Loading...
HomeMy WebLinkAbout20100810PAC to Staff 109, 111.pdf~ROCKY MOUNTAIN POWER A DIION OF PAFlCO RECE 201 Sout Main, Suite 2300 Salt Lake City. Utah 84111 inl~AUG \ 0 AM 9: '1 August 9,2010 Scott Woodbur Idaho Public Utilties Commssion 472 W. Washington Boise, ID 83.702-5918 Neil Price Idaho Public Utilities Commssion 472 W. Washington Boise, ID 83702-5918 RE: ID PAC-E-10-07 IPUC Data Requests (77-111) Please find enclosed Rocky Mountan Power's responses to IPUC Data Requests 109 and 111. Provided on the enclosed CD is Attachment IPUC 109. If you have any questions, please feel free to call me at (801) 220-2963. Sincerely, Td.w~/UC J. Ted Weston Manager, Regulation Enclosure: C.c. Rady BudgelMonsanto Jean Jewell/UC Eric OlsenlIP A Ben Otto/ICL PAC-E-IO-07/Rocky Mountain Power August 9, 2010 IPUC Production Data Request 109 IPUC Production Data Request 109 For each of the wind resources, piêå.se identify the ongoing operation and maintenance costs associated witheåch project. Response to IPUC Production Data Request 109 Please refer to Attachment OPUC 109 for the O&M cost detail for the wind resources which were included in the filing. Please also refer to the Incremental Generation O&M Adjustment No. 4.6 inçluded in the exhibit accompanying the direct testimony of Steven R. McDougat Recordholder: Sponsor: Brian Dickman Steven R. McDougal tJt PAC-E-1O-07/Rocky Mountain Power August 9,2010 IPUC Production Data Request 111 IPUc Production Data Request 111 Please discuss any assurces PacifiCorp can provide that all BOT projects will provide generation amounts on an ongoing basis that is consistent with the assumptions made in the selection process for each resource. Response to IPUc Production Data Request 111 The Company has acquired build own transfer (BOT) and power purchase agreement (PP A) wind resources via the renewable request for proposal (RFP) process. The Company has thus far been unble to receive contractual assurances associated with BOT generation levels. With respect to PP A generation levels, the Company has been able to negotiate varing levels of contractu assurances associated with mechanical availabilty based daage mechansms as well as other negotiated contrctua assurances that var by agreement. Recordholder: Sponsor: Mark Tallman Stefan Bird