HomeMy WebLinkAbout20101014PAC to Staff 322.pdf,..
~~~~OUNTAIN RECE. .
in\\\ OC1 \ \. l\~ Cj~\ '3
201 South Main, Suite 2300
Salt Lake Cit, Utah 84111
October 13,2010
Scott Woodbur
Idaho Public Utilties Commission
472 W. Washington
Boise, ID 83702-5918
Neil Price
Idaho Public Utilities Commssion
472 W. Washington
Boise, ID 83702-5918
RE: il PAC-E-I0-07
IPUC Data Request (319-323)
Please fid enclosed Rocky Mountan Power's Response to IPUC Data Request 322.
If you have any questions, please feel free to call me at (801) 220-2963.
Sincerely,,T0~/~
J. Ted Weston
Manager, Regulation
Enclosure:
cc: Jean JewellJUC (C)/ 3 copies
Eric OlsenllPA (C)
Ben Otto/ICL (C)
Radal Budge/Monsanto (C)
James R. Smithonsanto (C)
Richard Anderson/onsanto (C)
George C. Carer, III/onsanto (C)
Denns Peseu/onsto (C)
Gareth R. Kajander/Monsanto (C)
Maurce Brubaker/Monsanto (C)
Brian Collns/Monsanto (C)
Michael Gormanonsanto (C)
Kathr Iverson/onsanto (C)
Mark Widmer/Monsanto (C)
,.P AC-E- 1 0-07/Rocky Mountain Power
October 13,2010
IPUC Production Data Request 322
¡PUC Production Data Request 322
Wht is the tota capacity for the Dunap Rach Wind Far Phase 1
Interconnection? Do the curent 74 wid generators use the total capacity of this
trsmission facility?
Response to IPUC Production Data Request 322
The Dunap I interconnection to PacifiCorp's network transmission system is via
the Shirley Basin Substation. PacifiCorp's transmission fuction commssioned
constrction of the Shirley Basin substation in conformance with all applicable
Federal Energy Reguatory Commission (FERC) requiements, includig FERC
large generator interconnection agreement (LGIA) requiements and FERC open
access transmission taff (OATT) requirements. PacifiCorp's transmission
fuction determed the specifications associated with the Shiley Basin
substation consistent with other like interconnection facilties located on
PacifiCorp's network transmission system. In so doing, the Shiley Basin
substation specifications were determned by tang into account the Dunap I
LGIA, other then-curent LGIA applications as well as reasonably expected futue
LGIA applications. Consistent with prudent utility practices, the facilties
necessar to interconnect Dunap I to the Shiley Basin substation were designed
to meet or exceed 111 megawatts of demand.
Recordholder:
Sponsor:
Kenneth Houston / Mark Tallman
Stefan Bird