Loading...
HomeMy WebLinkAbout20101124PAC to PIIC 146-149.pdf'I ~~~;~OUNTAIN November 23, 2010 Melinda Davison Davison Van Cleve, P.e. 333 S.W. Taylor St., Ste. 400 Portland, Oregon 97204 RE: ID PAC-E-1O-07 PIIC Data Request (146-149) REC'Ei\/ f) ZOW NOV 24 At110= 54 201 South Main, Suite 2300 Salt Lake City, Utah 84111 Please find enclosed Rocky Mountain Power's responses to PIIC Data Requests 146-149. Provided on the enclosed CD are Attachments PIIC 146, 147, and 148. Provided on the enclosed Confdential CD is Confdential Attachment PIIC 149c. The Confdential Attchment is Confdential and is provided to paries that have signed a protective order in ths docket. If you have any questions, please feel free to call me at (801) 220-2963. Sincerely, .,J. r-úfl tuL.C7/~ J. Ted Weston Manager, Regulation Enclosure: cc: Jean Jewell/IPUC (C)/3 copies Eric OlsenllPA (C) Ben Otto/ICL (C) Radall Budge/Monsanto (C) James R. Smithonsanto (C) Richard Anderson/Monsanto (C) George C. Carer, I1I/onsanto (C) Denns Peseau/onsanto (C) Gareth R. Kajander/Monsanto (C) Maurce BrubakerlMonsanto (C) Brian CollnslMonsanto (C) Michael Gormanonsanto (C) Kathr Iverson/onsanto (C) Mark WidmerlMonsanto (C) Greg Meyer/PIIC (C) Don Shoenbeck/IIC (C) P AC-E-1 0-07/Rocky Mountain Power November 23,2010 PIICData Request 146 PIle Data Request 146 Please provide the electronic EXCEL workpaper file used to produce Exhbit No. 84. Response to PIle Data Request 146 Please refer to Attchment PIIC 146 for the requested information. Recordholder: Sponsor: James Zhang Wiliam R. Griffth PAC-E-10-07/Rocky Mountain Power November 23,2010 PIIC Data Request 147 PIle Data Request 147 Please provide a complete copy of all analysis done to date with regard to Pacificorp's Loss of Load Probability (LOLP) study being conducted as par of the 2011 IRP process. Response to PIle Data Request 147 The loss ofload study report was recently completed and posted to PacifiCorp's IRP Web site on November 18,2010. Please refer to Attch PIIC 147 for the report. Recordholder: Sponsor: Pete Waren Greg Duvall PAC-E-10-07/Rocky Mountain Power November 23,2010 PIIC Data Request 148 PIle Data Request 148 The 2008 Update to the Integrated Resource Plan dated March 31,2010 refers to a capacity expansion model ("System Optimizer"). Please provide electronic copies of all loads used as inputs to ths model for ths report though 2019. Response to PIle Data Request 148 Please refer to Attchment PII C 148 for the set of load input fies for the System Optimizer modeL. Recordholder: Sponsor: Pete Waren Greg Duvall PAC-E-10-07/Rocky Mountain Power November 23,2010 PIIC Data Request 149 PIle Data Request 149 The 2008 Update to the Integrated Resource Plan dated March 31, 2010 refers to a capacity expansion model ("System Optimizer"). Please provide electronic copies of all output files generated by this model for ths report though 2019. Response to PIle Data Request 149 Output files from System Optimizer are in comma-delimited text file (CSV) format, and constitute confidential intellectul propert ofthe model vendor, Venty LLC. Venty and PIIC would need to sign a non-disclosure agreement (NA) before these fies could be provided by the Company. In lieu of the CSV fies, the Company prepared an Excel workbook with processed output data that can be provided without a NDA. Please refer to Confdential Attchment PIIC 149. Confdential inormation is provided subject to the terms and conditions of the protective agreement in this proceeding. Recordholder: Sponsor: Pete Waren Greg Duvall