Loading...
HomeMy WebLinkAbout20100902PAC to Staff 223-251.pdf("- , ,-ROCKY MOUNTAIN ~ ~2!!~!30RP RECE iÐlß SEP-2 'O~,30 201 South Main, Suite 2300 Salt Lake City, Utah 84111 September 1, 2010 Scott Woodbur Idaho Public Utilties Commssion 472 W. Washington Boise, ID 83702-5918 Neil Price Idaho Public Utilties Commssion 472 W. Washigton Boise, ID 83702-5918 RE: ID PAC-E-1O-07 IPUC Data Request (223-251) Please find enclosed Rocky Mounta Power's responses to IPUC Data Requests 223-251. Provided on the enclosed CD are Attchments IPUC 224, 226, 229 -2, 230, 237 -(1-2),238,242, and 243. Provided on the enclosed Confdential CD are Confdential Attchments IPUC 223, 227,228 -(2-3), 229 -1, 231 -(1-2), and 245. The Confdential Attchments are Confdential and are provided to paries that have signed a protective order in ths docket. If you have any questions, please feel free to call me at (801) 220-2963. Sincerely, JtT.,~ tu~/~ J. Ted Weston Manger, Regulation Enclosure: cc: Jean JewelllPUC (C)/3 copies Eric Olsen/IP A (C) Ben Oto/ICL (C) Randal Budge/Monsanto (C) James R. Smithonsanto (C) Richard Anderson/onsanto (C) George C. Carer, IIIIonsanto (C) Denns Peseau/onsanto (C) Gareth R. Kajander/Monsanto (C) Maurce Brubaker/Monsanto (C) Brian Collins/Monsanto (C) Michael Gormanonsanto (C) Kath Iverson/onsanto (C) Mark Widmer/Monsanto (C) ~P AC-E-l 0-07/Rocky Mountan Power September 1, 2010 IPUC Production Data Request 223 IPUC Production Data Request 223 For Bridger Coal Company (BCC), please provide a schedule showig 2007 through 2010 to date monthy balances for the materials and supplies subaccounts. Please include withn your response the descriptions of the accounts, the amounts in each account and the tuover ratios for each account. Response to IPUC Production Data Request 223 Materials and supplies at Bridger Coal Company ar segregated by account by mining operation, Surace Mine and Underground Mine. Please see Confdential Attchment IPUC 223 for the requested monthy detaL. This information is confdential and is provided subject to the terms and conditions of the protective agreement in this proceeding. Recordholder: Sponsor: Brian Durng Cindy Crae PAC-E-IO-07/Rocky Mountain Power September 1, 2010 IPUC Production Data Request 224 IPUC Production Data Request 224 For BCC, please provide a curent organzation char showig naes of employees and their titles that includes all managers and executives. Please include withn your response how this organzation cha changed or is expected to change durg 2009 and 2010. Response to IPUC Production Data Request 224 Please see Attchment IPUC 224 for the curent Bridger Coal Company organzational cha. In June 2009, five safety and techncal engineerig positions formerly reportg to Interwest Mining were transferred to Bridger Coal Company. These employees had been workig primarily on projects at Bridger Coal Company. No other formal organzational changes are expected to occur in 2010. Recordholder: Sponsor: Brian Durg Cindy Crane PAC-E-10-07/Rocky Mounta Power September 1,2010 IPUC Production Data Request 225 IPUC Production Data Request 225 For each offcer of BCC, please provide the total dollar amount of remuneration for 2007 though 2010 to date and proformed through December 31, 2010. Pleae separate the amounts into salar, incentive pay, options, benefits and other. Pleae provide ths information for each offcer by month. For each offcer, please also provide the percentages of his or her tota remuneration that is allocated to underground and surace operations along with the basis for that allocation, and please itemize by base salar, bonuses, and benefits. Response to IPUC Production Data Request 225 Bridger Coal Company is a joint ventue operation between Pacific Minerals, Inc. (PMI) and Idaho Energy Resources, Inc. (lERCO). Bridger Coal Company is the operating company for the mie and is manged Pacific Mierals, Inc. Bridger Coal Company does not have its own offcers. Recordholder: Sponsor: Brian Durg Cindy Crae P AC-E-1 0-07/Rocky Mountan Power September 1, 2010 IPUC Production Data Request 226 IPUC Production Data Request 226 For BCC, please provide the tota number of employees and employee expenses by month by account and in total for 2007 throug 2010 to date. In addition, please provide the budgeted amounts for 2010. Response to IPUC Production Data Request 226 Please see Attachment IPUC 226. Recordholder: Sponsor: Brian Durg Cindy Crane PAC-E-10-07/Rocky Mountain Power September 1, 2010 IPUC Production Data Request 227 IPUC Production Data Request 227 For BCC, please provide a copy of the most recent employee handbook. Response to IPUC Production Data Request 227 Please see Confdential Attchment IPUC 227 for Bridger Coal Company Human Resource Policy and Guidelines for both represented and non-represented employees. This inormation is confdential and is provided subject to the terms and conditions of the protective agreement in ths proceeding. Recordholder: Sponsor: Brian Durg Cindy Crane P AC-E-1 0-07/Rocky Mountan Power September 1, 2010 IPUC Production Data Request 228 IPUC Production Data Request 228 For BCC, please provide a copy of all agreements with unon employees effective durng 2007,2008,2009 and 2010. Pleas include with your response a synopsis of the major compensation changes in these agreements from year to year. Response to IPUC Production Data Request 228 For the time period identified in the request, Bridger Coal Company had two unon agreements in effect. 1. November 26, 2003 to November 25, 2007 . Wage increase of3.5% per year. 2. November 26, 2007 to November 25, 2010 . Surface Mine wage increase of3.0% increase per year. . Underground Mine wage increase of 4.0%first year and 3.0% for remaing two years. Please see Confdential Attachment IPUC 228 -1 (BCC Union Agreement 2003 to 2007) and Confdential Attachment IPUC 228 -2 ( BCC Union Agreement 2007 to 2010). These documents are confdential and are provided subject to the terms and conditions of the protective agreement in ths proceeding. Recordholder: Sponsor: Brian Durg Cindy Crae PAC-E-10-07/Rocky Mountain Power September 1, 2010 . IPUC Production Data Request 229 IPUC Production Data Request 229 For BCC, please provide a description of all incentiveibnus plans in effect durng fiscal years 2008,2009 and 2010. Please include with your response the employees or group of employees eligible under each of the plans and the costs attbutable to each of these plan. Indicate whether and describe any changes to the incentiveibonus plans that are anticipated or under consideration. Response to IPUC Production Data Request 229 Bridger Coal Company has established a Safety Incentive Program for hourly employees. Please see Confdential Atthment IPUC 229 -1 for details of ths progra for 2008,2009, and 2010. Ths document conta confdential inormation and is provided subject to the term and conditions of the protective agreement in ths proceeding. The payout for ths program was $708,892 for 2008 and $687,103 for 2009. Please refer to Attchment IPUC 229 -2 for the Anua Incentive Plan ("Al") Documents for 2008-2010. All reguar, ful and par-time non-represented employees were and are eligible to paricipate in the AlP. There are no changes anticipated or under consideration for ths plan. Also attched is the company wide STARS A wad Program documentation. The STARS awards are provided to employees on an inormal basis thoughout the year, for efforts and performance that went above and beyond their normal job requirements and expectations. Recordholder: Brian Durng Sponsor: Cindy Crane PAC-E-10-07/Rocky Mountan Power September 1, 2010 IPUC Production Data Request 230 IPUC Production Data Request 230 For BCC, please provide the account numbers and amounts posted that the Company used to book incentive payments for 2009. Response to IPUC Production Data Request 230 Please see Attchment IPUC 230. Ths data relates to the salar incentive progr for non-unon employees at Bridger Coal Company. Recordholder: Sponsor: Brian Durg Cindy Crane P AC-E-1 0-07/Rocky Mountan Power September 1, 2010 IPUC Production Data Request 231 IPUC Production Data Request 231 For BCC, please provide all documents supporting budgeted and actul wage increases (if any) for non-unon and exempt employees durg 2009 though 2010. Please include within your response the number of employees (budgeted and actu) to which these wage increases applied and their associated saares pre and post wage increase. Response to IPUC Production Data Request 231 Please see Confdential Atthment IPUC 231 -1 for 2009 and 2010 non-unon merit increase assumptions for the budget plan. Please note that the 2010 budget plan merit increase is effective December 26, 2009. Please see Confdential Attchment IPUC 231 -2 for the actul 2009 listing of merit increases proposed by Bridger Coal Company to Corprate Human Resources. This inormation is confdential and is provided subject to the terms and conditions of the protective agreement in ths proceeding. Recordholder: Sponsor: Brian Durng Cindy Crane P AC-E-I 0-07/Rocky Mountain Power September 1, 2010 IPUC Production Data Request 232 IPUC Production Data Request 232 For BCC, please provide a wrtten narative that explais how the Company sets employee salares, incentive payments and other employee benefits. Please provide a copy of the salary sureys or other documentation used to set employee salares. Response to IPUC Production Data Request 232 The Company's pay philosophy is to taget tota cash (base plus bonus) and related employee benefits at the average of the markets in which we compete. Market data is collected by PacifiCorp's paricipation in anual sureys. The surey data is then submitted in MarketPay, our online market pricing system. The Company made MarketPay available to IPUC sta for on-line review September 2,2010. Recordholder: Sponsor: Erich D. Wilson To Be Determined PAC-E-10-07/Rocky Mountan Power September 1, 2010 IPUC Production Data Request 233 IPUC Production Data Request 233 For BCC, please provide copies of the employee newsletters issued durg the period 2007 to date. Response to IPUC Production Data Request 233 Bridger Coal Company does not publish employee newsletters. Recordholder: Sponsor: Brian Durg Cindy Crae PAC-E-10-07/Rocky Mountan Power September 1, 2010 IPUC Production Data Request 234 IPUC Producton Data Request 234 For BCC, please provide all offcers' employee numbers, naes, job titles, detaled job descriptions, responsibilties, base salares, and other compensation by year since 2007. Response to IPUC Production Data Request 234 Please refer to the response to IPUC 225. Recordholder: Sponsor: Brian Durng Cindy Crane P AC-E-l 0-07/Rocky Mountain Power September 1,2010 IPUC Production Data Request 235 IPUC Production Data Request 235 For BCC, please provide details of all bonus plan included in the test period and the criteria and goals used to grant employees bonuses. Response to IPUC Production Data Request 235 Please see the response to IPUC 229 for the 2010 Anua Incentive Plan and STARS Award documents. Recordholder: Sponsor: Erich D. Wilson To Be Determed P AC-E-1 0-07/Rocky Mountain Power September 1,2010 IPUC Production Data Request 236 IPUC Production Data Request 236 For BCC, please explai the basis for all offcers' salar increases from the 2009 level to the 2010 leveL. Also, please provide all documents that are relevant to ths inquiry. Response to IPUC Production Data Request 236 Please refer to data response IPUC Production 225. Recordholder: Sponsor: P AC-E-1 0-07/Rocky Mountain Power September 1, 2010 IPUC Production Data Request 237 IPUC Production Data Request 237 Please provide the average cost and tonnage of coal delivered from Bridger Coal Company and Black Butte for each year 2005 to date. a. For the years 2007 though 2010 to date, please provide costs and tons delivered per month per year from both Bridger Coal Company and Black Butte. b. Does PacifiCorp have any reason to expect coal costs to increase durg the remainder of2010 and durng 2011. If these costs are expected to increase, please provide supporting data. Response to IPUC Production Data Request 237 Please see Attchment IPUC Production 237 -1. a. Please see Attchment IPUC Production 237 -2. b. Coal costs as filed in the rate case are based on forecasted coal cost components for both the Black Butt coal contrct and coal production costs at Bridger Coal Company. The Company expects some varance from the rate fiing but at ths time is unble to quatify with any additional certnty as to the magntude of the costs. Recordholder: Sponsor: Brian Durng Cindy Crane P AC-E-l 0-07/Rocky Mountain Power September 1, 2010 IPUC Production Data Request 238 IPUC Production Data Request 238 Please provide the coal inventory by location and by month for the period 2007 to date. Please provide both tonnage and cost for each data point. Please provide ths data in excel format. Response to IPUC Production Data Request 238 Please see Attchment IPUC 238. Recordholder: Sponsor: Brian Dung Cindy Crane y " PAC-E-IO-07/Rocky Mountan Power September 1,2010 IPUC Production Data Request 239 IPUC Production Data Request 239 For the information provided in the above question, please explai any signficant chage in either volume (tonnage) or cost for each coal pile durg this period. Response to IPUC Production Data Request 239 The requested information is included in Attchment IPUC 238. Recordholder: Sponsor: Brian Durng Cindy Crane ,. P AC-E-1 0-07/Rocky Mountan Power September 1, 2010 IPUC Production Data Request 240 IPUC Production Data Request 240 The next three questions relate to Bridger: How is coal quaity measured? Wht are the metrcs (specifications), instrentation used, and frequency? Response to IPUC Production Data Request 240 Coal quality is determined by sampling and laboratory analysis, all in accordance with ASTM stadards. An on-line elemental coal analyzer located on the conveyor feeding unts 1-3 provides real-time data valuable for monitorig and adjusting the blend of coal sent to these unts. Received coal from the Bridger Mine is sampled and collected for each shift. From the Black Butte Mine a sample is collected from each trai. From the Leucite Hils mine trck deliveries, one sample is collected from each daily shipment. Bured coal samples are collected for each shift; one for unts 1-3 and one for unt 4. This is because unts 1-3 share a common coal handling system separate from unit 4. Coal sampled at PacifiCorp locations (Bridger Mine and Bridger Plant) is analyzed at an on-site coal laboratory operated by Wyomig Analytical Laboratories, Inc. These samples are analyzed for moistue, ash, sulfu, heating value, certn ash oxides (sodium, iron and calcium), as well as ash fusion temperatures. Shift lab results are weight averaged for each day and the daly value is reported. At the Bridger coal lab the followig lab instrents are used to determe the quality parameter noted: Las Navas TGA2000 EltraCS530 Par 6300 Calorimeter Perkin-Elmer A-analyst Thermoline Ash Fusion System Moistu, ash Sulfu Heating value Sodium, iron and calcium oxides Ash fusion temperatues The Black Butte Mine analyzes its samples at its own on-site lab operated by SGS. Black Butte analyzes for moisture, ash, sulfu, heating value, and sodium oxide. The Black Butte lab has similar instrentation to the Bridger lab, but rus moiste and ash manually, rather th with a TGA. P AC-E-1 0-07/Rocky Mountan Power September 1, 2010 IPUC Production Data Request 240 By contract with Kiewit Ming/lack Butte, the offcial quaity is determined by their analysis of their train coal sample. For Leucite Hils Mine coal deliveries Black Butte's coal lab anyzed the Bridger Plant's sample to determine offcial contract quality. The Leucite Hils Mine was closed at the end of 2009. Recordholder: Sponsor: Brian Durg Cindy Crae P AC-E-1 0-07/Rocky Mountain Power September 1, 2010 IPUC Production Data Request 241 IPUC Production Data Request 241 The next three questions relate to Bridger: Where in the coal supply pipeline is quaity measured? (i.e. upon delivery from each of the the sources, prior to blending, afer blending, upon delivery to the generation plant?) Response to IPUC Production Data Request 241 Bured coal samples at the Jim Bridger Plant are collected either automatically by the 05 mechancal sampling system, or manualy at intervals durg each shift from the Stock feeders at each unt. The 05 system is located in the coal yard on a conveyor sending blended coal to the coal gallery for unts 1-3. Manua samples (the only sampling method for unt 4) are collected from the feeders upstream of coal pulverizers. Coal received from the Bridger Mine is sampled for each shift using a mechancal sampler located on the main conveyor to the Bridger Plant. In addition to the coal sapling, coal on-line anyzers ar utilized by the mie and the plant to provide real time data. These analyzers are located just off the underground longwall minig unt, outside the underground port downstream of the coal silos, and at the power plant prior to coal delivery to the unts. Each train received from Black Butte Mine is sapled at the mie by a mechancal sampler. Some check samples of the trai coal ar also collected at the Bridger Plant using the 01 mechacal sampler. Coal received from the Kiewit Ming/eucite Hils Mine though 2009 was delivered by trck and sapled upon receipt at the Bridger Plant using the plant's 01 mechancal sampling system. Recordholder: Brian Durg Sponsor: Cindy Crane .' P AC-E-1O-07 /Rocky Mountain Power September 1, 2010 ¡PUC Production Data Request 242 IPUC Production Data Request 242 The next thee questions relate to Bridger: Please provide all coal quality measurement data for the period 2007 though 2010 to date. Please provide ths data in excel format. Response to IPUC Production Data Request 242 Please see Attachment IPUC 242. Coal quaity measurement data is provided as recorded by the Bridger Coal Company for tons shipped, Bridger Plant for tons consumed, Black Butte for tons shipped by rail, and Black Butte (Leucite Hils) for tons hauled. Recordholder: Brian Durng Sponsor: Cindy Crane . 1 P AC-E-1O-07 /Rocky Mountan Power September 1, 2010 ¡PUC Production Data Request 243 IPUC Production Data Request 243 The next four questions relate to the External Auditor workpapers review: Please provide a list of all Berkshire Hathaway affliate companes. Please provide ths in excel format simlar to the data found in external auditor workpapers at http://idoc.pacificorp.us/File/File64231.xls Response to IPUC Production Data Request 243 Please refer to Attchment IPUC 243. Recordholder: Sponsor: Ryan Weems To Be Determined .' PAC-E-10-07/Rocky Mountain Power September 1, 2010 IPUC Production Data Request 244 IPUC Production Data Request 244 The next four questions relate to the External Auditor workpapers review: How many Pcards are issued to PacifiCorp employees? Response to IPUC Production Data Request 244 As of December 31, 2009 and July 31,2010, there were 938 active purchase cards. A purchase card, commonly called a P-card, is a credit card used to pay for low-dollar, low-risk purchases of goods or services for Company business; it is not used for travel. Recordholder: Sponsor: Gar Tawwater Henr Lay P AC-E-1 0-07/Rocky Mounta Power September 1, 2010 IPUC Production Data Request 245 IPUC Production Data Request 245 The next four questions relate to the Extern Auditor workpapers review: What is the status of the non-public investigation by the FERC into the power outae of September 2008? Response to IPUC Production Data Request 245 The requested inormation is provided as Confdential Atthment IPUC 245. Ths information is confdential and is provided subject to the ters and conditions of the protective agreement in ths proceeding. Recordholder: Sponsor: Natalie Hocken To Be Determined P AC-E-1 0-07/Rocky Mountan Power September 1, 2010 IPUC Production Data Request 246 IPUC Production Data Request 246 The next four questions relate to the External Auditor workpapers review: Has there been any buyback of unused persona time from senior management included in the test year? Response to IPUC Production Data Request 246 In 2009, as par of the company's anua review of benefit progrs, a realgnent of its personal time program was developed and communcated to all employees with an effective date of Janua 1,2010. As par of this alignent, employees who ha personal time balances in excess of their anua accru cap received a one-time payment of up to 40 hours in excess of their cap (these hour were removed from their overall balances). Note ths plan is for all employees and is not segmented by employee grouping (i.e. Senior Mangement). The cost of the buyback included in the test year is $948,572 on a total Company basis. Ths expense is combined with all other labor and benefit expenses before being allocated to jursdictions. As a result, these costs are not directly available on an Idaho allocated basis. However, ths expense can be calculated using the Idaho allocation of tota utilty labor in the test year of approximately 5.537%. The calculation shown below detals the amount of Idaho allocation of ths expense in the test year. Tota Company $948,572 $271,927 $676,645 $37,466 Non-Utilty / Capita Portion (28.667%) Utilty Labor Porton Idaho Allocation (5.537%) Recordholder: Sponsor: Erich Wilson To Be Determined I 1 P AC-E-1 0-07/Rocky Mountain Power September 1, 2010 IPUC Production Data Request 247 IPUC Production Data Request 247 In 2009, how many service connections were performed in Idao durg reguar offce hour? Response to IPUC Production Data Request 247 2009 New Constrctionlew Meter Sets work requests Weekdays: 1800 completed and 121 intiated in 2009 stil open. Open work requests are dependent on such issues as permitting, inspections, etc. 2009 New Power for New Customers at Existig Sites work requests Weekdays: 1111 completed and 43 connected on weekdays outside of reguar business hours 8 am to 5 pm. Hours of completion outside of normal business hours 8 am to 5 pm are not tracked. Recordholder: Sponsor: Valerie Smith To Be Determned ~, P AO..E-l 0-07/Rocky Mountan Power September 1, 2010 IPUC Production Data Request 248 IPUC Production Data Request 248 In 2009, how many service connections were performed in Idao between the hours of 4:00pm and 5:00pm, Monday through Friday, excluding holidays? Response to IPUC Production Data Request 248 Generally, most New Construction/ew Meter Sets and New Power for New Customers at Existing Sites are connected durg regular offce hours Monday through Friday. Requests are not tracked by hourly tie-staps. Please see response to IPUC Request No. 247. Recordholder: Sponsor: Valerie Smith To Be Determined ." PAC-E-I0-07/Rocky Mountain Power September 1, 2010 IPUC Production Data Request 249 IPUC Production Data Request 249 In 2009, how many service connections were performed in Idao between the hours of 5:00pm and 7:00pm Monday though Friday, excluding holidays? Response to IPUC Production Data Request 249 Generally, most New Constrctionlew Meter Sets and New Power for New Customers at Existing Sites are connected durg reguar offce hours Monday though Friday. Requests are not tracked by hourly time-staps. Please see response to IPUC Request No. 247. Recordholder: Sponsor: Valerie Smith To Be Determed ,.J'PAC-E-10-07/Rocky Mountain Power September 1, 2010 IPUC Production Data Request 250 IPUC Production Data Request 250 In 2009, how many service connections were performed in Idao after 7:00pm and before reguar offce hours began the following morng? Response to IPUC Production Data Request 250 Generally, most New Constrctionlew Meter Sets and New Power for New Customers at Existing Sites are connected durng regular offce hours Monday though Friday. Requests are not trcked by hourly time-staps. Please see response to IPUC Request No. 247. Recordholder: Sponsor: Valerie Smith To Be Determed ... r P AC-E-1 0-07/Rocky Mountan Power September 1,2010 IPUC Production Data Request 251 IPUC Production Data Request 251 In 2009, how many service connections were performed in Idao on weekends and holidays? Response to IPUC Production Data Request 251 2009 New Constrctionlew Meter Sets work requests Weekend: 8 Holidays: 1 2009 New Power for New Customers at Existing Sites work requests Weekends: 4 Holidays: 0 Recordholder: Sponsor: Valerie Smith To Be Determined