HomeMy WebLinkAbout20100924PAC to Staff 212.pdf~~;~OUNTAIN REeE
September 23, 2010 20m S£l 24 AM 9=\ 9
201 South Main, Suite 2300
Salt Lake City, Utah 84111
Scott Woodbur
Idaho Public Utilties Commssion
472 W. Washington
Boise, ID 83702-5918
Neil Price
Idaho Public Utilties Commission
472 W. Washigton
Boise, ID 83702-5918
RE: ID PAC-E-1O-07
IPUC Data Requests (202-222)
Please find enclosed Rocky Mountan Power's 1st revised response to IPUC Data Request 212.
Provided on the enclosed CD is Attchment IPUC 212 1st Revised.
If you have any questions, please feel free to call me at (801) 220-2963.
Sincerely,
J.T.¿d tu~/~
J. Ted Weston
Manager, Regulation
Enclosure:
cc: Jean JewelllIPUC (C)! 3 copies
Eric OlsenlIPA (C)
Ben OttolICL (C)
Radall Budge/Monsanto (C)
James R. Smithonsanto (C)
Richard Anderson/onsanto (C)
George C. Carer, III/onsanto (C)
Denns PeseauIonsanto (C)
Gareth R. Kajander/Monsanto (C)
Maurce Brubaker/Monsanto (C)
Brian Collns/Monsanto (C)
Michael Gormanonsanto (C)
Kath Iverson/onsato (C)
Mark Widmer/Monsanto (C)
PAC-E-1 0-07/Rocky Mountan Power
September 23, 2010
IPUC Production Data Request 212 1 st Revised
IPUC Production Data Request 212
Please provide the five year of data in electronic executable format, used to
derive the test year peak and saes curailment for Idaho and Uta program.
1st Revised Response to IPUC Production Data Request 212
The followig replaces, it its entiety, the Company's original response dated
August 24,2010.
Please note that the Company based its test year curlment for the Idao and
Uta progrs on a thee year average. Please refer to Attchment ¡PUC 212 1 st
Revised for the five years of data and the calculation based on a three year
average as was used in the filing..
Changes made were: (1) The labels have been corrected; and (2) To be consistent
with the calculation of the 3 year average, September Uta irrgation curlment
has been multiplied by 2/3.
In preparng ths response, the Company became aware of an error in the
calculation of the Utah Coolkeeper Program curlment included on Page 10.13
of Steven R. McDougal's Exhbit NO.2. Correcting the error as shown in
Attchment IPUC 212 1st Revised results in a slight decrease of approxitely 3
MW (out of 98,787 MW) in the Uta load included in "Loads for Jursdictional
Allocation (CP)" on Page 10.13 Mr. McDougal's exhbit. The correction would
result in an immaterial increase to Idao's share of system-allocated costs.
Recordholder:
Sponsor:
Pete Eelkema
Pete Eelkema