HomeMy WebLinkAbout20100923PAC to PIIC 80.pdf,"
~~~OUNTAIN
September 22,2010
Melinda Davison
Davison VanCleve, P.C.
333 S.W. Taylor St., Ste. 400
Portland, Oregon 97204
Randall J. Falkenberg
. RFI Consulting, Inc.
PMB362
8343 Roswell Road
Sandy Springs, GA 30350
RE: IDP AC-E-l 0-07
PILC Data Request (65-84)
2810 SEP 23 Art 1():14 ~~:t ~~~hc~;~nú:~it~~~
, 'T'LliQAHOvi iIES
Plea fid enClosed Rocky Mountai Power's response to PIlC Data Request 80. Provided on
the enclosed CD is Atthment PILC 80.
If you have any questions, please feel free to call me at(801) 220-2963.
Siacerely,
7, T~d tfàU~
J. Ted Weston .
Mager, Regulation
Enclosur:
cc: Jean Jewell/UC (C)/ 3 copies
Eric OlsenlIPA (C)
Ben OttofICL (C)
Radal BudgelMonsanto (C)
James R. Smithonsanto (C)
Richad AndersonIonsto (C)
George C. Carer, IlIIonsanto (C)
DennsPeseauIonsato (C)
Gar R. Kajander/Monsato (C)
Maurce BrubakerlMonsto (C)
Brian Collinonsanto (C)
Michal Gormonsto (C)
Ka IversonIonsanto (C)
Mark WidmerlMonsato (C)
PAC-E-1O-07/Rocky Mountain Power
September 22, 2010
PILC Data Request 80
PIIC Data Request 80
Please provide all analysis used in calculating the weather normalization
adjustment. Please provide all weather data utilized and please identify all
weather station(s) from which the data utilzed was collected.
Please refer to Attachment PIlC 80. Weather data is from the Pocatello Idaho
weather station.
~:
Response to PIIC Data Request 80
Recordholder:
Sponsor:
Pete Eelkema
Pete Eelkema