~ Pf &,iWllssar apicon an apval doume, as.....r (l) .ill.... enyj~ da cole fo y * ..~ Cijs& al any contat(s) . ~ _..... ~-::..Pr 'de, . ~.ny ~-. J¡'--~' VI re tke . to ga îi da on the pr Trsmission Prvide facliti si~ as Re. Aay su daa colecio aeviÛl wil be at the co of th I~Oß Cuom, and wil be in adti to th cos~jn~ibd. 4N Ål.¡....ii wi.ul... ~.liy f. _.. an çOtent of thedommt l. NBA an ot Fe erroiiisa laws, Tra Prde shl ren final authoty ove th scop an ~ .00 aD ot De Fe envirometal (l) (i) Trami Prvi will us go fa efor to copl its ti ROD .. .,lØ _~ 3- ~tb frm wh th Trasmisson . it . æçve Ally comlee inforon, ø( tls ~t. Nong this áB PJdc is RO obga to iss its fu th hj aQil af th ~neon Custome h.c. al of its ot Fe, st. and 10 enviro pr ."'~il ~ll JU~ qf any a4miiustve or judcial apeal CO8n wi its bune pø In adtion. Trasson Prvi re th right to revise ih esma da of copletion of theenvirota sty pr as ne. 2. Pll'l (l lì'l1)1Î ~will ~pefy th es~ co of th envial st ~ an ot envime wo by Traon Prvi~ UD Auame A. Finaiál Ter aa Cotion Sta. &). .' ~ lal sut a de of $2.00 to th~ii ~ wi At A. Envin31 .1I1."ei ~tOeon ~on ~ No. 00 Pai30f7 -"" .~-.--- .._-"".......-,.,,,....,--_..,,-, XRG Response to RMP 37 - page 68 Agrmet No. 09-13925 (ç) Intene Cu ~._.. tha the det prvide pursuant to Setions 2(a) an 2() reCSMlS .. esima cot of an environmental wor to be peorm by Tramion Prvir undr Section 1. Interonntion Cu ft~_an agr_at .tl actual co of this wor may differ fr tl 1'r.u..s$iØl.J?...sesJlted cost.. Interon Cutoi ~lt~ytøt~issònrrvi4ertn..~i~i~b)'t~~~li\ pe-g.en:vi~t~.W~ un.tlis A~~.,...~overh raes ilÎ.rieate in Anabin A. t 3. Pt:eli:n.iiiiory Bivitolîtllental Review: Intercnnecon Cutom shl subt infoumâi ~ar for priminar envirometa review to Tramisson Prvi within thy (30) cand daof th da of executon of ths Agee Tl in~ inl1 the following: i. Pr facilties ma, includtl"'~ Infor Sysm (GIS) laye of wind Pr. ~tif avalab. ii. Dele Pr dept. meWti at *_mium. th lega depton of tb Pn ai 6e . . si anlo of tmne, 3D a ~ træion line. ac ro, op aa ~ æmieaioos, anothe pr Prject facliti; ii. Nam an ad of all pmy . an win a on mi ra of:fJknby~.'~ an any ot indvialin th pr Pr; an iv. Cop of all inforon Mat tø.y ~ alady cote for th Prje. 4. Stud Plan: (a) Intenneon Cus sh pr a Stuy Pl. to~ssonPrvide for all fiel wok ne to . 6Dvirontarevi for th pr Pr ~ ~ of exec of this Agrt. (b) lntenne Cutom will includ a br ~ of ~Ctoca ~ftldSê-.*' _~..viincJu a pr schele, in th St Pl. ~ Cu Environmeal Sroy Agrt Geertion Inteicection Requet No. G0 ...4ie1 XRG Response to RMP 37 - page 69 Agreement No. 09-1392 viil also dilo in the Stuy Pl any ongongSU an includ a summ of th relt of any sties alrey complte. (0) .Ir~ Cw wiU al disclo in tk Stuy Pl any known .. art ... of ot ~ Fel, or lo enes.r ~ 1Y ii lS.. ~ wi æv .. eitl epvo th Stuy Pla or give .. .J , r¡ii... C.. of l1 øe ao th plan within-Ql id . _. of~ øf lI Stu PJ If reisis ar ~.i 'i'SElI... Cush ___~ th Study Pln to Tr. s' gn PI'" wil fo (14) ca llys after noticefr th Trass Prde. (¡ Tr . Ii.~ ma it.. .. re fro th lBeron~.ur.dliulÌi ...~ Cu's~ in coletng --... lf..n.~ Cuøtømshall prvide 'f i.i_. JI i_ wi. tM st ~ wi leVØ (7) cand days. ,. FWI" _ ~. CøImi (a) Withn twelve (12) mos of exeuton of ths Agrt, all fleki wo.... .1111,*.... in th S_ PJ wü be ~by..ll1s...OII.... (I) lf.lì..lllr'IIB_~"'~..ita..cü~tilhfie w..... fdictÎ 41 ao ae lh ~ ef NEPA or its øl.ll1h. ......Fi Clmøll'" lø Traiøion Prvide __.WlI'''. ..,eRlie øf~ O'CII.W. llirea thirdpa ~ to oo.. any ne fuhe st. Th .. UII.811 all..eu.lilr.. .... lI _ oo of adtionalst wi. he ab li be .Y es *1 ~ or pr detsSlbmtl du to ths Agtt 6. &w~W....,.: (~ 1l.Mii. (ü).. of exoftls ~t. Imertion Cus"l prde re. memorda or ot ag upo... j .. i l i!,.Tl..an Pm4i thpRid ib ~ec aD ie of.a1l fid WO an da colleon coUC Ø:): m....ø..C..I.ldcr shaU al p~ as so8l it bemeaWll.:.,.'J.1i .. ~ futl ~ Prjet pR by Cas Coty as pa of th goverme bots site peg pr fo th Pr, so th this infoon can be ined inttl ti ROD to be pr by Tramiion Prvider. Bn=13.l~ ~tG8 ~ne ~ No. 00 Pa5Qf7 XRG Response to RMP 37 - page 70 A~met No. 09-1392 7. Due Diligence: (a) Interction Custom shall pr with du dilige with its repoibiliti ide in ths A~ ItTI.lsnission Prvidedein that birconne(;tion Cu isll ~g with due dilgenc Traison Prvide wil prode wntt notic to Int~ C~. Inte~ 6ll!wtU_ have fol' (14) ca days to pioyide a.Vì tJ2.:uc, eith coting the defieny or prviding a re ~ æ Tlsmssion Prvide as to wh Inttne Cuom ha ne piea.wi due diligence or believe that it has pr with du di~ r (b) Interconeon Custom shall exeris du dilige to timey cole and prvi iø TfaMlitm Prvitluieidf. ~- reat to pettng ~ _ th Pr. 1'__irriplbl includ, but isnot limite to, Ene Fality Siting ~ .~ot, an relate permits; or relat peits; and st, ki Of ~ si pets. 8.GovemiJlg lA: This Agrmet shal be intepimi GO~ aøenfor in acordae with Feral law. 9.Waivr: Th failu of a Pa to this AlfIl4ø iM..".Y ocas, upo strit pedormce of any prvision of th Ag'Ø wi_ be c:ed a waiver of any obligaton, nght, or duy of, or impo upo, SU Pay. Any waive at any time by ei Pa of its tigh \l l"lli to this Ag shal not be de a COms wa Of a W8VI .. __ec to any otfalur to cowith ary oddB" 1i1 arel'Jllì..r.. Agt. Any ~ waive of ths Agshl be pædâii,~. ~: Th Pa ma ~ tlA~.,a'wr iii duy execte by the Paes. 10. 11.Signtures: Th signates ret th thy ar au to en in tbs Amet on belf of the Par for whom àe sa. This Ageet iseffew on th daof~ lJ"~12. 13.Atthm A, Pina Ter _ ~ is _.. U' int this Agmet. 14.Attacme B, Co, is incat iRt .th Al _I .t .H.. Pay may re thr co iti by wrneDOté ...Pay. Enviromel Study Agrment Generation Intnneon Reque No. 0024 Pa6dl XRG Respónse to RMP 37 - page 71 ~No. Q9..(m5 .Ibiuiiiir_.tb ~ have Gatbs~ 10 be ~ by.~...c'Uill.~.~.J.. ................. ..1...1..11 I 1i,.....Nf a~ NIln.md~.. -....IMr..OPJDAHLL By: Hi .-.'a~ l'l II t ttll:il IJu1;' .,. EUfllJII0.11 11. "iii g I1 IIl .1._ He. oo Palef7' XRG Response to RMP 37 - page 72 A.met No. 09-139i5 1..,..1. FINANCIAL TERM AN CONITIONS STAtEMBNT The cos of performing the stdy by th Tra ~ il~,.=~~Ø:"'$ expense shaH be the actual cost of doing the wo spìn this ~.plU$an o~ rate of 48% for labr and 23% maerals, re th ~ ~,,_~ oføplus th contractual suppo costs of cotract negotiaton. biling an ~. ~ons.an contrt management. t Interonnetion Custome liy ag to advane $2,00, th eIi al'~ ~ ea, to Trasmission Prvider upn execution of this Agrment. Deits ma to Trnsmission Prvide shall be held in an account esish for this ~t. If Tl'ansmissiori Prvider ne aditional fun to complee th work &tan)' ume4Ung peorce of th study. T~ Prvi may re. in wrÛJfor~ Customer to advance suh adtiønl fund to Trasmisson Prvi for c:it in _~. Interconnection Custome shll advan such adti fl! win 3Q'.¥$of 1ì~ Provide's wrtten reuet, and Traission Prvide may tely it WO until Interonnection Customr suplie the reue fun. Ifin~~...._ adv~e such aditional funds by th du da or. if at any tiinbe_~leóf of th SW~ Interonnetion Custome elets to stop wor unde this A~,t~~~vr- will ~ an work _retore, as a cos to the study at Inter~.CU8()in's.pese~ goverment faclìties and/ot re (1) to thir codition prior t.o wo;rk~tbi$ ~t.or (2) to some other mutualy agrle condition. Within a renable time aftr comleton of th sty or teiiiatio øfths Agiint TraissíonPrvide shl mae a full acounting to Interc~~ri C'_onlC.w~rigtb actuacots charge agans the act. Tramiion PrVide$hl .ei. retai unexpenâe balance in the act to laernection C~ ør ~ll foray CQinel~of the dets in the account. Interconne Custr shll plYafyexceCQwithinandas of th biUing. Paymts not reived witln 30 days of th invo da win ae ini on th a. du from the invoice dae to th da pad, at th appat ra calulm ae with the methodlogy speified for intret on refunds in the Fera Eny Relat Commssion's regulations at 18 C.F.R. § 35.19a(a)(2)(iü). Envirome Sty Agrment Genation Interonnection Reque No. G024 Jam Oulis "'.-. XJ-DP-8C-) 9379~ea.c ClaLe Op Mager(2) 33697 &c Delot Grup of Ida, IL 40 Wes 14. Stæ IW MT 5961 COACT IIIB lì or lPAHO. U£ ~i¥e CÐ: Pl:£.l: Tedica COQ: PI: Dim. Ad: ~"'''lAnPN .A.-ive Co:BrTayl TI8JI Accnt Exective (3)619-14~JOv IamHaU Ct-. Se Engine (3) ~i9-67iW-.IOV le StBø~ Spealist (50) 23323ÎP1"'l2v U.S. De of En BoUe Po AdnisnATT: :Kly Johso - TP-4 P.O. Bæ 6140 Vaivc, WA 986140 Pl:E-: Tedic Co: Pl:B-l: Ha~i Cøae Pl:B-l: Mtli.. A4d' .~ &øy Afi !R'Ø~~~No.æ2 XRG Response to RMP 37 - pag~ 73 AgRtnt No. OO-l39S Attac B t Pag10fl XRG Response to RMP 37 - page 74 XRG Response to RMP 37 - page 75 - 'o,iu ti~_. ~-,..... ..i.T.. ~" "Ul." fin. t 1 rf.10.... Yl11......II.... i... ~-~1 ii".T~ _1".. WI.... ..........'.11._. XRG Response to RMP 37 - page 76 A 1'1'...1'15 AT i,,nr Peter IUcànd5'Tcìlfæ?,,~ P.O...,. rt;? ..... - ~t ....ä)... Fe 20, 200 Er K. TaywiTra Ae Exw~~~ PO Bo 6140 V~, WA ,.140 Re: TS-2 - DG--8 De Mr. Tayl Mr. C:d.ø ...r...i.,.lf.......,.Illfir..~lf-..l.r.i.._.~"...t.JI.. .fa fhW4Itis. .... .. .1111'1: .. .-.pr" ,..1Jma It1l._tr!1') .....1..1...: ti th co th tD for fi days Pl fè frie gi me a cd It,.,.., pilOt-~y );!'~ ISB3195OSB06 XRG Response to RMP 37 - page 77 ha~. ....lt~JÐ....,..... "'LT., 'Uti) In. Ai...,.. ia'" "be . i III. I' I . ..ttl" i in...."'lJ.'IIfLlli~"'..i.. k 1'2 - JD9 0."'. ,.... ._"...11'. ....L_.' ..,Uill. I....... ....ulli.... 1.IUI........1.1........ ,.W....._àl.~,....,.A .. XRG Response to RM 37 - page 78 .. ATTO.JlBTS ..7 l."W P~ter I.ìdtudselil'.,~ - SltM...StlIlli.._ Feb 20,. 20 Er K. TaylorTrais Ac ExBø Po Adøi*ra PO Bo 6140V~tWA~l40 He: TSBI..2 - XRQ.I)-lO De Mr. Tayl Mr. C.........'......i...._ llltlnl.r.... L .. ........oø.li ....Iulll Jill. .... It,it(lt C .,fa.lMle nita.. dO: 1111 iii i (Ipr__......Itis_ i Ii l.rr....UlIii...r.IIUt......íÌllt. tl ~. tà to Øt iv.y~ Pl.~,~llI'lilø SO.6eW.I. ir_ th ........1.............ex~it.___...M..-~.~ Pl.fol he. to .gi _. calf,.ãt., ,..f XRG Response to RM 37 - page 79 ..-.Oi-ims 111~8 ."11.- a ...1" øe'" .. fJ. .. . ~i_.. .,,'U u* ...' 'I.. ..IIi_ JI u i.a ... ...1& lø" _i..ii... fo m 4. . If .111. ..1I1!!11; iit 81'.. ~Ult.1 AG. ~ ~ "I~.~i,.1 ....11 i ìt ,.1.5 XRG Response to RMP 37 . page 80 ß,. Ul'. aTi21S In~ ~."aid"'..uí"Jì.'.d"".~".. to co..S,ø Ir s.. DlY ...at., S.ø 6.0 A DiSlbu S)1 Jm 1r" .... ..¡it......... .a..-.aa,.of...._~..,....l¡l.åØfl..~___ ... ._..Of~~.....-l.i.. 1.8 Afs,.. .........divi of CO'" sd ~ . af. opIB..it to aw.. . .... ..., in,: ,....; ~ .. 2Ø 'U." PUrlEus DI lØ ¡dEi_I..Aff By. 3.0 Ifh~Pì_aaø... an lM asat co Elbili b., i $& "c.side al peac., ...'.nll~_.__. . __.. Syè Jmt $W is $.1 Ar ~y ~ wi." 1"12 imrn~i_, ....t. lii.." .~.. u .__.. -..lb t '''¡IHI'' ..~i~;'".. t~Øt a P DI.II fI ei Iiin NlllllidÎl....'.....ri.... ..Tin Prs ek 1,'1'11 - ..... "HAl..._DQ....A,..l'._~.,Tr.. Pms qulJl fI ~"".iI'.",~~~-9.0 Bx De~. o.ofld. uc. xø..' PI_~lmpaSt ~ .Ì' ilt, XRG Response to RM 37 - page 81 ~01-ims ia :c iu .. t" .11 ..111..1. "Tuel' II iMi PI,'.,... .1_,. ahfiJIe..'ll.i. ...1. At J1lltllili 0.,.. II "il II is _n,lnut ac "'lied" -'.ii." '.i.Rl.n-t. .. 1M II.. ... ..........,.11. .... .....iw. wr ...mt..y.1........... III 16. _"It? !l . . t at_..._..ilU.......1 ""II nii.i,i". wave....PI. lU 17.0 .lf '.,. CaI.,..1' Aø 11... __ be eu m tw or JI~--.,1 ti- ..llIi~...Illl _ai...!- __ tb.. i_ui . w_i1di,i 1118 II of"ll4~~1(æ " , J J......... tIit ,.30(5 18.0 19.0 XRG Response to RMP 37 - page 82 .Wll 'I O1-imS 20.0 *...,,~...~... ...of.,.... IrUI..~"'. .'.111 ""I........... .... wi. ,¡da uc......m.n..,.ea Pa sh.. Jl1.ie......~. 19.1 ..~i;'.I..i.. ..ti!.lI.!..~_.wli th iu...ii Ole ...... ht hyth All! !IT''''_ ...... .11 IIaa sh .. ~ .. ba ap ~ .,.lilO...... 10.2 .. ........ttiu....udl.....Jl. 1.'" .,....l.i9& of ~.._."' iwIMc.. 21.0 22.0 ~ A. ....1I UliR (2 ít ..... &b ,I......,... il1 iato dr Ap . SRt ~~GæofUâ uc DO-l ttS)C ImpSl~,....5 XRG Response to RMP 37 - page 83 Aø_61-lim .. .. IfuMII' '..'I iiii' ..,. .. c. ._.'17'" 1M S) ..It. -.1. luUi..II.,Uil Iü A.iti .c"eiiminttll .iimi I....... . DlIS "..'1111\. illlll.¡.....aull ..: .1'..A..U.......flU. _.__ ...1. '.1. -.lltl .... _.,_ ,.bi"..........1.. Il It.EII'".. .. dr_. ....." ..¡¡QI 8MIm u.lI.1t Iy Mi..:'~ .. '.. 'b lIlUlil , 4flJ1JI!W.c.JI.., ~...Il.....A. n Pa..rs XRG Response to RMP 37 - page 84 A1_mT-lms Ái.1 .A AS 18 IN _-._'lSYIMACmJ Th Sys Imt Stu shll be b& up Ik .. of_ 14111i¡lflì &l,. -¡. ..Yin~ ill....SI wi.. 8lSm Oc II ..IIlltUIIlIl t.. ii ll ( dull...d1fdJo ~ . 1) Degn of Poi of Imi an 00~ .. ....lda 138 tV Sub. 2) Oegø of alve POÙlliut I. urnl:. 411- ~. .. A ne sullaô ai th .......... line. Bi Deve Gr aflE u.. XI-1(f1.Sys Impa Sty ~ ."-""1 XRG Response to RMP 37 - page 85 .1_ar.I27S A1C ...... li' " . l .ft _..111m. i i. ".,"iif i iir'....Jic....iiiif. ......IlAl_IIL. .llII"IICDØ'.'fPIUJ 'i II .'11 ,.1"1 XRG Response to RMP 37 - page 86 AC in.. 07-Dn ....1 .c~ IIGYDI!I99. ...1.& AdMSludlive 0DTiPl E-mal:Tec~TiPh: BiumAé-. i..e.. Ii1I1.1~.".'(i..UU .'ri t nrt 'i'g. Cbii. Opldll Mii ii,.(23~ .U.'8I'" ....._1I18.Û£....... '., _.Jt.........- Mml1i".~1i'Ph: E-ml:T~~ TitlePh: &_1: SOIP Ad Maling At: lJ1'1\'lllJ! ~.81l"". " (3) 619-14...v ..1I0." Ii ."WI lliij I eJ(J'~ II PI- ,In NiPe(JSI'.1f u.s. :D 'Ø.. '*ll Po Mmìn' ... ATT: Xey Jo -l'4 P.O.h6140 Van. WA 98 Ph (3) 619-5 ExeiD$~ Groflldil, Ui ..'_11 II~,lmpaSW~ XRG Response to RMP 37 - page 87 _111.'1.11... ,. -m.7l18R ..'l... ...,,....1..2 . Mr. 1m ru eedtrili iili I '."lIln._;.~uc ~ I r LI.-' Iihi l__,IDa.. iiMr.e~ . .iUid_.III'....1 ,....... ,.11..1 ...1' fll... ..... ....11 ".1_. .. I UII,L.hl 'IlB I.UI.'!."'_ ... .-fl_ llWDlA.. AaC.. s.."ll~. Ii__''.~¡1''' ..x.~ Tl1n.,rr(.. _iill.. JIJ..Tw.i(i.... XRG Response to RM 37 - page 88 ø"........ "l..II~ Marh 31, 200 In rely refer to: TSFlPP-2 Mr. Jam Carulis, Mar Exergy Dcvelptßt Gr of ld. u. 802 W. Bannok, Suite 120 Bose, lD 83102 De Mr. Carlis: on I.ua 22...., BE 111'....1I1.,'.....Ck'..IJ.:: gJ,.itlfll Grup of id UC.. .s.Q;t. II. JI,...S...I(jJIlll.I"x Agrt (NA1 Ap nr Me OJ..iir~II.I. '''''1Iin~oo."''' cm..). UBl~...,....r lT lfl'Jll.l'l"I~Jl'ØM ~(lG. Bi ba ""~_.:_...'.II..."" along with the $20.00 det f() th NE A ~. As of th "0ftllild. ~__ __...11 in _if.PJilll'.....I"__. rete det for th NBA sty. . Per Seæ 3.2.4 øftb SQ, lI.. ......_ J 111111.':* ....l ¡II"" peor final ~ am R! tl lIied_orllla." ",.1... If yo have any ~ pi... .__á1t.'(æ:J1\Dfíl Guilt".! Getor Intrction AdIiis, at (. 61"". Sincly.~l#- Er K. Taylor Tiass Ac Exec ve Trais Sa XRG Response to RMP 37 - page R9 Dr,nlLI ...... ~.Øf_yus ..'1... iall,i..,.i..i n.Wr. e_uie: a. l.!I.. . mJA. \ t rl R. n.,.lr~!!;jq.I~~...__ ~ .-~ ...5$.- c.-ii --1.11... ci.A& LN!LzN hi ~-I til 1 1) ....,~ tJ a_ii. 1.2.4 (I JUA .is. QI..ØD'" lA-. ...... Âl"C . _ii.oid.. ~ AaIPI1.. ., ma tM 111...."., ..... ... wiD ~.,. -__n i.....tnot.UI4',"u:is '=t.::~_ SiI_IY..Á¡l.~ lll'T.. TlJl"iQliil1 ".'lit løllve"hn,.Ìl¡.lllu XRG Response to RMP 37 - page 90 ø........, ... Bøme.............Pb.ø.__Vån. WA _4_~~SIK) Mah 31, 200 In rey refer to: T8F1-2 Mr. Jams Carkulis, ~ Bxer Developt GrP of Ida. u. 802 W. Banl'K. Suite 120 8(se, lD 83702 Dear Mr. Caulis: On Janar 22 1O. th ~ne Po ~..~ Grup of Ida. u. (B) a INl OraillAgt (NÂ). AgIJ 'N. MlX-l3ØI~oa. Re No. 001 ~). U I~on Pr (SIP. ~ ba dd CJ alon with the $2.00 deit for th NB A sn. As of the da of thi fe. Exy has Re n! ii eM.le ._1 fi fil' _li_ reuire depot for the NEA sty. Per Seio 3.2.4 of th SO, IWA tlll"__ _ ....tll. ...9Il8.'.peiform fina ac án.- th U'~~'Gf~._"" If you have 8ly quOf. pl ~ _ tt Genertor Interonection Administ. at (J Sincely. ~¡l.~ Erc K. Taylor Tramiss Acct Bxecutive Trasmissio Sales XRG Response to RMP 37 ~ page 91DI'....,.. ... Po AdiRatP.O.b61V~.WA 9814O TANSfS _VIC Apl u. 2010 In Np'" lø: Ti-2 Mr. Colt Il~ IA Pm ~~ 1iÐp... (' of Jå. ii - W. B't .. l2Ø iwW &310 n. Mr. Rud: .~~.i.. ~of~ LL~y)suue twStl GEpr .., r....fê.~.. Pow Adistion (8PA). DPA reve th...on. lA ..il.~~I_ ~tlm in tl Ge In~ion Qu ......I(Jll_(Jll CI.-). Ba reue "'inteonio of 20 MW of~..~ifC..8ia.~y.kl. itA ~ "i~~With.. Re an bas~ you Reue... ..-,.~)~ ollPA'ss.i Oe ~oø Pr ($OJ¥ Bus ~. ....~,~..~.~..sl. tb.- Site Còtr.aß Pont of Intrcll wi. .... ~ ~;"'.Â'$IQ Bune Pø maes Q011 am 0012 inelilibl to ..... ........... '8A will ~ withreng th tw $2.50 apicon..té... If JG Jt J& ... ~ ~ me at (36 619-6014. S;~Y.~4.~ Br K. TayloTrali_ Ac ~veTnm iul. Sa XRG Response to RMP 37 - page 92 XRG Response to RMP 37 - page 93 Ag No. IOT-14597 'A.iD.QV .OUQØ ..'1' _"112.IIWI.tn¥i~id___. , .Ili...i J nuluct_BmHleuradßin.. ii '.ii ',.m¡.18 _"I_..J_i~~aa. ~am øi.. .~ Ie _~GO.. eota 11 . .... TI ..í'lÌ~ ..__ s,uifi ..II Ráve",'..-_.rî"'~ i. .. iit thT... ~.ii ca a -....I1Uila-OillE I....ill~~._.tw_Ji$.i.~ll~ ~ 1.0 'l.. _tl ~ .. Ih .. lUli to da Jlidi is Atta A to ths.... 4.0 n. .. d.... di sp _ prvi at no-bodJO fåå esma of th p.ll",am~1i WQ (meltl Gdnø._..ialJ.i.~~. Th . ß."t...IlGl..of"'lOlL-~)..,...Ap.- PIlof4 XRG Response to RMP 37 - page 94 ~ Me. UJI'X-14S97 faciliti stu shall., Klfy (1) th elW..lltl.. ~ of ~ eq~ .in\l wi limita ~~.. '10,'.,,, ...~~(idI!Ø-~-"" ...ln~ Pa an U,~ IlI if'......, . . ...i ....... ..... .... . ....... ...... .h!" (3) an esmacitt time ~ to ~. ....- ...._.~failti. 5.0 Th Trasmisson Prvide may ~ to øiot ~ .,¡'iii.,.. -- Intercnnetion Cusom in or_ to ~ falioo ~ ~d sce. but any lntertíon Cu ma mpre th ~ øf i.Ji ~.c' '--All ,.~~ n_"'l~ 'f" 'm_ . ..- J~A"llloriUQwn~ulu ~~ngr-.....1 i ftiaWl~~IO"'~~~ ~~ 6.0 A~tofthgølW~f~Inteecon CusOf pror to tk ~ 7.0 8.0 On ~ faelitisty is cole a .f___~...fØ..~~.n.~.BfQíto"""."to ~.~ e.1rio.. .r.i...~.Custos a. to ~ .faeDtst. 9.0 Any $Wy fee sIl be baQl tb ~...invocetothein~~. ~.... 10.0 11.0 ~Lt."..Q1A"~_.f.t~ei tAtl ÃII .......... Law. Ths Ag is ii to aU ~ LI1i'.exprly re th ri to se cUJB ia ..pI! al... ....,,,.1......, ~~()."ofa~~. 12.0 ~: 1l~. may.am this ~.~.. _.......iiextebY.~ Pa. 13.0 Nt n..P.I..lÌ.Tl....!!IiI1...." .."al'.du...iilru ri~ rees or ht of.,.. ~..lf ""lf'lIIi. Ex Develot Gr of id. LL - (GISOiP Paliti Stuy Agrt . "'2'" ,W. 16.0 11.0 18.0 XRG Response to RMP 37 - page 95 AptNo. lOT-14S~ .. _~_ tM ...ti hen .ii...,.... ... in inte li Wi ... li .. ._ii fIt.ll., .lIii ... I.... IWIo" .. _1.,. u. St '1111 tlI14I., ,.Jii..... .'UIiI'" ....rf&n a wave.,., .....11 " .. or ày of. or ~ up. su Pa. 14. ......,illl.,.....tl...s .lt§(1IIn...~t ~.... .,... ".-ui wa.. a wa.. wi rllp;i to IR)'....... . ....__.........111 nt ettl .... __ .y_ by ...,.-Q Bii:a II __.. OIli. 'Mw:øfch ~ ~'s le~.. IIIB:'. _IIIIUt....... T_ll ""~. _ wli_$I .. ... JlIII... ir if N4lusb-ltJ pIYi in wrl. Wl,"..tl4 ..£....."1.' _~..4llft Uil____..i.. He ...1 dii ; 'l Al.._. sh RO he intpi or ~ to ae an1IIu'ln",jè -atl'MlÏldlF' _II...,.... OJ ,.iip up 8i Pa. NI.. .. .." ,. or .ity tI ente iDt any ."ee or u.nafw... _. fi"ll fi. to as 81 W be..... ...,pt." of. or to otbi,....... ...nUIIlc 1f.,..l.l."_øf_~af Ib any re . heer...1_....W.~ . . ~M1 ol~j~ ...~.. i r !... .... or . 811 be de se.. .... 7 iiltXIt (' ..~ shl ~ ill po fath to IU insfa as II. . fIli 11" dl"...,"'I.. ItW ,....," .._.._ (3)là t'..$I 1l .-11_ sI n! in ñdl fø .. lt ¡ai ,..H._....~ ~p ~ no id~ th lilll hry of .,-II.,iItit..W,.... ~it. Th bÎ!Pø.,,1 be fuly__1..1.. .....~for th... or omoø of any ~th .......if_.~W be ma; prde hove, that in .ø.:... Ol.. Øfl.hl, ~_ni... ."t! . i"" .Ai... "3014 XRG Response to RMP 37 - page 96 ~ Ne. lOT-l4B ./~.t..~i~~'Okth lineæi Cu un th. imp by ths Ag up tb hì ~. slr.,.,, an shll be oo as havi apli tot _~.,.II.! ~~i.,,,_,,_..'i"ll.~_.""ør~æ.'s... 19.0 Attbmt A. Da to be pr by th ~âo 0.. wi .. PaIiStuy Al~ is ~ ftlt ~.. 20.0 A~Ð. Rlf8èal"___C.._oadlllll nltrlliil8k'..UU-tmA..me 211) ~C,Qi.Ia._b"~.'__..",ir.71hlí Dl "IIMI . . . ..... Pl..nø.... pr i. ...~ by th dtly ~ tfS,....oi th .... ,...'1.....'.111. Nam '- ."p" Jill.. ... Fr....¡ .,...,~ . ,.. Da: .,1,. ~ Exer Pevet ~ of ki. u. - _I..SO ..ti Stuy ~'''il~'' XRG Response to RMP 37 - page 97 ÀI~ No. IOT-14'97 ......n:.tA...at 'OIJJII:'1I1' CVmJ AcaDI . ~... pl.. __ fait Fo ,. 11.11118., "llsml cRts et. Oa"" IIII I it , a 1I .... _ ,.at c.ty atMd at ea mell... ""_11'1..... cn Oali_iii ..."...i..ll..tf~~. Ofiiia....al Aa ..t ..... llUi'" ~.th l1 ring bu ern..I.UUIt. 'iiafiun rii 1l_llnSi_: -.. .11. J .tlil','llfI........C£....,YI_._ . .. __ ".1 ¡ . 11"11 i wlL wi be i. at th Sml o.iran¡ Palit1 "'. ,.....'.....IUt pl.. J .a us? PI Ill' flid. 1.. . . "1.1 .. ma ~ th sile. lnca _ pl. ston, trÐl.,.. pi a- .... ..¡II ; .. ef_..,...~ st 1.1., ~ d ii i l 'd Oø fI JiteOoJ Ll'-II)...I.....qIJlII..,.iøtl XRG Response to RMP 37 - page 98 ,...~No. 10'-14"7 øus le.fJ ¡eon to inte ston: r,,t Line lengt fr inteReoo st to Trami ~ "f..lii.h. S)l Towrntir obed ìn tl field. (paite OI to le: Num of tbrd pi =aii .1111111'-- ill iiluii. ~ *Tobe~ìneiu ol...~1'¥ 1 _ß~hU.. Is th Smal ~Pa løited iaTlu _.. aeùl"-.. Jill i.' Yes No If No. pl pm na of ..~.r: Plea prvide tl .follo ~ scJe ..: Ben Conson Dat: Ge st trformreve ba fee po ~ Ge Tesng Da Coial Opon Dt: Ex Develo Gr of Id. u. - fOil.)Faliti!ty Agrt _lJil~ XRG Response to RMP 37 - page 99 ~ No. lOT-14S9 Attlt..tB..~..,ii. ...~STA'I ..~il1li."~.it. . . .l.rA"'tl wo ~ ~.llu· .1..... _ell. _...1' ni_ 1,. km.__ i.ui.... i~ coøflÌ... ..,'.........1 ..11. 1l,.l.:u!l,i_".Pi1f..WlIN_~ftIU. _hw .E _ . . . fUleb.! tbwøatan1ti~..-'1-' in wr t.~~ __IIIUI.1 I.......... ..~~8Ilmaafti... ... co~ ap th aoT..niil.ul...,i.i.U __ ..t ba in th ~t to1..11 Ii.... OislclUf at" s ~ or ho any unpe .- 18"" ..,: 1. til.... .... o. ii.,.1 em Ìß ex of.. ..-.1 ÎR 1M _I II. ... ni \l '. Claii .. ll _,ll .JI.l*l Widln 30 da of th bißi ft 1 of i XRG Response to RMP 37 - page 100 ..NelOT-14st7 iUm I. C COAt" The Ps.. di any ~ to" À''*tlllí''iMitC''.''_ J 1111271&.....ot pay. 'AlJwy~"'u. Adminivdecica Cota Con R~ Title:Ph:E-mal: m_ BiUing Adt:IQW.......~IDIS.~Pl.- Admmstnitlve ~ Title:Ph: ß.mail: 0' HlnTn.,. iid.. AÆ.m.,i..14e (3 61!UIrU.. ..-. .ie.. Teç Cotact: nt1:Ph: ß.mal:fJl.. . SOIP Aè:i~Ph E-mail: AMCò~1S~."...1. MaJißl AMes: A1T: 86 P.Q. Box 6140 Vanve. ViA .. Ph: (3 619-S Bxtq ~t Gr GfId. LL-~ SG Fælt Study ~t XRG Response to RMP 37 - page 101 ~ No. lOT-l4625 ....llÂGI... , _..~ _ef"- ioio,. Id C. a. .. r at'" cia .tli)' 'f4'f ILt.c~"nDnuli .I,.()¡ ìr,H)an .li" ~ b Jlllc Po A.r.ri...~ anTI~ Preà I')' be........."...iu.. f" 1"~ ~'1" ae "_lI.fIlI1'. Q i. ÐR is ~ to de a S..U Ootina._._1'111,.1 ~i1. Ii ...PaJ~wi.. . "'_II.flUl1~Qin.. n__..i.-the.'.1' ....11 ..I.'I.lI-'Ol;.ø Gi.aiulJ r far I . -. i ii II II I J nul. &i Srinrang -.Ift,. 'laiiif idl i i. a,'fllllli .. .. Illd...._IIIIUIIJIIX.'JiIl..JIIUJQ:l*it',lJiIIIJ -.8t_PJ........fJ.." ..... ~.. Cu- '... . I 1ØIiIJi._wtjl..____nnlfceii-..,....~i.e "",lllIu,lllll Ir____ fluiØ. dlui Hliiìl 2. :$.0 "...... ~.s ... ...n. au to" pr~ in Atlmit A tøtb.uurr4.6 _ ~ a nc-b"l PJ fa 8I of th '''SIlI'II''II.I'-...8 ..(i.... dli.... . ll IJ nIt i....I5I). Th ft i of4 5.0 6.0 7.0 XRG Response to RMP 37 - page 102 ..1l No 1OT146 facilties study shall aI il! Ii" (1) de *øtilln 11.~ of Ú' equipmet; inlud, wi limita tr.' . .1$:8, .. EJst eqP*. (!th _.. &D 8'~"'d.In~æ~Ji an ~ "lSI !:Jw, " ,. ., (3) á1 esma of .1i~ t&.e ,Iell\" _1'..faHt The Trasmisson Prvide may piUlIl&.. .,1'. jl $41 ......lIli'll1Interconnection Cu in or to inrlmi fa ee ~~. scle, bu any Intenetion Cuø_r.. líre tl ~ of ~.ll for its own Small Qeng Facility if it is WiIlIl to pa th.(fof tifa~ A.~t .of.th.~."'_~lJJ.fl~stslt...! ..i.'.Jfl......rrlO.."ll.i..~on~pf__~d""~ In C8 whe U~ at..~ .Tt..........,..*_ii.,.-Bftø~_.~~ .. . ...... ./.. ./ . Agrmet. In cas~..uit.l.__IUJlli_.I.J 1.' limite to Inte Faliti th TI'ßIi.. Pf øl we.. n, ...Mor to CO ...1i.... 30.; 11 II .QI 8.0 On th facliti sty is eo a fati st 1l" .. ad tran__lblilln ill tlci...SJ n... i II i:.. . .,. -~ Bf eoeø '1* ..,.Ii_.il ."'MUII.to_ll.__~ W!II¡¡"..itllin..ør.liliiuILlllt.C~'s"I"'1O"".f"'''¡ . 9.0 Any sty fe sll be bae OI th Tnmsimi ~s ~.... iJl beiR,.oi(hoth~eu,""4Ii6.)lk. 1,41"IIIIID ¡ii.. 10.0 The Inne Cu mu pay an It 0Q tl eM' id ..., gai wli~wi39_.dan.."._.¡... Jib 1¡IBill"".'. Ifthclt~,,~"""1)i ,1. Effor to refund su ex with 30 ea daysfl "",~,. ' '¡llll -.. 11.0 ~1A, ......"i\í. ; "._./l..en~.thAøp.s_-"'''..Law.1'~is~lø.1ÅfI1im .'exprly re th ñlht to ao ei in, ... or ~.I..1J IlII'." _s.or or relation of a Gove Auty. 12.0 Amemen: Th Pa may am th Ap_ by a Wì ÙI I ISrt_ execute by boh Par. 13.0 .M1J-PM~eiJi_ ".......l D1 tl 1..ndA. M'''nglt$ l~ or...ef an ~ ....øi.....él IntllllBiie.. Exergy Developt Group of Id. lL - fGSG.Fa Stuy Agt XRG Response to RMP 37 - page 103 ~ No. lOT-14æ _~__ øbipOß hea._.. .. aø.....~ 11.__ tnt 1"'. r Jj Ji ..... 8 iMilf, - IN up sl . ..Jtl..4.11.... a waive .,., tl.....~.... 01. ori~.., ld Pa.i. ....,J:"."...... ..11..11.... 16.0 . ,..... _..12 a. il" bl ~_or~ to Cl anItlU i (I.i..t ., , c... U:y Mla,._ ... . iu.....,'.i.iul.....ø_..~ . lJ l't, sIm'.. -:d_,.or aøty tÐ .. int any ~ or ii ÛB._" . b .hW.,.. .. in _ as or be ..aU" "'Jill .,i_ .. to otisebi.__ lw,. 11.0 ..., ....' .....1111 ..."'tl~__.y8tbe.._or..1..,......iI.h...~...lJa:)'~d~tj~or.. ..~i $.llt....~ O)..~ at PJi¡ll 1I.4ø se.. .ii, l.iIL"" "'lh ~ in.. fa to ~ Îl as:;I:n:~~=~...t ""ia fÔ.~:~..-OO'" 1& 11.1 ........i.._... .tB~ aii_.. * hir'.Pæ of __".....i-. .._~. 1lhiri Pay"l i. fuly .:4................................... _.:../......... ..........t..J_..tM._....ør~. ..'. øfaty~tl. ... ......~..~.ìf..~.W.he..;.~ ~ve. th in lLla._nll...i1jo..... U£~~... ui..".lllll:Uatr.llf4 XRG Response to RMP 37 - page 104 __ Me 1(J~1'" _evt sl.. Till'. (øi M.l.'II.......... I.......;..th~l1~br*"'.. ......... .::. ... ... ..øtth lntetmon CU8 \l t: Aiel..II!: i1..r ii" tW impo by th Agt up th hiring P8" _..'.dt...~ an shall be co as baYing apie..., dl..G. Of"~ 11.2 'I'~......~."-."lO.......,..I-öf~"ií_'" 19.0 At A. Da to be prvi by th Iilløo.Uili eu...liM .. dI lWliSt ~. is àifIieie" ~, 20.0 A~l.flriT.ms_C'...t a u.,.IIJí1ll1......~nê . 21.0 A~Cj C~ 1ílJu- - 8.... ..11 l in rN wrilf' WfI. th fW 1m.. ,auri!. ~",.,. M...-.. c_ by theirduy autze ~ èla~ Of th. Sl,... ......~""....¡JIApp~:By: . -4dÍWJ .l Crg HarnNartlt' .T~.~~.'" t/.;Da:--¥EXY~.~LU Appved: By: oi-,'; Nmntle: ""..111." _r !P 1_ _' Date: tr;..u ...f.....' ..l ,. . Develot Gr of Id IL - (d5) .Ut Study Agrt ..... XRG Rtsponse to RMP 37 - pagt ios ~No.lOT.i462S ...A"'___.I.IY"'~ct. . .. bC mJ AGfI4WD ...1.... 11,1 4 .I..it pe:iì eaty ... 8les ."ii.1....___i..it.crlP Ði .. ...!l. ... 11" I~... I;... l/ lUåWi..... (MhuIBuøi1e OICD~ . _Uti"r..iii. ..... ~OB 10 ti ne ri- ..ilDi.. ii USllifl_i ..~. WiD. 'IUI .'L '1IIIILUil.iiilJ,8 n." waldnlc. ~ CTJf aam; in..?Yw_"'_ . ". of'" ti... .. ee 1I li .. ....V. No.....1___). .. _ of.. II.. .. JI win .. ki at th Smal ae.11l Jlti .. 'lI'LL pel tau'- c:i.. ii.im fl J1 ui? , . ,0,_ ,,~J p JlI...rr....l..d1llIU.......I. It ill,ll!ørda _. Ifee .~~oi. ~....'11.0.'.. ~ .'ii .1"'. rr- .-IsMI ~oo st: = Di,n, It tJ.~ IL (O)PI"'''A.liø.lt PW.lof2 XRG Response to RMP 37 - page 106 ~ No. iaI-l4& Bus .kmgt irpneon to intneon stion: ':;t,,¡, "~l~", ' '" ,tJ",:,C"". Line length frm intonnection ston to Trai$$ ~'lil"...~ TowernUibe ob in tb fi. (Pte on to 1e*: Numbe of thifd pay eats it\1 fo triløiilS ~: . .. To be eole Î1 ool' wMn....i Pt.. Is the Small GeadngPaillt io m Tillti .."'~... .., Yes No If No. pl pr nm of io...~. Ple prvide the folJowing ~ sde daie: Begin Coction Da: Geor.st .~ ~ve bak .fi.po n. Geon Tesng De:I:Cornal 0p ExerS) Develop Grup of Ida, I. - ~)Faliti St Agt ..iw.i XRG Response to RMP 37 - page 107 Agrt No. lOT-l46 A......tB ......1, I .. '."..llfII'ADM 1'~ iri, . . .. . ..ft. Rlli&å. hi.. .... .' . . .OHI ...r'i . _1l....WO~m Ap~pI · '-Pii"i" I. .,.. .. lnl.ii MI' 1M.. ~ 19_miDl dl indrct GQ øf th .......,... r 11..1_.."'. lllIl'.1IlU.1nl.ilfî&~_ .'''JJ''.--., _øit.ø ..11'. . i.d. . ¡.'iair n i ul.IO 'Ii uirh..., aiLs......' ..íi. dlesm_tI ite& toTu r n ktriM lìøfllr ..... Deis ma to TrassIil!M li... .. __an 1f1i1 nulq1l. ""...nIlIU1IU1lmiiø..u 1f11' tMwoatuytiJJdl. iuabnr ,. .,.11.._." '! ri p n 11". "'IAltlru. "'If ¡i,. in wrti to ~0i1l11".. ... .. ..'~l. Ii lÐ ~ Pæ fo dq m th 1Ct.In.i fSIIS'.. Ot. J1. ...... .rletdo ñm wl 30 ~ ofT~".ti.'.._I.._..,..,.. ...1.'lIIS 11'.. ,1111111_ ~tkno .I.R Il. .. ",...._ .i.ll..ûm ~ ~_ øf~"".iiRU ran e" e.s.. PJI..... ....1.4:1; "~, 1ìsson Prvi witIMe all \W" . .iu." l! fino""" '..~i1 ,uidioø Cu's expa. Jl _'Il ft.... lII". ... 1) -I'lf 1lI11.cP to _ b8mrag ef wo UD.rdù ÂIs-..3) .............eoti lf... , isin.ttl. lI lil' '.1., iilUM. ~ Pr shl in a f\_¡uri Uiiii .. ¡.hl_Ui U'u: Qíir.:. ..t_..lJHl eo dJ ap th arUlt.TJ ¡ 11..fli..r....II.:r . ÏllhaotoJiii.iiii r .,iim Or "i..,.... $ ~ or bo any ~........ II lil "".'1'11 ill., or bI _. MI in ei of _j¡ tb... wiini I' 1111. ON r_.fl",_ ._.. wi JOèa .Din¡ ,... - ..1 Ii_ 'l IO..... _.... will ac ii 00 th am duÍl'" ....i_ 'r ... Iii Jt ..í\li . til i .Jf" calai in ~ widi_II .. .e.. ii (I~ . .. .:atg'I. En Itla Cosson"sf''lI_aii....i :: D8'lI,. Qlsil\fll'ili li lL- ~. _.__.Itt "1611 XRG Response to RMP 37 - page 108 ~ No 1(1-14G dlAC' À._.C Th Paes agth my r&vå 1! fb A.a._ii ...e ""II."" .R. 81..... ot pa. EUlÇ'.RI .......ll. Administveecnica Co: Title: Phone: E-mail: CO R.I. Pr" ..,. r It(Ø..i...' ~~ ~.~ , . ~- ' Biling At:.. ". . l .1 l Ii ~..,.,...00- AdrnM ve 00_: Title:Ph: E-mail: CR.. Tl JIm". ~.ritj'" eM6i,.i 1vii :....nm Technic Conta: Tide:Ph: E-mal: SGIP Admltlì: Phne: E-mail: Af~~Cil~~.. U.B~Mang~Ac_: Exer Develpmt Gr of Id, LL-~SGlPPati St ~ XRG Response to RMP 37 - page 109 Vll.LiPOWER AOMINllTRATIOll ....a.~....i.ti..,...... 1. _tili 'U tiaItIS.....e IN ..IIIS ØJ'l,. ,. I... ,... ~I..11 ".,"II. 15" _I iñe wi fi. Yo m8 co us af yO_..'n:__......1t_..~_lF. ..,... ~IIILlI" . J) il 4l l) taiiUI"..-r..../C'.....I.... ...."'11.,.. ~~toinl8WI 'I , fi.... iI li:" SP ff AU ,..,". th æntr ~I orldilllt'..iin i .)..ye~ a. It. UM1 f!U¡¡'1t 1.111 _n,1 '.1.1 1m' ..,....._~~._..AOIs~~_.,..lIdll..............,f4lO~ .._wØ~dllt~._.1". Ii 11~ligll..11 J i Jl '/11..11...1(% at \tl 11 'I. 4l ...n nlíu .11. i i ---JI 8M Th fi II li.... eftM.~i1.. ..'b__th~.. -,ii,. . ' ".I_lt II .. .. iWtiiiilnn f8PAl te aula. i ii wi pa fr ."it"., .......,. _rE. flíI'át se. ~ lO It tl will Sie be'fo Il". '..1'11111'" .. ,.,uui......r....iai..rn.,..... _Iii_ -'1'WIII,i1 JI_iJlr.. .., _ _ fé IMYme..r $10. Qf.-1.1.. i" . 111.... *uU " T r nnt_ _.. am se.. ei'" he fer Pa.Øl. Ii ...11_.._11111....... (U-..~ni De);__ IJIII'. ~ Adil""-'_~r.. ~Q., tAØS I' 11 I. : f3eJ --J.Ii. ii¥ijl Fe ~... '11..fI__en..ai.._.aI__ite#th~.... y...PA....flU:Bt_I..... ,IC.dl&ye ..lteø..~1.-. UIø ll q. XRG Response to RMP 37 - page 110 XRG Response to RMP 37 - page 111 8:".1111111 of .. Ilri Po AdmiiiüatP.O.e.6140Van. WA -"140 Offí ~_VIC My l S. 20 lO Ii iey..to 'l-J4 Mr. Coli ~aaw.....i....ID U1 DeMr.~: .. is.. 1 to rh ~ Sys Im Stu (ISIS) re adng ""ßlIl ..,1 eii_ ~ for Exer Develo Gr Of ld, lL's (XI) Bf ,.c(. 1lISIJ Ilio ÎßneOD re wa submitte to Bonele Po.. Åd...l. - T_s "... ~ (BPA - TS) vi th Op Ac Tramiss Ttd (O ri) _ is Ii.. 11. c: ii BPA ~ TS OASIS que. Th st was peor li 8PA -TS"" Ai-- No lOT-14S97. .... dI .. UI 0I do with th ap direio. If yø he., I i -'Ìí.. ~ pl CODt De Hama at 36 6J9-6.Si,~~~l- ei S. ~r ' ~ Me 1... OiQt -,at PlngT~~ EMH' 0l ISIS It fo XRO Cc:· Mr. Da ~ - JtI Powe Coy· Mr. Jii ~ Ra Rive B1 Cove In.· Mr. Teø x. - U.S. Bw of R. XRG Response to RMP 37 - page 112 XRG Response to Rl\P 37 - page 113 aip.MI of .ne. 6eMM ~ Adal P.O. e..614O~.WA""140 0f Al 111S SERVIO Jul 15. 2010 In li N_ to 1'-34 Mr. Co 'I .. W. h.il'C S'. l2Ø...IDl31W..,....'.......... .........,. ".... ....... ",," ...... Ou Nr.ltud: I.... is" lin i; !J ì ¡ 7. I_I SJS 1m Stu (ISIS) re adDl loc gcil'.t1 ..11_ ~ R1IIMlS iw.. ~ Grp Of Id. LL's (XltO) 20W .,. 1' II lin.. ill:Ruæ et re was submtte to Boile Por A_ûirø - 1'is.. s.. (BPA - TS) via th Op Acs Traison Tarff (QATT":i li_. Qm in BPA. 1' OASIS qu. Th study was pe under BPA -TS St ~No IOT-I4625. ,... "'OØ!d Ul08)' tlt wih the apprat discion. If JQIi any .-_.. co ple CO Dey Ha at 36 619-.s~.~d~ ~ Cl E. Mau ~ Me... ~ _giat Planingn.~PlniDi iA...: ~ lI Rao fo x.a Cc:· Mr. Da As -1t Por Coy· Mr. Ji ~ - Ra Ilr¥ Elc Cove, In. · Mr. Tem X- - U.s. Bu of R.ecdamation XRG Response to RMP 37 - page 114 c.., ~XRG Response to RMP 37 - page 115 ..,0:-'-" He i1i "._"2 ...Iii.a..i_" .(â.........)_111~i .ig 11111.... ."III .. .1.1111.ll1lIUf. III- 0... . '" _~i.1...-''a ¡¡..MJ:t".,_",'"J_On, ¡11l~lØ liz i .. .. II lItnilíli.'..... ll .'.01_ i. suit wi ".,.nl.,11111 . II Mlrlt HilI' "CJlIll.)I') .. '.flt . .i ii JlII.II.. 11 ,. II ii l. ... .'iíi .. flu Tt liEi II f'... . o,ÌI. tt _"IFlih ...... . -."thiU 11,1'1. III ., Ml' .,I~.8 II&\* i _ N1lJl L .1 n i Gf luii .0 "0 C l . (Gr, if. iJ, in DI) f);' ;,' ....".Ji' ';.:' ,', ' ,i)',i"','-,,-,: .,:f'\:f. '_..._"_".." ,..' ,,'C,._ '" ",,:,,~1'Ma _J _ If!!!-r!Ir !f ... He' Q'.~.""4"'.rl,I'I_ cUeIiIlBIJI. '-J...hl .. -'.ldlUli:,J iI~I'~ol_'"~"'Ii..M At -.: It Zi: -3(ti .1.-.1 II..." _un '.u.,. .ltW .31.9\' ~ 1lirr ê1o' Dllurt.!.. 1ìlh,li_~: ,,,) 33'''''''1 h. Ui,: III.Ul." LJ,...:Od.hl~.. XRG Response to RMP 37 - page 116 80neviric Po'W Admin.-ÌO Ope Ace Trasmissn Tanff fax: (""'.....,i' OSr.--" tt E..h(ail Ad: OVd .......lA p'!... Alternive c__~ (if...... Iè llì'" ellÎiIll!$ i Co Na:Ï1 î'Ar"',":'(fl~;: iltltr jf:it~dl.idd.dJ-\~.t~:d Titl: Add:-'1+.':: ft't':::'._ Tel (Day):Tel (E-_£.Â~Fax: Appea.to: ~r_.._Il. "_C.,......~.W ,. it. .. rf capaity adition to exisng failit, plea deiB: ~ d wm.~G&11..,..___Cl...l.n. Net Meten¡ Yes _ No XTo Suly Pow to th i~io Cus Yè$ _No X To Suly Powe to Ot? Yes L No ~ P6r"'lW_åll~wid_lsil~~.~.lllll1lrJ'llÎult-m(.,.Facility will intei pr: (Locl Ele Seic Pr)~__',"_:___.; _ __-~-_;__: ,', .--.,._ _ ,"i. ,__,,:_:_~p,,+;,:~x j;"(lìl1i 11 Åe ~ £*To be ~v~ by ~ l~Of CUSer ifli tø....~ ¡s..."th TralO Pr) '., ¡ . " Coo Na:'l--,'-','u. j;'djL- Tide: Adi::-';::,(-Í;~f;i::W¥f------ ; *1 t~ Tele (Da):.'D1l1I (J ?!IT. ..' . i 'rFax: E-.~ Requeed Poin ofi~:.!r Jt 1.11!7 i tÎ l". ......' Issd by: ElUot Mainzer Issue on: Oe 3, 200 XRG Response to RMP37 - page i i 7 1W .~"'Nø)14 '1,.111'1...'11.;1...,011......_. ~~at!!" Atft ...'111 ¡ iin 1111.,.11.... .. blJ n:_!I .... ;:"' _~Tft(l&q~.._...._,.._..... ....i_.,.Qlt~.. _Ø8TW'_Ji'ii.'. _PV 1J....llL irm_...nøn J ,I. 14. "hlUIJIl.,.nll._l.lmll.ii. tW~'I:id _SlTur~Ql.iIø 0...._1'. lVAI J i _líini('uIUIi.,..o..i.Lø:tw (i uin.._1I~~L_Øf~ lit.leIlII.I.JJII..O'diBII.I.. ao,.kW o. .ln .. ". UllJIl.).._.li."..'M..1IiIJ( ,~Nii,hr:Gti' I.'.. lQ.~ "_...laWf: (1..).,-....'liaWA;(I--)(WiR) ~...(W~ ri ... I1I _tii 1111 ¡ '... ..,......1111.1'1W'ie -".0... ... ..l.t..... '_. ~.. ........ ....il_..iI . be...... ¡iiii_iintel~ l!~iilt, .1' .. íli'mlUJL .. ~ .."' _$iiø ~1l" blP'.. l_.ililU..Il~.)'u Ii1Iii (ill ti... I All _......."illS.. e, lpluilter~ It.WAUiir..'__rt:iI'.Ii..,.... r lU.... ..,h.n eM__ "'111. tii.in Ii .-. i1ii1 'li _ .,..11 inni. .11..) u. li "lIb. II 1.1 Min. .11'.;.Iim 1.._...'_ .. 1i..0ro..lllli.'t" i..'r &llkN,'JI'. 1...: OGe.'lr)." XRG Response to RMP 37 - page 118 Bonnevile Power Admnisio Open Access Traissio Tariff .....:_m Sta-i.p reui~:;:."-,.e.. Sm12r m ,hl!*Qin; ;"enJd..Î~IJirei'ìt RPM Fre: ("') Netr Oroueia Re (If AplaW Sy~Ql~ OiteètAxisS~~~; PilI.OiréAxisl'~..~X'.jl: P.lJ.Dntl\Sdí:.~ r.. P'.O.NegS.....~ X~; P.U.Ze$eueR. Xc: P.U. KVABa: Field Volts; Field Ampe: lndue Ge: Mot Po (kW);ibor K (H Time Ce): Ro Res RrSta Resis Ib:Stor Rea Xi:Ro Re Xr Mazi Rea Xm: Sho Circui R., V:Exciti Cur:Temtur Ri Fl' SizDe Le Reave Po Reqire 1ft Vn (No Lo):Reave Po a..re hi Vai (ful LoTOl ~ In H: PwUù.kVA'"Not: P ~llte."iljl",""1I mii..illi".de if ir is ~ (4ci. QM II $ Qi ii 1i...O . , __Pr..._..........,..............scU_(P)...~~ tb~ ~ be reui ."ål,liälde--A ~øfth r.mlfl\ . _n£7II'IiI..n ...'m81Inll1 Iss by: Elfioi Mai Iss on: Octob 3~ 20 XRG Response to RMP 37 ~ page 119 .. ;I." r 111M1'11... its. "'iì 0r si No 3'" ...... I. .1'..'.....IiUiJ1 1__"" øfa: ii m il...? _Yes_* .......nllluIlE.ir"...Iu....a...Uw" _Y__~ 11111 i' II_Aid iÎ.1 It . id Grill 9l 11 1ft _~lJ..'I¡ 'glUt. .-ølnt _..~TRnlll..n'1l...ne .. tVAS..:kVA JJi 1fT -_SUnl.!." 1111 uuConoin Qt~i. (Ain. 11..". _r f ! 11.1f..1111 13 Ne an T-. C.. ~ Cu) Nan ..'11.1)Si ~ 1711 i1 Ifill.. Qirr itlpillri a.' 7)a) Uii .311-=La_tlt Pi': URI i 131£.8. I fi IItlL ..111 rt'rl: -;";'J' ::..11...111. U.et"IIUilU:1S -J,lIllllil,lllirsii._III..WJ Øpl¡I1I.....: TrSp (Cy): "'''lUillllll ~-Maø= i..' t\.'d,ll.tø(::'.::"-.J ..J 2. 3. 4. !. 6. If. Iin.mll.ill?U tlllllIJr_"". lIlliliil'l G,.WI. ~Ot) ...,= IlJiUII,ilu ...: o,.....J.... XRG Response to RMP 37 - page 120 Bollle Po Admin Op Acce Trais Tarff ..."...", ~Ma~8I)i~..:~~.Kø~,..~ TyTy:T):l":1".: MaurMaurManurr: Manuurr:Mantàr: Cui1'~oøtW..~; (Enloe Cop ofM~ ExtaiQ an RaCQ~o.) Ma&curr: Type:AeJJiqOa ~laC\! II rilla:_ Manmeturr: Type:~~ Pw-yw'.i5lliirrii: P9t ¡...Qa t.A. ' '".:~ TyJl:~ Cl: _ Jl ..OCJI J. Iii ...; Manfár: Type: fd Ii," 5Ttr Enlo co. of sit elec on1_ diq_ *- !bFltìlit~ cur._ po~_diå~ rr be~-"".Ù) at ~is i__th SO.kW. EsOåli ~._~ Ae Cl _ 'h, iad ~ÇØIl ... .... Enc ~ of an site docriJlri .. ma ia th ~~ ~ of"" . i.. S-øu Gerain faclity (y USG ~ ma or ot~ or~Ei""). Pro kø ofpr iI.. ~ ~~jf. . _aiInterecon Cusoms ad) "li ..,... ..~. .. . Enlo co of an site ~ ti de an ci ilco scem. Is Avala ~ ~ Yet.-.~........"~.~eeof~""iDfw.apN1f"_~_".._~.i..poi1 .ui~R ~~(lll ~).Are~tic Dr ~ _Yes _No MirøillU1n =....~. ~.~~=.::..L-~~............. ....:=.. ...-..........-..................~.:.................................'..1 .".1"forirtt~C~; . . . ~....__~t!.. Issued by: EUiot.MåIss 00: ~. 3.2. L'" 1l.M¡ XRG Response to RM 37 - page 121 ..0r.. Ne m ._._. 1I1.lith.__.: " ....,. U jJ I. .11. (lap, 1 1 I.... ..) I1IØ Ili..' Ci . lil aoi .11'1' . . l MUlti "'iliin....... ".a_i luMil1t "."'''''11 It 91... Al I... Bllllniø.lfeUnl IIH'. nil . .Pel Ai,..I"r'."CH fi i.jiIIlIIfJ.nI.PI IIi 11*........ I 16.1i1...ei..'Sl"'..~,....orli&etb 'f_, i 11."aU... n...: 'O'. 11 n ,... IJII. fl .1111 1ft "fi._ i at ItI..uid...øfl1UUl... ........ 11'.11"'. iia i.., tU. l,.~lE'..,~1 IIWP" ,0 !II III (¡ If...--.-i l.. he ....D!.." c ,øw,y.t. C:i ..1..11.' ái....C II .,1 IkiUM... ",.i.lles, '. '3 iiii.... Zi Fcøi"'.Luld iii. i fimiitøiv.! AI"', It.. is.1 Tel_lila, _,,~ 'ld s"'~l"')ui.,C\I -=Jli."".;-~"n:-~-'--"tiIJt"fJ~ XRG Response to RMP 37 - page 122 Boe Po Adi~. Op Accss Traiss Tarff F.t,...~'i\ ..--',. E-Mail A4: t"" ".... . ..,~ A1tveee..ltl*,(iØl."._."11 m p.. a..ill CoáØNin:I III . .WLJi È' "fl" TItl: Add:.lnfJ! , 'J(j .'f__~ Tele (D):T~æw..~A~fax:'u AppI~Ùõfé ~.."U, .I"'~... i,.. ,_e...i...i r'i.....mi.i.. If~it ad.it to exilÛ faUit. pl deib: ;'"r'~; wm....QuII rt..Pa............1 l if Ne~yes_Nø~Tøkpy~totht~~y._. "To ~yPOWto.Ot Yes L No _ Ni'..~liêl....) ..........._ilrliJI.I.(lln,l... Faclit wiJ ~ pt; (Lø E1e se Prvi) ~__~rì'¡ (*To be prde by th in Cus i(th .. .. _.- ~ ......th T~ Prvid)~ TItl Add _A __._4._*,;-,,~y----- -,æ '-X"' Telep.~'Ml 11..'0. &ll~ h~ Fax: ReaP9tofl~: N'" ..NI:. ""4': 1& Iss by: Ellio Mai Iss on: Octo 3, 20 XRG Response to RMP 37 - page 123 ~"'_)14 'III l ì'il ...1.1 J ul\1l 1111... .",.0. _5 TEl "' . ....... II I Uti. RiJli. Iii'._.. ii"" ---.._--...T".(....~):_......".JII'.~ . ... .l""..~.. _(; 1'_-J.rlPliø _pv _Sl Tur....I .,.,, II..)l' _-'ili II us IS Wut_ _ ~ G!I 'tir., MI.. 'Tif. ~MD kW('1l 0 II'..'U) IIdIW_ i..ui 11"'111'13\111111.01:111. .ir'li 1A:k........ .11'.) .....¡.I_tnIU. .. dE lilt. 1111_1i") iui.' "ilA .ill: il.. leW .. Ulbil '-lIiie ill... ) -'' lIflIDrlii, ._....D... ......".. .. .W: (I .or.Wk(8 ~(W1)(W) l . niMH'1 11.11 Ii: .'''..11....~l'l...till i: ~Mi i'll -.,.U... ...lii ',rpl."i 11 11111111 ..1111" l"" II.. Ii''':. _8è'-~__ _.., In i ri 11111.. .i.il .... liiii....(l.. "' LiaUlfr Ii Q ." ..¡a"'*.a'lihl1l1llpli..ersoMI Ni.iDlIl;'....III._..SIJI..... dtIJlUlilll.".I.....l1ftlli ur.-uti.11'1.. ....I.fJ'...ir 1 fnllr "ill Jl' iid .ir.)UIl.il.r.'lal..i.lI1Int .... 1._.""_ Jl.ii.a........¡ b . g'fi II.. ".M'..-.~af_ XRG Response to RMP 37 - page 124 BoMvillePo.~tin Op Acc Traisio Tarff .....".. $ta-up rciuirets: Sg CPS '. tWin", AR. 21 '* OBle" £1'1 . ... ' RPM Frenoy:(*) Neural Gro Reist (I ~.$ Syncngy GtII. J)ilee ~il Syi~ ~~ ld: OiAxis T...~~X.it: Dire Axis Sûa 1....1 U. X' ..Negve.~ Rell Xi: Ze Seue ..lnltie, Xo KVABa: Fied Volts: Field Ampe: p.u, P.u. P.U. P.U. P.U. Indye Oc: Motng Po (kW):Ilt or K (H Ti CoRotr Res Rr Sta Res, RsSta Rea Xs:Rot~Xr:~et R. Xm:Sh Circ Ra Xc: Ex.cbing Cur:Temur Ri: PnJ SizDeig Le Reave Pow Ilre &t Var (N Lo:Reave PG Rc m V1I(FuI LM:Tot Rotng Inert H: Po UlÙ Ol tVA - No: P1se ~ 1h T..if ~ pr. ..... biu e..... 811.-dein if__W ~8h lsJ1 ' ~._Qs,.neiil¥ t .9 F ...QI Prov lJ __ '" _'ul "stliz ) .~ widii:~ be re bt.-lillst "-..th mu,,"'~ ..7 #S"tr'W"lI,. tn' Issue by: Ellio MaiIss on: Oc ~ 208 XRG Response to RMP 37 .. page 125 tiill ,.tr arsi No. 316 Wiii.ii. ¡11.I.Uiii...llmluiill ..._ of.. ØlluoaplJl _ Ves_N& ... .. . ., ,.,.,.1 111.1 QlIII&1l _Ye_* 111111'11...'.:...' .f'.1'..' 111'111111 ii \ .....1'.1 .. "I'_ii _dN"'1h . d II Ii ,ii". . . ". tVA. ø.$i kVA. _W'J.~., ili." tlr.' 1. ¡Ii II........IL..II UII r Owi., QlI,I'.); (1._""' i U Iii iø:"Militli..Ne_TømC__~Cll IiIi ...1 .£,Tf ~Sl: filiI I 'I..... .IIP' .iiia.tl't tliiii til 1 1; ¡"-.." "',., ¡¡r ;qpiì=.1'riSp (C~ . i' TUIi11,"III.r~.11IØfft.;fiDl:t ;Ji i.""..ti.J'II..l1.' "......PI1L., 11'1"'11I....SS.1I.: _,f.ftli.l.Ml I 8.M__.. 1. 2.,4 Æ, " 4 3. 4.xx ~~¥; s. 6. 1f111l 11 II. It ,I I. (I .1I11........ul,... OiJliii"Cs 'I mllli.~) ..... ..,u.... __ -= Giut., i, in I. XRG Response to RMP 37 - page 126 BOfviUe Po Admiritioø Op Acce Traision Tarff .. '....mNIl ""!P Typ: Type:Typ:T~.T,.: MafaMarMafaMafaWatà QaT~rw(tt_8b)¡ (Enlos Cop of~s Exitaan Ra~~) Manfatu Type:~cia§.. _ ~IlC Jiliih_ Manfa Type:~.et. ¡¡ií~ Pg! r... ,. MAI'It fla)~: Typ:Ae Cl Pc.- RdO..¡¡:_ Maufa Typ:~ Cl _ i.;III......liliIBt_ QI. I'li Ene co of site eI oø .. sh"Facilit eqpm ooaR ~ ~- diagr mus be sip an st by a lie.sid PNi ili_ Es:i¡ llf ¡ris la th 5l two Is ()Uf Di &io . i il _v._* En_GOefan sido. U ItUlid*in ius ___"-iih .dl....Of.I),I,,'I..tìl aeng Faclity (Y USS to II or ot .._ ..... n. 1'11l PfOløef~Ye ~l~~ad) lI Enclo.co ofaa si ~ tI ~__l$..ìI"Qf.""'-coli~ lsA~~hèløs;,~ __¥.~ ".ii.fiiii_ Bn coof sd... i. all ~__Mli_ ...... oin I Jt..m....po ci .. ~ åN (i",. iØilAre Sc Dfng En _Yes LNG;_..u Iss by: Ellot MaIss 01: Oe 3. 20 XRG Response to RMP 37 -- page 127~- FI:8e: To:1J:AllR: Co M . TPC TPP-4 fargo) Mo, 02 201011:51 AMConSPA's. Bu Pr SGI Bu Pra.p Hi Coll PaUl Fieder inormed me tht you needed a copy of BPA's Sma Generator Interconnection Business Prctce. I've attached a copy for your reference. Please let me know if you have any questions. Tb, Ana 1 XRG Response to RMP 37 - page 128 XRG Response tö RMP 37 -. page 129 Co !f Fr:le Tø: OcluiÐt H8 1.. TP- TP-4 fJpJW~. Au 04.2009:2 MACo RuliDe - TP..-3RE: Co in. HlOøn,rm bi ... bI 00 .. to tw wø. For th Mi PH tr l.. Hl. 2O~1, X 2( Du,ca yo pr . co fo Ra AN El COP? Thaks Best Reards,Jams Leonard HallCustomr service Engineering Bonneville Power Adnistration Work phone: 360-619-6057 cell phone: 360-609-0319 Seeretary: 360-619-6075FAX: 360-619-6070(PleaSie leave a voice mail on my work phone that you have sent a FAX.) Mail Stop: TPC-'lP-4 b8il : jlballØb¡.. 9AV Post Office Adess:PO Box 61409, TPC-TPP-4 Vanc.o"!vet', WA 98666-1409 UPS and FEDEX DeliverieS: 7500 N.E. 41st Street, Suite 130 Vancouver, WA 98662-7905 Pn: Ql R1 £r..~c.J Si T\S, Jú 27, 2Øl0 2:05 PM1'0: lll- TP-TPCc Ha - TP-3S'lIeat Cc in Jame. f)ø yo hl. ~ mf. for th. 5v~ of RèCllatidii (for thé Minidoka PH) and Raft River 61eçtric Cô-Qp (ReratingMiAid~idlin)? l wQUgtut äpecate it Repds 1 XRG Response to RMP 37 - page 130 ~COnnR~ Leac p"ojec! Engineer 802 'N BannocK. '2th Floor Bose. 1083702 Office 208.336.9793 ,S",;! _.r.- 'J¡1 öym)ßpi'iCn;$ 2 XRG Response to RMP 37 - page 131-- M-TPTP-4,-'_08, RE: ,... fo Se Pa (SPA) Fr:le: To:SU Hi CøJU Plea.sesend the Ageeent to tbe Vancouver address listed on the cover letter. lm not sure what 'Would happe to ìt in Calforna. ;-) The Äleeent forGO:l88 was maied yesteray or wi be maied today. Erc Taylor's personal assistant notified me yesterday that the Ageement has been reviewed and they Wi be sendi it shortly. Than,Al ..: Ql R. Dr.vn...As a~Ji.a: ~, . .,1910 1:36 AMT_ 0i M - -TP....ut: Ri Ad fo Se Pa (eP) Thar An".. Do you Wlntjlst th chek set there, or both the check and the a¡r"mel1t? ÁJ.~~/ Â.,COllin Ru Leac Proec Eh\1¡n~r a02W Bånnock. 12th FÌCiot Boise. to 83702 Ofce: 208.33.9793 'l'e are OR O"'~ER\Y;S;:P~C;TEcrED BY lA5N l:ie-1dea-te-C:pierH. i;r or c: tN'S cC$"fm';.;1:Ca\,on '$ ~t YO,,: .1$ by "'~"~""''.''''':.'~''..''.''~'''_~__'~_'''_''~~''_'''~''''';'_''"'''''__~''_'''__~'" ,"=.,'w ,~p",...:__._.,~_,.._'".e~'.._."",__," '_'''"''_''"''";'':'''~''~':''~'';''_':~'~..''':''...::'_';.,:",_".,~.:.,...." ,,-- Co,A M - TP-TP 'i'IItXr".vu,lQJ I.it 5enl 07, 2010 llh AMTe CoSUId: Ad fo se Pa (S) Go moni, 1 XRG Response to RMP 37 -- page 132 Below is the address for sending study deposit checks to BPA. Payment.lS acknowledged unti it reachs the BFA lockbox so by Sêig th chec 0 the address below wi save us the step of sec: it if we wer to receive it here. Bonnevie Power Admstration P.O. Box 301507 Los Angeles, CA 90030- i 507 If you have any questions, feel free to cal me. Thans, Ana 2 XRG Response to RlP 37 -- page 133~J!Fl:Se To: SUect Co M . TPC TP-4 (ac:go) ~ 23 201012:67 PMCoRE:~it Hi CoUWe ~ both the Agtan payment. Th for ched!An ,,~ c- JW £mm..ØIPJitJ Si 1l, Setb 23, 201.0 10:32 AM Te Co,A M - TP-TP SUJiet ~it Anna. Wll'ted t~ ~~~ yo hareceì~aJ th nec~ry COlpoLs of thBonaza Bar Ageet. Th. ,.ÁÁ"Con Ru Lead Pro¡&Ct Engineer 802 W BannocK. 12t Floo~ 80se. ;1. Ofce: 208336.9793 w~i;ii 'ytoJi:je;~", 1 XRG Response to RM 37 -- page 134 XRG Response to RMP 37 -- page 135 ~!I'P Fr:8e: To: Cc Ha,J L - TP TP-4 fjgo) 07, 26102".3 PMV - TP-3Co Rudeen; HaDe - TP-uPP-3FW: GO, io Ba, re fo mícMl Ri - Ma Co, Yes Dey ne th SPA to nu ~ yo innd to inernn. An.Pl ad.ThJa Fr: CL Ru rQ);~CQl ....: Tue, oeab 07, 2010 1:28 PM Toe tl L -lP'fSlIiii ~ G0, Bo Ba, re fo rn ls tht a nube th is on the le of ea towe in the transis line? I don't have on at th moment. wm th.at be &lnt for ITktav? It do né apper tht there are any SPA license micrOWve beams that ..in th prje are of ~tr8..r Pek or Boanza Bêr. Colin Rud Lead Project Engineer 002 W Bannock. 12t FiÖQr Boise, ia 83702 Ofce: 208.336.9793 "l'S ~~ or¡i'l1ted ØoUlll1n; COti'ns inlormllf¡on wlilèh illì may be LEC.. Y P¡;¡V~i.EGêr: :N NA"iJ"lF' "Ii" OTHEqWlSE "R!""E:"'ED BY "ROM Ol$CLOSURE. lI ìoj :i ¡"'90Ø Ql'y fOr m. \Jil Of lMè Add~($; nam a:iovli. il .;¡¡ "iiioer c! ~.s ".,,,~,oOê.s "C' ,i,"! ,r;¡e"cll reciper.¡. 0' ¡hi' ~t :è$ns~'!t?d9errt~? ~.~ ;\'ne~rt'~Qrn;,YOUlr~i~tebY~Qtfied rrBtany d:sse.m¡t~gHcr,. ti't:r;i";.il'gti O~ ccpyi-~gofl..¡S ccm;"rwPfc:aiiOtl halì (eead thi tol1~1c~iio\' ,n !lmir ;ieU& '''mlla~_y t\!ify A by :e'epr.ne. an.:) "il":'" :r~ -~r.¡¡'''~ :71euaoe 'C' ,,$ et ¡r,e 'If"n,,,, ""i:i.. F.1C'riss ....: Ha L - TP- Tf £DJ:jh,goJ Sl 1', De 07, 2010 2~i6 PM..Co~ lI PW: G039 Bó Ba, re fo ming Con. Ca yO .~th~fOl th wi tu, an th SPA to number? ThaksJaes 1 XRG Response to RMP 37 -- page 136 XRG Response to RMP 37 -- page 137..Fr:le:re:0..~Ha L - TP TP-. fJOt .-1 _ 2010 12: PM K- TS-TP-2-e ..,Du L -llJD FAL Co.11h En it )f lD of 08-' fo a Whi 11i11niTh .Ja .. QI fl (ßl S8 11, ~ 09, 2010 8:54 AM,.. - 11-'l le Pe (G38) co) .l ..., YQ th. rf pe to Il ab whln teqe? We'te loldto go fr fo of ot~.. yOr $Vet to th 'Br sun. Co Ru Pro Ení'r Bano 12t Floo Bose, 1083702 Of: 208,3315.979 This t\onîeN l'l1ed doen: 00l$f",s ¡nlOrrltOt wli illl may bl LEGAlLY PR1V:Lt:GEO, PROPRiËTARv l.'l NATURe, o¡ OTRWiSE PiiTECTIm BY LAWFAO l:1N w.¡ is ~ ony Ic ~ lJCl t/ ~$) I\ll"", It il rer O! this ~ 1$ rot lh iri~ ~, or ~ ~ or ~ l'1llo~lT1C 1M :~ I'piei. ~ iw iill r.OlI!t that iiro cluelr\lllicn, tbir.c or eo/lng of !hia commw'lca'ro!' it sir ¡:br, It yo,:"'eve lecveG t!is comunicatin.n 'tUOl, ::í_ ,mir.ete.y ooify Cl by (éii;e, ano ¡etur- :he ot;ç.r.j rnesa!.!l to ". at t~ aoove l!!l:: ad:$S Than Yl''. ..: lt~ L - "ß.... (ina_. goJ....tIS.§.~.,__ ..Tc oa Rl Qi IiDe - "fJ; Re~ V - TP3; Re/Pa A - TP-TP; Gl/Du L - TP-IÐFAIIII i * RE: 8l Pe (Ci) '~_~'~'_"';''''''~.''_'~'-'~'~~~'~';~.._''''''.'''_..,..,~.,.,., ,",_".~,,,,_,,,,,,~,,,,,,,_,,_~o,,-=_,,~,,,~,,.,___~,,,,,~~~,,,,",-.'-,...,,";..~...-.-"". COn, ,. ~'1." of 1t$(. in ..to a ch in th repont of lnter, It.. "maybed8 awi$W an re ~ of a ne ln re. e..."tN.A....~..rs.~ of ti is, oh.th PO ff BPA's .kl SU at 115kV tÐAl...~ ""..84.$ Wirwin Wi Of th or intell:on¡'l l"t and re a neinie ~. Exs cl. in th PO is to ~ tOaI BPAtÐ co stng un th~l' Th.. i XRG Response to RMP 37 -- page 138 Fr: Colin Ruc (ma:~l se Wedneay, De 08, 2010 3:46 PM To; Coin Ru; HaU,Jme L - TP-TPce HaÐebY - TP3;Re,A V - TP3; Aè,P A...~l'-4; .GI,t.l ..1"... IDA FAL SURE: Ba Pe (G038) J~mesJ just chèCking back in for clarification. Your email beow SOun lik to Întnc .,Rift ~í~".~. ldahome Substaticm, we would have to start over with a new queue poition in th studpl. Thlts not ~weid talked abQut before, so I wasn't sure. Please adise, Rflsrds, "L Colln Rud L.eao Proiect Engineer- 802 W Bannock. 12th Floo 80M. 10 83702 O~¡ce: 208.336.9793 '\- '..\'~l.~' e~' ci9 '. O:B .i~;:\:;:~:~.",(-, " ,_ C::~:' "rh'S 'a 17...; be i.GA!LY ?R!ViL£.ÙE.C PAQPRTAlWlN NATlIE.oiaO'fHER'WISi Pi'TlPI1'iLAAW'~(s; r.llr:ed l!t!!. it t~. r1!t of lI ~ Ì$ Of "t~O'e~'. ~Oc !l,e'e, ..-Iy nGtJ'8 :ra: any tiir:ri¡,.iri. di~ieP. or ~ng øt il'.i oomi:~ l$ $Y4l)' . ;1 yo;;C'~¿~ü ~."eç,¡.:ú r "0:.',' ,.5 t:: :'HIi;1\':nl. ¡¡I'd 'aí:." ;teOllgina¡~T(Ula!me$lveem~ ~ fro: Coin Ru Se MO, Pe 06, 2010 9:51 AMtø: 'Ha,Jl- lP-lP'CcHaQe - TP-Q3;Ræ,A V - TP3;Fi,P A- *""~ì~.i. .."'.. IOAHFAl ~ RE: Ba Pek (G038) James, just to be clear, you're talking about an ADDITIONAL intercone reue.. no wWWi 0UC4N. qu number and starting over? ).Colln Rude i.ead802 W Fioor Seìlse. iD 83702 Office: 2ùB.336.9ì93 :r;emmur"\çi¡tr.:w:err:;:r .pt¡;a$ü l; ~;r~t!e '..1S by :;etepl"io~e, Fr: HaI,J.ameL -TP"~~ma:jI~go) se Fry, De 03, 2010 12:13 PM To: Colin Ru Ce: HamaDey - TPP-o3; Re,A V - TP3' Fi,P A -lP..1'' Gt,D L -~'"IDA FAl ' . ., ~. RE: Ba ~ (G038) 2 XRG Response to RMP 37 -- page 139 Co. YOl go~fr SPA lith eM be th a nu of ph co' ~ thcoC) in.of.~'" 1 ø 2 in yo ém be of1', OC 01, .2010 10:22 AM c: ~. yo it 1) be. (W. NOT pl ør~igà'th ~.Na) SPA hBbe re th vd of yo ~ re ìn li of ~ 1.4 ofth selP (_be). If .. hM ~. it ha "be d8 th yo in po of ~ . (PO) IS on a Ad..Aiow MC. of 34.5 kV ~ li Wh Is. co ba to SPA's Idme Su.._CC? If y". it ~_.,..-. ge insne rè is reqre fo thi pr. You or..~..to ~ at.JdSu at 115 kV. A PQ ør Ra RM$ 84.5kV ~ li.. re. di $yi rn an st.ld....l'........~..._doth ha..~_ on th ~.oftt... WI no." ~....tO..CI.tmme (t... viUDAR -l.~ Ar Fl). ,...... to Wh ~.~ ~ po of inne is.,. Be.t Regards,Jemes Leonard HallCusto:i Service Bnqin...3.l! Bonnville Power Adnis'tration Work phone: 360-619-6051 Cell phone: 360-609-0319 Secretary: 360-619-6015FAX: 360-619-6070 (Please leave.. voice mail on my work phone tJit you have sent a FAX.) Mail Stop: 'r-TPP-4 Emil: 1J¡¡IlJIM.QQ Post Of!1i: Addess:PO ~~. 6.1409, TPC-TPP-4 VaneotÌver, ¡fA 98666-1409 UJS and FlttJEXDé1iveries: 7500 N.E. 41st Street, Suite 130 vaneouver, WA. 9$662-7905 SM GERATO1~.1l0U (SGP) 1.4M..9f.~~Ai~to~ d8 oréqipnt coiOn or to th it'l1 site of th small ~f~no...to;nwrli th Tramision Proder and th lntrconnecon CU$r maybe déå~l.oftn~nen Reque and may require submis of a ne Interconnec 3 XRG Response to RMP 37 -- page 140 Request, unle prper noifçaionofeach Part by th othr and a renal;letiii to cure th prob created by the changes are undertken. Fr: Coli Ru (mail;cr~col se Th, oc 01, 2010 10:22 AM To: Ha,J L - TP TP-4CC: Hamay- TP3 Su Ba Pek (G038) James. Not sure jf I've had a chance to talk with you about this previousl. but l'vegQttw qQetins.fC) you Q".our.~ Peak project. 1) We are planning on interconneing the projec on a Raft River 34 kV li th go th th pr lw about 2 or 3 miles east of the Idaho me Sutation. We are NOT plningon inwGOectingat th lda Substation. What imps will this change have? Metering. intering with Raft River. stud of th 2lo 3 mi~ section of line? 2) The System Impact Study Report on the proje mentions reratng th Minidoka - Bridge line be th Minidoka and Idahe Substations.l-owever, I-eber Carpter at Raf River tho that th ~on QÍ line had been rated pretty recently. Is tht true? What are the chances that we wil no be ab. to rerate th li after studying it with lidar? Thanks for your time. Feel fre to give me a call if you've got aditionl quesiotoR1. ..Colln RUd ;"ead 2lh F:oor 8oise, iD :JOG,;~,e:' ccma,cs ;ntermat;c;, ",~;ch ia may be LEGALLY PR1VILEOED, PROPRieTARY IN N,t"!, OR O'.I"ROTi:Cl'eø$Vt;W ,;:,srt=.'òSd or,¡ ;!:' ~s,'s!? 0' '"e A:kHIÜi!tlisi ~arr.e abve. !1 the rtiQe of !h~sa is net tt ¡mende rec¡perii,qtilell'¡:¥O/y"Or :c çiahv", L:v :;'e,'¡e"J'~'C iGC.;¡G,'t, ¡OG are hereey -¡C¡,t¡eó ,r;a ~ G5i;ein,'lati. dt$'.tilUliOl 1)1 cong C1llhis ooml'Vf"Jç~ ll ~~ii~ed. íf .~~ cr,,,;;",.,'.,_,,, "". ,v:cr. 9',."",.m'"eo;a:~j ,-.c:.i¡ ,.'1 ':i ''''W1ic''. a."t retr::t ::gina ~ ti us.a, trce aoo'.. email ~.. ~JI~, 4 XRG Response to RMP 37 - page 141~!J Fr:leto: Cc8u:.711111.._: Tay,Er K - TSE- TPP-2 (ekgo) Fri, De 10, 20105:0 PMCoAu Ha,Gr A - TS-TP-2; Ten E~Oona L - TS8- TPP-2RE Wh ReNe.p Hi Coin, I.CC'o bo er. ~ an Do Ten Eyc,wh Wil be wo wi Exery on th rec. Craig an Donna $UBPA ~ ~. in ld, an . be th on wong wi foks on geneat and trnsmisio re inílar ,. ~.ui,th fithng)thSX-. mus.do prr to sung a wh re is to Obai a Po-to-ntEna ~ PT agØf"ne in or for cumers to suit tris re. rv at a bUne pr on being a BPA tris cuomer. Pri to iss a PTP Agret, th eu ne. to fisuit so in toBPA, whh is idnti in th buiness praic. Exergy may have already suit $O of th irtwh mak yo internen reqst. Cra, Dona IU i wi wo to to Inre a smoo tritn. Plase le us kno if yo havé any qUétio. tha! Eric l' 0Q Rudeen rßl*,_".~J I8 ll, De 09, 2610 l1:31AM To: T.._ K. lSlP2Mji. Wl Re 'ric we'd lie to ret four wh req - thee for 20 MW eac on the Minidoka - Unity 13 kV tine and on 20 MW on on th Minia - Brige 138 kV line. Thaks, Á )-...).Ooln Ru LeM Project Engineer Bannock, 12th F'oo' 2u8.3369793 10 be LEGAL.L 'f ?R~:'i-LECif_D P?_()?F:~f:"" p,P'" ;\i~,4'rURF- ORc"',-:~;i,V'~;lSF~~BrY~.ErTEc) 8/ ""3meij abovt. t~,e re:¿~~~\:~,~~;~~:i:~;~,~~~~d;: -ct~~!:e :;r t~:~~,~~'i~~:t:~~:~ ,,,q!Ss$age,~o,'j¡ a: F~t e.';i/~ 'o'C,) 1 XRG Response to RMP 37 -- page 142 XRG :Response to RMP 37 - page 143 Cp '!. Fr:Si Tø:SU Co M - TPTP-4~goiWed, De 15, 20108:2 AM0Ð RuG0 Ch Mo Hi Coll, BPA receive your R.lq~st for the Chpin Mountai project and it has been enteredïn the Queueas Reqest No. G05. I wi be contactg you shorty to schedule a scopin meeting" Due to the holiday season, we may need to postPone the. meeti untia!er thef1t .01 the year, but I'll see what I can do. I hope al is wel With you. Take car,. Ana Cosola Bonnevie Power Administration (36) 619-.047 1 XRG Response to RMP 37 -- page 144 XRG Response to RMP 37 -- page 145--PrSì To:ce...A - TS TP-2; Ha,J L - TP 'f;.. TP; Ae V -(hla~M-TP~-4; Hl.Co - The~ A1- .foGO~ Ba) ony. G0 Is dend on th il st an we won't se th .. tI.~th di. Tha Dt Hama Jl Cd lu rmim..'719~æml .lìio.AM3 .. . . ..~ l-lf "f; Co,A M - TP-~; Ml - iw3;Re"oi~V- 3.... III Ri GØ.. De Nø Th. i sup th Ja 1st da is depent on th Ildr stud, as we, rf? 4..;' J-!!Co Ru lea Pro Enginer 80 W Banock, 12th Floo Bose. tD 83702 Of: 208.33.9793 Tlls el.roni Of ¡¡iit1 OOøit CCla1r inf wi íai me be LiAlL Y PRIVILEGeD. PR\PRIET MY IN NAMlS. OA OTHl~lS AATlC18Y LAW FRO oisCLOII. an ib¡ is ¡riieod ony !or m.:/" of the ~S! !1me abve. !l t~e ~r or ~N$ ~ ii not !h ,me'de fCpieli. or me empy"'t;t 9m , it., ti ¡~ _~ ~.. ti~f l' \i an ~ll. -'ÎMiCt lit ocl' of !hs cinin .. $triQy PI'M:il$. 1f yo~nav" . . In... pi ~1'if ll by~. an t1m" OIç'4iaJ ",$9!i ;, ai ~"i ~ ~ail l.l'. 1'.4 yo. òjdfd,r ".r..1 ~ -l'1()3 (Øllpždiinm." 01 S8 1l .. di II 1i.U) U:21 AM TeeQ: ,.¡Z tlll.~i-11-"f; CG.A M -lP1'¡ Ml .. lIiO\ - ffl3;-1J3ali.. '* R£ G0 St oe Nc Th yo, Co. Th lnt Is ec fo us in assessing ne in th Fac St Re. The ne du da fo th FAS is call to be Ja 31 st, 2011. "fJI~ 8Ð Pe AdatTra Pl 1 XRG Response to RMP 37 -- page 146 (36) 619- Fr: COin Rud (fJ:~mml Se~, .~.15t2010 3:12 PMTO: Hamr,De - TP3 . .. .... .. ... ..ce Hard,.Crig A - TS"TP2; Ha,J l- TP-1W; CO M..lP..1J¡ Mûie,t- ~3i Re,A1' V - TP-Q 3~ fU: OO395.stDey NOca Thanks, Debby. Attached are cordinates. I'"e also indude shapfiles, if thats ea. 0038 to folo. Á .k Colln Rud \-sac Project Engineer 802 W 6Rrii1ock, 14b Fioor 8o,se, 10 Office. 208.336.9793 '/,¡\,V/'¡ .í~1l., er9~' '.:e ',/ei~;c!"";e r';:..e:(¡:,:; wrion :a, mai be LEOAL Y ?R!ViLEO£D. 'ct :!"e AóOff!lieeIS¡ ~aill abVè. If in neeby nolflì mat W\)r d!at. nofty ,;s by !e'*?O"e. Iif"Ó relum th¡; 0 ~:.Ham~De - TP3 (ma:~,gp .. ~y, Debe 15, 20102:10 PMTO:co~Cc Hain,O' A - TS-TP2; Ha,J l- TP-TP; Co,A M - TP-'T;~-~~;ReliC,Ane V - TP-o3~ 00395 st De Noca To eXer DeelEm Gro (XRG): This e-mai se as our noon to XR (p Se 4.1 of th sm ~ ~ Pr - SG)th we wi no co the Fa,lies St fo th ge ~n re nu#G,(Ag10TX-146) by De 17, 2010. se 4.1 of th SG st th th Tra Prsh U$~ Eft(uw.1t a1__*-ageed to wi th custer. It al stes that if th Tramisio Prid is un to ~ the ~Feaibit St wiin the tie pe, it shall nofy Intcone Cuer an pr an es ~øawit an expnation of the re why ad timè is re On Novebe 29,2010 Traisn Pla re mic da~lt ..the eo of the fac &uy. BPA wil pr . of 30 Bune Days af th da is re. Ple Cri domEm attac. Thak yo for your atentin to th mater. 1)&¡i;~ Bovie Powe AdminiStratio Transmis Planning (36) 619-68 2 XRG Response to RMP 31- page 147.-..le To: Qe...: Co. I.bebe in1l of~_. nM.th .in yo su. '.Cl ,.tÐlO. ThCr ;) A - ....2; TenEyDo l- TSTP2 27 07:43;38 2610. : "111.. Rø Er (or Cr or Do), Ca'ft8lMif we .. to AJ anymo inf prr to isaPT ~nt, as ment in Eris emai? lb, I-; Wr\Ch iatmay:be LeSALi.YPRíV1LËG€(;, P?O'pa~ETAr\Y INNAT~,iPE, CP OTHEK\~rSEPRö;'f:C"EC SV L;AVl ,Il Of lhe AQ.."(~~ :"\t... ~ve ¡'liS mMsag 'S no: t'e~de eec t:;I!", ;' c'he'"y riOl'ffeØ l~at 1If'l' d"~";b,,'.'cr c' ccpy:"~ cf )"C.. f:"OtiYJS by l&iephor.., and tet~t!~thts or'~i~:ai mH$,age to,;s at ~r;£ ~_'~_."'f""";~~~""'_'","..';";,'_~""""~.',~_,_.,,,","'-"',,,,,,...,."'_.--,._."_,.."'''''_.''._,~"._".._.,_'',_.''_..:_~" ..: ~ilK - iæ-Tf2 ('1Ii:rel go) SI ft, IlM 18, 2Ðltl 5:0 PMT.O!~ ca ~ A - T$'12; Ten ~ L - 'TTP21IIII'.d: RI: 'Mnin __ Hi Co, I CC'd ...Ci ... Qø. Ten iy, wh wiUbe woin wi Exery on th re. Cra an Do.suSPA ~ ~inld. anwibe th on wo wi fOs on ge an trmisio re in th ar 1 XRG Response to RM 37 ~- page 148 . Th beng sa, the first thing that Exer must do prr to suit a wh ~ is to oC a ~ Enaín Agmen. PTP agnl are neessar in or fo ~ 10 Sl ~ r. II I.; rv atthe a bunes pr on being a SPA tranmis cu. Pr tQ it a P1 Ag, tt customer ne to firs submit soe info to SPA, wh is id in th bu pr... Exer ma have 8lre subited some of this info wh making yor interne req. Cra, Donna and i win wo tog to insre a smooth tritn. PlIe us lul JO have an qu, thl Eri Fr: COn Ru (ma:Q3~cgl se Thury, De 09, 2010 11:38 AM To: Tayl,Er K - TS TP-2 SQ: Whing Reue ~ri, we'd like to request four wheling requests - three for 20MW ea on th MW ,. um ia W __\00 20 MW one on th Minidoka - Bridge 138 kV line. . Thaiiks, A Collin Rud i Lead Projec Engineer . 802 W BannocK. 12th Poor Boise. lO 83702 Off,ce: 208336.9ì93 T',$ tl"~J ~?~ r'o:.~,/JS by Hl;&P~\O;~!l, ~and 2 XRG Response to RMP 37 -- page 149__.n Fn:S8: To:....Ali*- HaCrai A - TS- TPP-2 (cgovJT 04, 2011 4;3 PM BPACDFoDo.do Co. A1 itth.CDE fO. Pl cd if yo ha an qu. Th Cra Fr: to Rudeen (OØi(ÂlJ!9"'inieit Salt TIi,.. ,2011 1:18 PM Toi Ii,Qa A - . 2_ad: Traliise Crai l ~ I. ~e.~fi~øut ÇO~ly. I"m a fi.(;C)l'uHd at why we would fill out some information that seems p"j$~ ra. tn. .~ $pécl DC) wereally adess the mor projec specfic stuf. s.uch as how we ~ lo..ari $.e~~~n.t: Traiss Setyiee Ageement? Also, I beieve I need to request from you t/eCl,~ (). ¡ntry _~iit form Tha. J.)0 Collin Rud iead Projet Engineer 802 W Bannoc í2th Floor Boise. iD 83:'C2 Öffice: 208.336 9793 i XRG Response to RiP 37 - page 150 XRG Response to RMP 37 -- page 151.- FN:8I:..:".jiol: . A - TSE TP2 (cft . . ~ 2011 2:.4 PM CO. You.. cøtl th tA.. to .tM.a SPA cu ee a ii sp In so ar an mUC _sp in" æe. On Ex be a ePA cu we ca.ue a S8 AQ and thn ge int Gèat~ ... .. fo ~ se, \o pr an sc th ou of the prje. Th il be. sh. tae yo to th &PA WI Wh COt apic int i$ lVaila. I wi ...... th.in yo.se toy to th ape statBPA to ge tl ror1. Pl ca If yo ... an tl. .. Tha You Cr b&tlfirtisw ØW~f8&f?IOñ167acflPei25fTOKl81 1'.10.".. (Dlrtlr ~mm .. .. 04,20111:10 PM ., ll A - ,.,.2....1'* Trat.li9n ~~ I t~k l ~..~ ~.ou ~ly.rm. .lf. eonfi.$e at wh we would flU out $om, inf()rmtktnt ~$ ~$~rèhth ~ ~i& Do we realy adréS the more pro,;t spife stuf. such as ho we ad.- .~ an .sdiø wi. th Tranfi~n Servic Agreent? Also. I beieve i nee to request from youthe etl~ O'...&n..Aa~ fo.~. CoA.. lead 802 "I Fìc:o.r 60j$e. tD 83702 'Offce: PRtH:~R\ETAAV "'N NATURE OR OTH£RVlt$E, ?A(j'rECTf,w' 9Y i,J1,Vv ',"der (l ë~.S '1$a~ IS ¡ici r~,$ t' -ii$tt~bu~¡ctt C.! C:QPYj~ Of ;8 SiPC';¡y \¡'e: 1 :;,. '~.~,:;:~ ;f:t;r:,t-.-:.~-O ~~ ~,:) d€:,r,.;:"," ~¡'Æt;::;'-;g-j''l-l;' 2 XRG Response to RMP 37 - page 152 HZ' Lt$. at tnliiDO'.'-$ fir,a.' àdØrusS, Ti¡ankiúi,, XRG Response to RMP 37 -- page 153-- to Br Fr:SM To: ""I. it. Con, Th st .. BPA ma_ bepø wi be on th exisng 138 kV line that BPA ow and opte arnd th Bty ar on. on. th ou of yo ~. pr ..th BPA 138kV Pont to Pont loo at Mini or Adai yo wi be do.. ~ ~ wi ~Pow. Th$ ow an ope th 138 kV line tN nms ft Ad toAm FaI f1 ~ in th ld Po Bang Area Au. SPA is not a Bang Area Auhori In thisre. So .11.... th ~ wi ,. to oo..1d Pow to ar fottris wt .se und ldPo. Td.1' l$ a ..yto ge... as YQ. st us Id PowS fait, bi th ava of tr ca on ld Po$ fai$ a ds that Exery ne to ha wl Idao Powr as atrmi pr. I hi. pr yO Wi sø.CQ in be at Id Po Trais to init yo whdllI Ro. _..20.... Key lQ.. ..5116 Th. Cn ..: QA Rléi løi.U'..'..'imgiJ SI We t u1. it ~ OS, 2011 3:17 PM T. Hi A -'S!:rP-2....1* WIn" m 8r Ct. At ~.~ WèN~._~ ~ .prøj LoBra. Oue øf acually døìnthé wlwns~. do you knîf ths a de ~lY tOF the? lkl" there may not be capa.eit or willineu e~n$e i.ades .. ~ rm.i~tøk1\ ifth.pe is the. Tba Co Ru lead Prot EngiM&f 802 W Bano, 12t ROO Bose. ID 83702 Ofe: 20.336.9793 Tri$~oiiíç QI pfn-~ dom1J coll¡l'~ ,~omi~ whic (.¡ may 00 LiGALL Y ?RIVii.GED PRCt'r¡IETA¡:W IN N,lojJi:E O?FRO OI$Ci.OSUmi, l! rbì ;$ ¡~ My jet the i,Stl ol:~ Adr(_(s) nam Ibvt. i! ¡h$ feiide, 01 ll¡jt ~¡¡ io óe~r lt to :i ;l'lloo l'plélt, yo are t~cOO'f '\of,~.o :h any g,$$fli''d"a,icri. dit~~b..,:;c.'" i ¡"f:;,..t r-ece:'teo j'\ 'ß'!'or.,.'$ by :& eprct~. at~ t~Lirr' iha i XRG Response to RMP 37 - page 154 WoIl tma, Etdiu,Trnk.)', XRG Response to RMP 37 - page 155c.D! Fr$l TO:..1.MII.IIIRII: Ha,Cr A - TSTP,2 (~gov) Tl~Ja06, 2011 2~42 PMCo RuSPA le Fl Trais As Plni.Tra As M8 Plan.p Co A~.~ isá...fR.~v ,J, ~ SPA Vic Prde ofPl;mii an Ast~ ~lQ...se ~ ~ SPA an ìl et win be fac in tñcomi ye. .~.BPa i. .--Y~..~.Budge an.woplan fo th cur an ~fi ye. BPA'~ca~~ ha ~an th arnuius iiy drven prjectbar i; iq ~reli ~as wen as reg the agì BPA t:sion syst.Sìmul~y. a.3e~ .ofex-.y drven pr ar unay in rens to Tramission $e' N'etot.o, ~ at t()~ in reues. "Ais~~ ~.to~htJs wOt howeve;. ad. adtional prje to eXisti~WibeCblf~for1l ove th aetfe ytm. In an eff to ~ efen, BFA is ~.Ql tiignøvea two~." ~ wor plan which wi ~su in løn lea tùtoooplet pr. lllA is ~l1yn..~ by reg yo prvide adan noti of at lè 3 ye an in~..~ S. .~ for ~ prje. I ~tbs in be a dicut endevor but apate you sup and~onne~. Pi fe.ir..lo ~_if yo. have any quon or conc. SùY. Crg Ha OtHaTra Ac ExBo Po Adat 15 HE 41st St, Su 20Van. 'WA 98 3Ø19-11 of.31-6 ce. 1 XRG Response to RMP 37 - page 156 XRG Response to RM 37 -- page 151_!IFI t::..:Co M - TP. TPP-4 ramgo Ft Ja 07, 2011 7:11 AM00 RlidRE: Ch 1l8S Go Momt Coll, Sorr I m1sed you yestery.. 7500 NE 41st Stteet, Suite 130 Vancover, WA 98662-795 Once I reeie the ch I'll sdiede a scopin meeti ASAP for both 0045 &: G048. Th you,An ,. Q:i Ru 'i;g..'~J .. ~ 06 iG13:3ì PM M -1'-lf1~ An l kn YO'WI tol ~ th bere. but can yo gi me th addres for this r&pent check for the one tht went~? 11 have it oveed to yo tomow, Thks Co Rud Lead Proj Engine 802W Bannoc, 12th Floor Bose, ID 83702 Ofce; 208.336.9793 ViW'\V;eß'ergYïje\ieIO%;)rl,enr ...com ;"hiii jllerO" or ¡)'r'¡ed dO~ co:ains ,r,IQ""tOt whiC (ii' may i: LEGAL.!. Y P¡:I''¡.LFGI'D ¡)ROP;:¡,: ';¡;Y iN N" rU¡:t:. OR û'l"¡;,\,,SS P¡:C;,'l'fC;TED !3Ý tAi'.' ¡:P,OM DiI.O$URi. ii (òi 1$ !nll OIy for tl UH 01 !he Ad!'ø(a: ria-i Ilve. ,I the '~:$ I"l!ur¡ :S 10: :i'e '!¡¡f'oed rac::'m~: 0' :"e'~.~~:lb~:Q dl;~,îl to the klt~~ rÐpllPt)~ ar: l",~MY n(l~!fíed ~,t a~y clS$emfC4tt¡or, .' c~,n9 oS ,tnis COmrriijn:~~to:~ YCiJhllVt ~ved :ni.omtm¡eaio" ,n ..or. ~e 'n1lfete!y ""ly V$ by ~:lll. ana f''ßT' :hs n;1I$~¡;tl:O liS a: me at:ooii '!.""ll: adcress. i XRG Response to RMP 37 -- page 158 XRG Response to RMP 37 - page 159 .-11., nitnii ItIíJf' .1"':s.T.:""".1: Oc...AM M - TPTP-4 (a~ , JI f1, 2011 11 =11 AM... . Co~ The cb..,liø Î$ l'2926 dated 11/30/2010. Midy date stampe the bade With 12.113.t010. I... i .__. the paent to the wrong reuest beause now t seat.t1 boom it do &11 Coior Ridle. TeccalV, from oustøâpt it dou not ma how the ~ ar aplied since they ar both coming frm Exer, but hope I d1dn't mess tIs up on your end. I just f. to......., .-thave dased offSOewer. "-: Ql Rl1d (niQ;a..~coJ II. "li, Ji 01, 2011 10: AM,. 0i~ 1l1ii M - 'J-TJ liN' II 11 "On Ri Ñf,. ~..~~..o....~..~ iM Cc Ridd1k was ca an no the Chpin Moln one. ....~.w YQ hat ~.lt Co '.. th? Can yOU send ov i'coøf.th dt or . ~m.ber OF~? Th; Å~~I!).l~I ......n~ Pro Engìl'( $02 W BannOC 12th Rot Bose. 1083702 Of: 200.336.9793 ~hll eili'!'ie Of Pfint$Ô dOll"'t COtail' il'rotmllOf N¡'ct illi mal' be ;.EGAt. Y PRMtlGEO PROl'AA IN NATU. OR OTH&õ4Wrsi ~OTfCTED SV L.AWFRO DiSU~. li (èl i$ il'~ OfY lOt h lJ1l 01 :~ Ad_ts) nam ilvii. i: 11',& r./lcle I)f '''it m~ge is l'ollh il.lii rti"nt. or ~ IIllo~ or agfI ie!pr:~ i~ deiver ii to ii lrnl" rlCllt. yo" are hieby riimed ,hat a~y d'S8Iò!7,1''I¡ClC''. d,""b:;i:o~ r., :)C!lV'~", Cl 1!';t.,Oll'iailitleilion i, Strty pr~ted.lt '¡.;,,, nave l$lV$d ihs OOili'õ1WO¡' ;n erro. plé ¡mméd;~y 1100i!y us by OO'l'iné. Mel 'êl:'~ :!'e ()r,~"'n .-¥-S",Qa 10 ~'S ar ~he eb llii'ì~. i'im yO. """~":""'''''''''-''-~""--,;~_~_~.._,_.~:__,.,;,,,~,,.__,,.,~.~,".._.~c."'" """_"'''''''~:'''''''",~",.-,'_"'''.''',''.i',":..'''_:::'.v..,.:..~."._~'''_"'',.:~:,:,_",~.~." "_"""'""'~_-~"''':'_'~_:'::'.:,.','i'r",'':_:':'''''',:,"~~""~""",""',,'_',,",__"':""""""_'..: ~M -TP-lf(~~.goJ 8e t~, Ja 05 2011 10:67 AM TCM CG Iù...... PW: QØ Co Rl Hi CoIU Her is thereponse I got bacl fr the ladies downtai. 1 XRG Respose to RMP 37 -- page 160 I a¡.plied the check to the fist request (ChapiB~~~~'ra~~i~i,'~ I clecked the deposit quer agat today anddon~t&*iàe¡~pa~t iõ iØl-a need a check for G08 Connorlüdge. Let me know if you have any fuher questions. Thans,Ana Fr: oe,Us L - TS TP2 $e, Wedy, Janu 05, 2011 8:49 AMTo: CO M -TP-TPCCGr¡M M - lS-TP2 Su RE: G0 Co Ri Hi Anna. Mind proc the Con Ri pa wh pa tha had no che. We on re on . . one(l fol2. i pllI". th . le me kn If yo ne..... ~ Us o.~.r I P.rsal AssiantBonelle Po Adinist . 36.619.6632 '* 360619.694 HOurs: 7:00am-4:00m Fr: ~~M - iv..~~Wednei January 05, 2011 8:39 AM To:De,Us l- TSTPP-ir Gf,Mind M -lS-TP-2SP FW:. G0 Co Ri Hi ladies, J know you both received one of these requests an I did ~ one (oPfof.. check, but did both envelope contai a chec? Thans, Ana fr Co Ru (ma: . seid: Tue, Ja 04, 2611 3:24 PMTo: Co,A M - TP-TPSU RE: G0 Co Ri J Thnks. Á Colln RUd Lead Project Engineer aoz w 8annocK. 12th Floor BoiSe, ID 83702 2 XRG Response to RMP 37 -- page 161 Tli ~ Of ØfO: dO c:,. iiil'Ol W' (a' may be LEGAL!. Y î"RIVfLECEO PROPRlEi ~y iN NATURE. 00 OTH(1'W I$~ PROT£CTeO BY LAWF~ Oisll. Md tbi " imll Ql fo ire \i.. of th ~a\ na!N IOVf!. !f !he rtd9' ot !ii/i ''\18s. !S ~(r ¡ri ,I'~t¡dl ,~ O'll~!. or r~ii í\"'iiyel or ~ !'~ tò ~ it to:ht 'I'~ ~."i, YOll er"~ "o:íf~ that aty Q,sl"Ìb"'t'o~ or co"yir¡¡ 0; ;:08 ccr-..,c:~'CB:'C:i iS S','c:y pr"c'isd ,¡ yO.' h..... r_wil it-iii oomm,,'"!QIOf1 ,r. error .lllU ,m~at"'y fl,ly us by ~~l iil' cr'~¡~a' l1~'IP& to .1$ at the aboV9 e"'s.' frlr:¡'~'l ~~a('. ;ci. ~Øi Le me chec with the laes dowtai who opeed the Fed Ex envelopes. Perha th didn't iet it set to the locbox unti late last week. I'll keep you poted. co)..Cø.. . 3:0PM Ta: o.,A M -1P_.. I' .. M: at. CG ii An,.. it my. $0 it sh "-Vè be in wih evtyhinø else. Perhaps It didn't get routed to the ptQØr pla? let me kn wh we.nt. to do tOCOec It. CoRuiin L.ead Projec Enginer 802 W E3nnock. 12th Floo Boise. 1083702 Ofé: 20.33.9793 ww eJ(efgydf\ieiocfle¡~i,colT Tit. MtIric Of pred tlI' COia ,litM w! la; m4 bíl.GA Y PRr.¡lLGiO. PROPtjlET AAY !N NA lU?E. OR or¡.erw.¡is¡¡ PROTECTED BY LAWFROM OI8OSUf. an !tl it ~ \'y for 1N u.. 01 it ~(aì ii abVll, If 1M flláe: 01 :/1:$ "'"$Il' $ "O~ U'l' ~il!:'(J foo,piiim, or tt'! emilio,. 0: .nllf~ to ii_ it ÌC l! ¡11"~ ~i. ~ er n.4b¡i l\0l11í ¡hat try di$$ê'n,~a!:o". i:'s;~b~1"1' Of cc¡:yi'1g of tl';& cOl'm,,',cal.Ofí '$ itrt~~y ¡:òhMld ";'0; !live rtolÓ tl oomJ;~" In l\. ple ,mmea:e,ý iify '" bY ll!ept\l ar.d ret,,,:; :h¡¡ ~r,QI"a: MllU¡¡ll :0. ;l(l a: 'f;/ lOOV& 1fTS.: 11.:lraes "-Aiirlt irK! __ Cnlll, M - TP'"ll 4 (~.gol .. ~, JI 04,1011 10:" AMTo Cc Ru.111'.. .: Gf CO Ri Hi Col Could you chee on tbt additional payment for me, please? I checked the paymert quer agai tb m01' and only see the one $2,500 payment. Once I receive prf of~t for the second reqest I wi schedule a scoping meeti for bo reest'. ~se, I can go ahead and schede a scopin meeti for just G05 Chapin Moutai. Let me know. Th, 3 XRG Response to RMP 37 -- page 162 Ana 4 XRG Response to RMP 37 -~ page 163... Pf:IITe: Cc:...... - TP-o-3 (d~go201 i:PM TP~..caAn V ~ TP~3 HiCø- yOU"... to go to ~fo I'LlDM.,..ftic. n..LtD do...~. ltJu.. us if i' .. - hi .. .~ to .su JO.ør If it do't, yoWi ha to ch a di Point of~. f)J4~~~Po~T~ .PlMi (36)61.. .11 '.4~"". 0*_ R. £mø. .- ft, Ja 07, æl1 2:17 PMToc llIDI - TP-o38ulllæ Gæ St tJ ~i i o., Fo tl ti st, ca yo te .. hoWi we kn if we nee to only go ldaomj or if Its lOna to beall the way to ..1.Anea yo .pome to wh in th SIS it.sp out th co of exaciy wh this LiDAR stdy will be~, Th, Co Ru ¡ Lèad Engine l ,'. i~ Fl8o.IO 83702, Of: 20.339793t¡ ,..ww.&ii(trgydevlliopmef,tcom Th éilrçr pti' dOme colanS rt~¡¡oo nçt fai rnybt Li:GA Y PR1VIL. EGêO P~OPfilET AAY¡NNAMe¡OAoT~lìU PROTECiep $)' ~FlIOl$LOifi and (Il i$,~ o#y fOr ~ iJ of tÌ ÅÒ$$($ì name lls. If ~he 1"ader G1 ;his meßi 1$ ~-: tt ,l'OO '1JiP¡.m, or lit em~. or ~ rerisll:i. to deíWitlo (!e ¡~reP*! yo'" lire hêEIy noi~éd tha any dimmriüor. disirltutol' or cooyini¡ ci:his. oominJrlcatoon is ~ ~, II lfJnM~_ecil'líurllii.ÒfHI'"',~~Yl!ll¡¡ ti~,.ê\.1" íle org,r!.ai ~ to us alihè4l$la'J ad. i'il\!.y¡¡ Fr:~ C - TP..M 4 (ma;coarid.go) SI ~l JI 06 201 10:12 AMTe: ~ - ~3; CòRu 1 XRG Response to RM 37 - page 164 ce Han,Qa A - lS TP2~ Halt,. l- TP-TP¡ CO,AM - TP..'l; MaCh - "I3¡~~V-~3SQ R.: G038 St Dey NO Go some numbe on the WOAR. No as ba as I ha fe. Th tn"" uti._ t. on ~ pr~, The SPA labr shown is for tR suy gr to ta th ra numan pu ~1n.~!l th eabé reby most GIS programs. No overhad is inc an I undrs th th co fo ih~ woto ~th.Gis. int map an plt plans that the line ders can use is al no ino. so th ll nu for ge to a whe the line desine can be involed wold prob be cl to do whs lised be. $tl noe .ne as ba as I thought. Milla. Ida = 24 mi AACF (s fr eGIS ma) BPA labo cost = 2411 0*4 = 10 sta days = at $528 pe day aver = $5,28 LiDAR cot = 2*24*883 = $42,384 Aira = $5,00 Gr to = $S~ ( aprox. $2 pe mi ) :Mll '" Bri:: 45 mi Mer (se rr eGIS ma) BPA lå co = 45Jlu*4 = 18 st days = at $528 pe day a.'v~::.~ LiAR cost = 2*45*883 = $79,470 Ai = $6,00 Gnm i. = $97 ( approx. $21.. pe mi ) Fr: HammDey - ~3 se Thay,Debe 1$,2ß:lO 9~O$ AM1'0: ~,Chly C- TP-ïPi ..i:Ru1ce Haclo,Cr A - ~TP2i Ha,J L - TP-TP¡ COAnM-TP.';lP.;_~~ - ~3; Reaic,A V - TP-QPP3SU RE: 003$ St De No We ne at lea fr Mini to th ldhoe Tap. bu it 'M be ri to_a se qu_~~ af th way to Brie, Pn: Rand,Oln C - TP-TP-4 se 1h, De 16, 2010 9:03 AMTo: 'Co Rud' Cc HaDe '" TP3; Há,cr A - TSTP2¡ tl,. l-l'-lP¡ CS,A M -l"l'¡Ma,Qi - TP3¡ Re,A V . TP3SU RE: G038 St Dey No I ne to kno the nube of mil, fr wh to wh? 2 XRG Response to RM:P 37 - page 165 ...:06lRt..(l1.~Is~am) .. "f, De 16 201& 3:33 AMTOl~C-lP-~ ..'1 * Ie .. St ÐI llel! A fW se pr tl Ca yo .. ,. prmary bi like yo mentne? That wold be great. Th. I Co Rui.n11 Lea Pro Enginer eoa W Bari 12th Floor Bose. 10 83702.~'D;_.t7 www.exeitYCeve!oorne'1:.co:" Th~ iloj1lO9f ~ed~~ ¡~~..(.,~.i:~Vf'l"'~, l"~lSAA'r IN ..UÉ. QRO'Tl'lstil'ROTlCTO$V LA FROM \)isl.OSl.f'lt ~ (Ili it in.leniOly!o!l 1188 of me AdØ8(slll abOve, !f the :eder 01 thl$ m86~e IS fl.O! thè imeiirecem, or ins emloy" or ~i t~~ to dehver (I to lh ini~ fM1i:t.j'tl ate hlely 1\111l.ø tha any disSínai;cn. Òisinll\1t:c1' or oopyit'.gd th¡soommuncat:or '$ s:!!C\'Y pror,b¡ed yoe AA~.l1~ ~.~ ;11 JI. ~ l~_y tlly..py ~e. la '''m-im'.!'e ongir;a: mesagt.o ws ill the ae~ iima'¡ iiódss Tf!t\!' )'u. ..: ~,.ci..,C"1'"1' £md:~..pJ... ;..~...N4,.... ........' ... . ......~¡~_~A.. ..,.I¡HI~ l-l'.;rP; CO¡A M -1""TP;~~."~3;~.V-~3.....;.:....~..~ w.,~, ".....~~. ~...~ ~ outhal~ ....ti..:... l...............we wo_ on. __ be. 1'1iUOAR jo. dlfl a ~.. ...ât...Of..j th_ totb20 mt of ii. St. jU toge a ~ Ct. ou..j re Of th nu Of mil to be surv, co arnd.$2. l can get a~*_ thOOIl.. _ noOb on yo pa. bu to ae go thro wi th st. yo woha topùup th t'. SO if ~.__ ab _th'" we øe a~ bi. .'òpt an ~nt in pl an yo wo. ha to fr th oa.On . hae th paym in ti weee .th. ~.9Y to cl th st. an th our in hO gr" th ra cl an conver it to a copùer mo..ofth line. ln th our.~ ~...-. ~ ~I(__'" to to Fl. lo if we hae to ~ fo Qir grnd. Hop tlex" it we -.. Tha.~ ..1~~I~.. co) .._1b..,~~l~..~lØ~:U AMT.~C-.~.l..;~.--r3-Ha~ A .lS1..2¡ HaJøl. "f-TP; Co,A M .. ni-'T; Ma,Ch -1"3;~.V"~3_.IìRE:....~.Dø..~ Thnk fo yo re. Sonl li .Cb mus ha be mistken. Wht willk take to initiate a lir st? :3 XRG Response to RMP 37 - page 166 Á ¡.Coll Ru Lead pro¡e-:i Engmeer 802 IN Bannoc. 12th Fioor Boíse, 1083702 Ofice: 208,336.9793 t.:i.erÇJ¡'JêVBiGlj('''.er¡: r~J'- W~:C~ 'a; mai be LEGAlL Y Of'¡""i Qt ~he,t.-dtessøeasi r:;amed ab\fe. r¡"Tif&d ¡¡;;ei",re. ..: Rancø.rCh C - TP-1' (ma:CO~..l $e Wedne, .~ 15, 2010 4:54 PMTo:Harn - TP3; Co Rud . '. . .'. . .. . ...... .... . ..: ..... ..... .... .... Cc Han,Cr A - TS TP2;Ha,Jme L -lP-TP; Co,A.,M"' lP4~;Mi:"'~'- ~~a;Re,A V - TP-OP3 ~ RE: 0038 Stu DeyNoon i have't he ab any lld st. If eo ha be ~. rdSûIl....... ~. Fro: HamaDe . TP3 se we, De 15, 2010 3:36 PMTo: 'Coin Rud' :ce Ha,Qa A - TS TP2; Ha,Jme L -l1-TP¡ Co,A M ~ TP(prp'-4 Md~ ~~3;Rsne V . TP 3SU: RE: 0038 St Dey Notca Hi CoUin. IfLlAR st ha be cø, l ha't he Ib it T~....~___.._._.Cl.__ da. Cra - have yo herd an fr Raf Ri lb a reUtWil~ fr: Co Ru (ma' a)J se: Wey, De 15, 2010 3:32 PMTo: ll - TP3 Cc Hain,Crig A - TSE-TP2; Ha,J L -l1-1'; Co,A M -l'".; ~.; l'W-¡ ReIi,Air V - TP-o 3SU RE: 0038 Stuy De No Yes, I asked James aboijt that a while ago, Chad Black frm Raf Rivr setm totfinth tm lif\ had ~tl ..,.. rated.. or at leas lidar stijdies ha( ben copleted - and th th chanc of ~. th... ba. or a nf liè study Sêemedpre remote.lsthat accurate? À CoIØ:Øu Lead PrOject Engíneer 802 VI Bannock, 12th Fioor Boìse. ID 83ï02 Ofice: 208.336.9793 çontait~$ :nfc¡ma:íen ';.htcrí ~a)rnay be LEGAL.L Y imeooed crúy ~C~. ¡he ¡,se ii :h;; AdÔfætSStll,4,) r.amad lOV8, Ô~, !'Ier :: tü tra rmat\Oed :~,:,tJiiin1, are r\Qüfed. thatthis C~,¡:,;miYì,::a(cn ;:1 erior, ncCh oy 4 K:RGR~ponse to RMP 37 -- page 167 ""..~~fniii '.1111."~i'.: 'Mii ("d.~.pJ II 'Wldiy, De 15, 20104:30 PMTo~.t1nnGa l-1Ø"''f; ~ M -ll-l' 41 '''a~ - "I 3¡ HiCc. .,. Ill. ........... in on th Mi PH-Br li. 0t. thìr fr 1l Sl st th th is no av 08 st sta. ThJO1)øM~ ~ Po Adnmiiatr~Ptng (36)61.- .. 0D ~ rßl~,.1 leirgoplElit.a.J .. .. De_ 15, 2010 3:20 PM., ~Di - 'T3 ca ~ It - r.1P2¡ ll,J L - TP-TP¡ CO,A M - TP-TP-4¡ MaieOl - TP3¡lIlll~ V - 'T3S '.... Ø: .. Sl De lM An he's G0. Co Ru Lead Pr Engl'ElT 802 W Banoc, 12l Floor Boe, 1083702 Ofe: 20.33.9793 11$,~ QrprnW doi.l ~hS ¡~maior w\e~ (1) may 'be LEGA Y PRIViLEGED "qOPAiETARY iN NATURE. Ci: CTHERW 1SE ?F1OTECTSö $Y LAWFAO PI$OSlJlî, Wl .(b11$ ¡f'~ oiy fO ~ ,,~ òl the ~(s) I'med abe, ';t tn m&s$age 's M: ihe ,mer:déd reeip'"",. ,;i' ~l!~ ic délNelt \0 me¡n\~ I~t, yOti ar Í1il(\y noiñ9 tha any dissm"'81iO' . 0, ccrn~ 01 ¡hiS comn;ur,'Catio¡" is ye,r l"ave ieelled !hQOun,ca~O\í fl9frQ. ~M im11edl$ll J'otify :.!:)' tll¡~t', IJ retI,r :he org'~ lI: n':9~agl! :0 ::S aT tl:u &i:cv 11m.", ad(1ril$$. yOt' "':~-~3(ma_~.goJ .. ~, De 15, JetO: 2:07 PMTo Cè RuCc ..di A - T1''l; Ha,J L - TP-"T¡ Co,A M - TP-TP-4¡ MaCh - TP3¡Rt~ V -1l3Sii Bet G0 St DI No To eX De Gr (X): 5 XRG Response to RMP 37 -- page 168 Thi e-ail serv as our notoXf (p $e.4.1 of th $rlfi~~~" Sß) th we wil not cole the Fac.St for the ge ~.._..~..~.4Wll~" lOTX-14597) by Der' 7,2010. ~4. t(,1 tn SGIP st tlcitnT~mi Prosha~~ag. tPWit th~;ltaJ sttt if th Tra~ti$.al_\Feaiblit Stud wiin th time pe, it $hl no Interco Cuån wit an expan of the renswhYClit tie is reqir. Th syste Impa StudYRép st th the is no intercone ~ ~~ng.th Mi~ 138IW line. In orde to compe th reqed FAS st, XRG Wi nee to pt thr~inf~.onthMiid PH-Br line. AlSo, Traiol'fPlanin re rnicrosllng da tr tl de,ihii1liiå is''(~Y'W_coion of th Faclit Stud. . SPA wil pr to co th St wi an es co da of 30 ~.~."th~.fo th Miid PH-Br line an th reueed micng dat is reo. Ptse th atTurne I. SUtan Criteña docme at. Thak yo for yor attin to thi mat. t).,~~ Soneville PQW Ad Trans.misPlarming (36) 619- 6