Loading...
HomeMy WebLinkAbout20101014PAC to Staff 322.pdf,.. ~~~~OUNTAIN RECE. . in\\\ OC1 \ \. l\~ Cj~\ '3 201 South Main, Suite 2300 Salt Lake Cit, Utah 84111 October 13,2010 Scott Woodbur Idaho Public Utilties Commission 472 W. Washington Boise, ID 83702-5918 Neil Price Idaho Public Utilities Commssion 472 W. Washington Boise, ID 83702-5918 RE: il PAC-E-I0-07 IPUC Data Request (319-323) Please fid enclosed Rocky Mountan Power's Response to IPUC Data Request 322. If you have any questions, please feel free to call me at (801) 220-2963. Sincerely,,T0~/~ J. Ted Weston Manager, Regulation Enclosure: cc: Jean JewellJUC (C)/ 3 copies Eric OlsenllPA (C) Ben Otto/ICL (C) Radal Budge/Monsanto (C) James R. Smithonsanto (C) Richard Anderson/onsanto (C) George C. Carer, III/onsanto (C) Denns Peseu/onsto (C) Gareth R. Kajander/Monsanto (C) Maurce Brubaker/Monsanto (C) Brian Collns/Monsanto (C) Michael Gormanonsanto (C) Kathr Iverson/onsanto (C) Mark Widmer/Monsanto (C) ,.P AC-E- 1 0-07/Rocky Mountain Power October 13,2010 IPUC Production Data Request 322 ¡PUC Production Data Request 322 Wht is the tota capacity for the Dunap Rach Wind Far Phase 1 Interconnection? Do the curent 74 wid generators use the total capacity of this trsmission facility? Response to IPUC Production Data Request 322 The Dunap I interconnection to PacifiCorp's network transmission system is via the Shirley Basin Substation. PacifiCorp's transmission fuction commssioned constrction of the Shirley Basin substation in conformance with all applicable Federal Energy Reguatory Commission (FERC) requiements, includig FERC large generator interconnection agreement (LGIA) requiements and FERC open access transmission taff (OATT) requirements. PacifiCorp's transmission fuction determed the specifications associated with the Shiley Basin substation consistent with other like interconnection facilties located on PacifiCorp's network transmission system. In so doing, the Shiley Basin substation specifications were determned by tang into account the Dunap I LGIA, other then-curent LGIA applications as well as reasonably expected futue LGIA applications. Consistent with prudent utility practices, the facilties necessar to interconnect Dunap I to the Shiley Basin substation were designed to meet or exceed 111 megawatts of demand. Recordholder: Sponsor: Kenneth Houston / Mark Tallman Stefan Bird