September 16, 2010
Radal C. Budge
RACIN, OLSON, NYE, BUDGE &
BAJLEY, C~TERED
P.O. Box 1391; 201 E. Center
Pocatello, Idaho 83204-1391
RE: ID PAC-E-1O-07
Monsanto 11 th Set Data Request (1-8)
Please fid enclosed Rocky Mountan Power's responses to Monsanto iith Set Data Requests
11.1 - 11.8. Provided on the enclosed CD are Attchments Monsanto 11.7 and 11.8. Provided
on the enclosed Confdential CD are Confdential Attchments Monsanto 11.1 and 11.2. The
Confdential Attchments are Confdential and are provided to paries tht have signed aprotective order in this docket. .
If you have any questions, please feel free to call me at (801) 220-2963.
Sincerely,
1: JLt; tv~1 ~
J. Ted Weston
Manager, Reguation
Enclosur:
cc: Jean Jewel1/UC (C)/ 3 copies
Eric Olsen/IPA (C)
Ben Oto/lCL (C)
James R. Smithonsanto (C)
Richad AndersönJönstö (C)
George C. Carer, IIIonsanto (C)
Denns Peseau/onsanto (C)
Gath R. KajanderlMonsato (C)
Maurce BrubakerlMonsanto (C)
Brian Collinonsto (C) ,
Michal Gormanonsanto (C)
Ka IversonJonsto' (C)
Mark WidmerlMonsanto (C)
,~
PAC-E-I0-07/Rocky Mountain Power
September 16, 2010
Monsanto Data Request 11.1
Monsanto Data Request 11.1
Please provide the DC Intertie contract.
Response to Monsanto Data Request 11.1
Please refer to Confidential Attchment Monsanto 11.1. Confidential information
is provided subject to the terms and conditions of the protective agreement in this
proceeding.
Recordholder:
Sponsor:
Jim Schroeder
Hui Shu
,( ; , I", ..' I'
f
.I
PAC-E-I0-07/Rocky Mountain Power
September 16, 2010
Monsanto Data Request 11.2
Monsanto Data Request 11.2
Please provide the anual amount of energy transferred over the DC Intertie for
the period 2000 through 2009 and 2010 to date.
Response to Monsanto Data Request 11.2
The Company objects to this requeston the basis that it requests information not
relevant to the time period of this proceeding. Notwithstanding this objection, the
Company responds as follows:
Confdential Attachment Monsanto 11.2 contains all power transactions at the
Nevada Oregon Border that the Company entered into during 2006'to 2009,
which is the base period of the curent proceeding. Confidential information is
provided subject to the terms and conditions of the protective order in this
proceeding.
These are the only power transactions that could possibly be delivered through the
transmission contract referenced in the data request. However, many of the
transactions at the delivery point could also be wheeled though other short term
transmission paths, or were par of a financial bookout under which power would
not have been transmitted. The Company is unable to identify which transactions
actually utilzed the referenced transmission contracts.
Recordholder:
Sponsor:
John Fritz
Hui Shu ( ~, . I 1;-: ' ,
,¡: 'U
I.
.I
PAC-E-l 0-07/Rocky Mountain Power
September 16,2010
Monsanto Data Request 11.3
Monsanto Data Request 11.3
At the August 19,2010 IRP meeting on wind integration, the Company stated that
wind integration reserve requirements would be modeled as an input to GRID for
ratemaking. Using the reserve requirements from the draft wind integration study
please describe how the Company would include the reserve requirements as an
input to GRID.
Response to Monsanto Data Request 11.3
The Company is currently reviewing' the information presented by the 2010 wind
integration study to determine how to incorporate the level of reserve
requirements into GRID.
Recordholder:
Sponsor:
Hui Shu
Hui Shu
i
f
PAC-E-1O-07/Rocky Mountain Power
September 16, 2010
Monsanto Data Request 11.4
Monsanto Data Request 11.4
Please provide the test year hourly retail load input file for GRID excluding the
Monsanto curtailment.
Response to Monsanto Data Request 11.4
The Company has not developed an hourly fie excluding the Monsanto
curlment. Please refer to the Company's response to Monsanto Data Request
10.13, specifically Confidential Attchment Monsanto 10.13, for the development
of the monthly Monsanto curailment values.
Recordholder:
Sponsor:
Pete Eelkema
Pete Eelkema
PAC-E-I0-07/Rocky Mountain Power
September 16, 2010
Monsanto Data Request 11.5
Monsanto Data Request 11.5
Please provide Rocky Mountain Power's most recent forecast or projection of
anticipated rate changes over the ne~t 5 years for Idaho and all other jursdiction.
Response to Monsanto Data Request 11.5
The Company objects to this request on the grounds that this information is
confidential and subject to the attorney-client privilege. RMP furter objects to
this request because it is not relevant to this proceeding,
Recordholder: N/ A
Sponsor: N/ A
, I'y
PAC-E-l 0-07/Rocky Mountain Power
September 16, 2010
Monsanto Data Request 11.6
Monsanto Data Request 11.6
Please provide Rocky Mountain Power's most recent business plan which reflects
forecast or projected rate changes.
Response to Monsanto Data Request 11.6
The Company objects to this request on the grounds that this information is
confidential and subject to the attorney-client privilege. RMP fuher objects to
this request because it is not relevant to this proceeding,
Those portions of the curent busine,ss planwhich do not contain projected rate
changes or other strategic information are highly confidential and may be
reviewed at the Company's offces. Please contact Ted Weston at 801-220-2963
to discuss arangements.
Recordholder: N/ A
Sponsor: N/ A
,',
'.)"
i i ¡ "1
PAC-E-l 0-07/Rocky Mountain Power
September16,2010
Monsanto Data Request 11.7
Monsanto Data Request 11.7
This is a follow up to IIP A's Request 33b. Please provide actual time of the
monthly system coincident peak and each jurisdictions contribution to the
monthly coincident peak for Januar 2010 through present.
Response to Monsanto Data Request 11.7
Please refer to Attachment Monsanto 11.7 for a copy of the preliminary date and
hour of the monthly coincident peak and preliminar jursdictional contribution to
the coincident peak. Final times and contribution to coincident peak for 2010 will
not be available until mid-February 2011.
Recordholder:
Sponsor:
Pete Eelkema
Pete Eelkema
~.
u) ,¡ "j; 1,'.;: 'i,
.~ J
PAC-E-l 0-07/Rocky Mountain Power
September 16,2010
Monsanto Data Request 11.8
Monsanto Data Request 11.8
Please provide Monsanto's actual hourly load data for 2010 (January to present).
Response to Monsanto Data Request 11.8 ,
Please refer to Attachment Monsanto 11.8.
Recordholder:
Sponsor:
Robert McCarhy
To Be Determined