Loading...
HomeMy WebLinkAbout20100901PAC to PIIC 1.pdf" ~~;~OUNTAIN RECE n 28lUSEP - l AM 9: 31 201 South Main, Suite 230 salt Lake City. Utah 84111 August 31, 2010 Melinda Davison Davison Van Cleve, P.C. 333 S.W. Taylor St., Ste. 400 Portland, Oregon 97204 Radall J. Falenberg RFI Consulting, Inc. PMB362 8343 Roswell Road Sandy Sprigs, GA 30350 RE: ID PAC.E.1O-07 PILC Data Request (1) Please fid enclosed Rocky Mounta Power's response to PILC Data Request 1. Provided on the enclosed Confdential CD ar Confdential Attachments PUC 1.1 -(1-2). The atthments are being provided to the requesting par only. The Confdential Attchments are Confdential and are provided to paries th have signed a protective order in ths docket. If you have any questions, pleae feel free to call me at (801) 220-2963. Sincerely, ;r IJd Iva~/~ J. Ted Weston Mager, Regulation Enclosur: cc: Jea JewellUC (C)/ 3 copies Eric OlsenlPA (C) Ben OtIICL (C) Radal BudgelMonsanto (C) James R. Smithonsato (C) Richad AndersonIonsto (C) Gerge C. Carer, IlIIonsanto (C) Denns PeseauIonsanto (C) Ga R. KajanderlMonsto (C) Maurce BrubakerlMonsanto (C) Bri Collonsanto (C) Michal Gormonsto (C) Ka IversnIonsto (C) Mar WidmerlMonsto (C) PAC-E-I0-07/Rocky Mountain Power August 31, 2010 PILC Data Request 1.1 PIIC Data Request 1.1 Please provide a working copy of the GRID model and complete access to Randall Falkenberg. Response to PIIC Data Request 1.1 Please refer to Confdential Attchment PILC 1.1 -1 for the requested GRID project, and Confdential Attachment PILC 1.1 -2 for the Excel net power cost spreadsheet. Per e-mail exchanges.Mr. Falkenberg may install the GRID project for the curent proceeding on the GRID access that was assigned to him in the Company's Oregon Transition Adjustment Mechanism (VE 216) and the Washington General Rate Case (UE-100749). Confdential information is provided subject to the terms and conditions of the protective order in this proceeding. Recordholder: Sponsor: Hui Shu Hui Shu .ì, .'1