HomeMy WebLinkAbout20100901PAC to PIIC 1.pdf"
~~;~OUNTAIN RECE n
28lUSEP - l AM 9: 31
201 South Main, Suite 230
salt Lake City. Utah 84111
August 31, 2010
Melinda Davison
Davison Van Cleve, P.C.
333 S.W. Taylor St., Ste. 400
Portland, Oregon 97204
Radall J. Falenberg
RFI Consulting, Inc.
PMB362
8343 Roswell Road
Sandy Sprigs, GA 30350
RE: ID PAC.E.1O-07
PILC Data Request (1)
Please fid enclosed Rocky Mounta Power's response to PILC Data Request 1. Provided on
the enclosed Confdential CD ar Confdential Attachments PUC 1.1 -(1-2). The atthments
are being provided to the requesting par only. The Confdential Attchments are Confdential
and are provided to paries th have signed a protective order in ths docket.
If you have any questions, pleae feel free to call me at (801) 220-2963.
Sincerely,
;r IJd Iva~/~
J. Ted Weston
Mager, Regulation
Enclosur:
cc: Jea JewellUC (C)/ 3 copies
Eric OlsenlPA (C)
Ben OtIICL (C)
Radal BudgelMonsanto (C)
James R. Smithonsato (C)
Richad AndersonIonsto (C)
Gerge C. Carer, IlIIonsanto (C)
Denns PeseauIonsanto (C)
Ga R. KajanderlMonsto (C)
Maurce BrubakerlMonsanto (C)
Bri Collonsanto (C)
Michal Gormonsto (C)
Ka IversnIonsto (C)
Mar WidmerlMonsto (C)
PAC-E-I0-07/Rocky Mountain Power
August 31, 2010
PILC Data Request 1.1
PIIC Data Request 1.1
Please provide a working copy of the GRID model and complete access to
Randall Falkenberg.
Response to PIIC Data Request 1.1
Please refer to Confdential Attchment PILC 1.1 -1 for the requested GRID
project, and Confdential Attachment PILC 1.1 -2 for the Excel net power cost
spreadsheet. Per e-mail exchanges.Mr. Falkenberg may install the GRID project
for the curent proceeding on the GRID access that was assigned to him in the
Company's Oregon Transition Adjustment Mechanism (VE 216) and the
Washington General Rate Case (UE-100749). Confdential information is
provided subject to the terms and conditions of the protective order in this
proceeding.
Recordholder:
Sponsor:
Hui Shu
Hui Shu
.ì,
.'1