Loading...
HomeMy WebLinkAbout20100924PAC to Staff 212.pdf~~;~OUNTAIN REeE September 23, 2010 20m S£l 24 AM 9=\ 9 201 South Main, Suite 2300 Salt Lake City, Utah 84111 Scott Woodbur Idaho Public Utilties Commssion 472 W. Washington Boise, ID 83702-5918 Neil Price Idaho Public Utilties Commission 472 W. Washigton Boise, ID 83702-5918 RE: ID PAC-E-1O-07 IPUC Data Requests (202-222) Please find enclosed Rocky Mountan Power's 1st revised response to IPUC Data Request 212. Provided on the enclosed CD is Attchment IPUC 212 1st Revised. If you have any questions, please feel free to call me at (801) 220-2963. Sincerely, J.T.¿d tu~/~ J. Ted Weston Manager, Regulation Enclosure: cc: Jean JewelllIPUC (C)! 3 copies Eric OlsenlIPA (C) Ben OttolICL (C) Radall Budge/Monsanto (C) James R. Smithonsanto (C) Richard Anderson/onsanto (C) George C. Carer, III/onsanto (C) Denns PeseauIonsanto (C) Gareth R. Kajander/Monsanto (C) Maurce Brubaker/Monsanto (C) Brian Collns/Monsanto (C) Michael Gormanonsanto (C) Kath Iverson/onsato (C) Mark Widmer/Monsanto (C) PAC-E-1 0-07/Rocky Mountan Power September 23, 2010 IPUC Production Data Request 212 1 st Revised IPUC Production Data Request 212 Please provide the five year of data in electronic executable format, used to derive the test year peak and saes curailment for Idaho and Uta program. 1st Revised Response to IPUC Production Data Request 212 The followig replaces, it its entiety, the Company's original response dated August 24,2010. Please note that the Company based its test year curlment for the Idao and Uta progrs on a thee year average. Please refer to Attchment ¡PUC 212 1 st Revised for the five years of data and the calculation based on a three year average as was used in the filing.. Changes made were: (1) The labels have been corrected; and (2) To be consistent with the calculation of the 3 year average, September Uta irrgation curlment has been multiplied by 2/3. In preparng ths response, the Company became aware of an error in the calculation of the Utah Coolkeeper Program curlment included on Page 10.13 of Steven R. McDougal's Exhbit NO.2. Correcting the error as shown in Attchment IPUC 212 1st Revised results in a slight decrease of approxitely 3 MW (out of 98,787 MW) in the Uta load included in "Loads for Jursdictional Allocation (CP)" on Page 10.13 Mr. McDougal's exhbit. The correction would result in an immaterial increase to Idao's share of system-allocated costs. Recordholder: Sponsor: Pete Eelkema Pete Eelkema