August 9,2010
Scott Woodbur
Idaho Public Utilties Commssion
472 W. Washington
Boise, ID 83.702-5918
Neil Price
Idaho Public Utilities Commssion
472 W. Washington
Boise, ID 83702-5918
RE: ID PAC-E-10-07
IPUC Data Requests (77-111)
Please find enclosed Rocky Mountan Power's responses to IPUC Data Requests 109 and 111.
Provided on the enclosed CD is Attachment IPUC 109.
If you have any questions, please feel free to call me at (801) 220-2963.
Sincerely,
Td.w~/UC
J. Ted Weston
Manager, Regulation
Enclosure:
C.c. Rady BudgelMonsanto
Jean Jewell/UC
Eric OlsenlIP A
Ben Otto/ICL
PAC-E-IO-07/Rocky Mountain Power
August 9, 2010
IPUC Production Data Request 109
IPUC Production Data Request 109
For each of the wind resources, piêå.se identify the ongoing operation and
maintenance costs associated witheåch project.
Response to IPUC Production Data Request 109
Please refer to Attachment OPUC 109 for the O&M cost detail for the wind
resources which were included in the filing. Please also refer to the Incremental
Generation O&M Adjustment No. 4.6 inçluded in the exhibit accompanying the
direct testimony of Steven R. McDougat
Recordholder:
Sponsor:
Brian Dickman
Steven R. McDougal
tJt
PAC-E-1O-07/Rocky Mountain Power
August 9,2010
IPUC Production Data Request 111
IPUc Production Data Request 111
Please discuss any assurces PacifiCorp can provide that all BOT projects will
provide generation amounts on an ongoing basis that is consistent with the
assumptions made in the selection process for each resource.
Response to IPUc Production Data Request 111
The Company has acquired build own transfer (BOT) and power purchase
agreement (PP A) wind resources via the renewable request for proposal (RFP)
process. The Company has thus far been unble to receive contractual assurances
associated with BOT generation levels. With respect to PP A generation levels,
the Company has been able to negotiate varing levels of contractu assurances
associated with mechanical availabilty based daage mechansms as well as
other negotiated contrctua assurances that var by agreement.
Recordholder:
Sponsor:
Mark Tallman
Stefan Bird