Monsanto Data Request Set 7 (1-5)
Please fid enclosed Rocky Mounta Power's responss to Monsanto Data Requests 7.1-7.5.
Provided on the enclosed CD are Atthments Monsanto 7.1 and 7.4. Provided on the enclosed
Confdential CD is Confdential Atthment Monsanto 7.5. The Confdential Attchment is
Confdential and is provided to pares that have signed a protective order in ths docket.
If you have any questions, please feel free to call me at (801) 220-2963.
Sincerly,T~~~/~
J. Ted Weston
Manger, Reguation
Enclosure:
C.c: James R. Smith
Richad Anderson
George C. Carer, III
Denns Peseau
Gareth R. Kajander
Mauce Brubaker
Brian Collins
Michal Gorm
Kath Iverson
Mak Widmer
Erc L. Olse
Jea Jewell
Ben Ott
PAC-E- 1 0-07/Rocky Mountain Power
August 9, 2010
Monsanto Data Request 7.1
Monsanto Data Request 7.1
Referrng to page 10.13 Gurisdictional allocations) of Steve McDougal's exhibits,
please provide a detailed narative explaiation and workpapers for the reductions
to Utah aÌd Idaho loads in several months. .
Response to Monsanto Data Request 7.1
Please refer to Attachment Monsanto 7.1. Jurisdictional loads are adjusted on
page 10.13 in order to properly reflect the impact of special contracts and demand
side management programs consistent with the Revised Protocol allocation
methodology. Treatment of special contract loads is prescribed in Appendix D of
the Revised Protocol. Demand side management programs are defined as State
Resources according to the Revised Protocol, and the reduced consumption
resulting from such programs is to be reflected in the load based allocation
factors.
Recordholder:
Sponsor:
Brian Dickman
Steve McDougal
i:
',;
ì L
ij
¡;-
P AC-E-1 0-07/Rocky Mountain Power
August 9, 2010
Monsanto Data Request 7.2
Monsanto Data Request 7.2
Referring to tab 5, page 6 (coincident peaks at input) of Craig Paice's exhibit,
please provide a detailed narrative explanation and workpapers for the derivation
of the CP demands for each class where an adjustment was made on page 10.13 of
Steve McDougal's exhibit.
Response to Monsanto Data Request 7.2
The Company's response to lIP A Data Request 8 explains that customer class
loads shown in Exhibit 49, Tab 5, page 6 and Idaho jurisdiction loads in Exhibit 2,
page 10.13 are developed from different data sources and used for different
puroses. Also, please refer to the Company's response to Monsanto Data
Request 7.3.
!,'
Please refer to Attchment LIP A 8a for support for customer class loads and
Attachment liP A 1 (f) for support for Idaho jurisdiction loads.
Recordholder:
Sponsor:
C. Craig Paice
C. Craig Paice
.!.
P A C- E-1 0-07/Rocky Mountain Power
August 9, 2010
Monsanto Data Request 7.3'
Monsanto Data Request 7.3
Please provide a detailed reconciliation of the jurisdictional CP's on page 10.13 of
Steve McDougal's testimony and the sum of the class CP loads (noted as State of
Idaho) on tab 5, page 6 of Craig Paice's exhibit.
Response to Monsanto Data Request 7.3
The Jursdictional coincident peaks on page 10.13 of Steve McDougal's
testimony are for the test period ending December 31, 2010. These show the
projected monthly system peaks for 2010.
The sum of the class CP loads (noted as State of Idaho) on tab 5, page 6 of Craig
Paice's exhibit are based on 2009 load research data, ratioed up or down to reflect
test year 2010 monthly energy levels. This is tre for all schedules except
Contract 1 and Schedule 10 customers. Both the Contract 1 and Schedule 10
customer estimates have been normalized over a period of years, based on the
historical load research data, before adjustment to test year 2010 monthly energy
levels. The "Month" and "Peak Date" and "Peak Time" headings at the top of the
workpaper are for calendar year 2009.
Recordholder:
Sponsor:
Brian Dickman / C. Craig Paice
Steve McDougal I C. Craig Paice
) I .; ~ '. 1
.\
P AC-E-1 0-07/Rocky Mountain Power
August 9, 2010
Monsanto Data Request 7.4
Monsanto Data Request 7.4
With respect to the three turbine upgrade projects (Hunter Unit 1 , Huntington
Unit 1 and Jim Bridger Unit 1) described at pp. 12-13 of Mr. Teply's testimony,
please provide the following information for each turbine upgrade project:
a. The cost in $/kW for the turbine upgrade project.
b. The economic analysis upon which the Company relied to proceed with
the tubine upgrade project. Include all work papers in Excel format with
formulas intact.
c. A copy of the Company's expenditue requisition and project approval
documents for the turbine upgrade project.
d. All references (with page numbers) to the turbine upgrade project in the
Company's most recent Integrated Resource Plan (IRP). If the turbine
upgrade project was not included in the Company's most recent IRP,
please explain why not.
Response to Monsanto Data Request 7.4
a. The installed costs in $/kw for the Turbine Upgrades are as follows:
Hunter 1
Huntington 1
Jim Bridger 1
$1,988
$1,725
$1,583
The $/kw shown above for th~ HIr Bridger 1 Turbine Upgrade is based on
the original approval docÚIept, wliich included the high pressure,
intermediate pressure, and low pressure (HP/IPlLP) components as a
single project. Subsequent to the original approval, the LP portion of the
project was deferred to 2018.
b. Please refer to Attachments Monsanto 7.4b -1, Monsanto 7.4b -2, and
Monsanto 7.4b -3. The information provided in these attachments is the
non-confdential portion of tlte aIalysis. Other information to which the
formulas may refer is infornåtionthat the Company considers proprietary
and highly confidentiaL. If desired, this additional information can be
made available on site at a future date.
c. Please refer to Attachments Monsanto 7.4c -1, Monsanto 7.4c -2,
Monsanto 7.4c -3, and Monsanto 7.4c -4.
d. The turbine upgrades are mentioned on the following pages of the 2008
IRP, with most portfolio tables including these as resource additions.
. Main Text: 6, 90, 96
. Resource Portfolio Tables: 10, 114,243,245,254
. Footnotes: 181, 182, 189'
,.
.1..:"
1';
PAC-E-1O-07/Rocky Mountain Power
August 9, 2010
Monsanto Data Request 7.4 .. ,
The turbine upgrades are also included in PacifiCorp's 2008 IRP Update,
fied with the Idaho commission on March 31, 2010.
Recordholder:
Sponsor:
Chad A. Teply
Chad A. Teply
:.!i
. ~.
. \.
P AC-E-1 0-07/Rocky Mountain Power
August 9, 2010
Monsanto Data Request 7.5
Monsanto Data Request 7.5
Please provide the work papers supporting Figure 4.1 - Henry Hub Natural Gas
Prices (Nominal) shown on p. 37 of the Company's 2008 Update - Integrated
Resource Plan (dated March 31, 2010). Please include in the response the annual
natual gas prices for the period 2010-2030 used for both the October 2008 and
September 2009 plot lines shown in Figure 4.1.
Response to Monsanto Data Request 7.5
The Company objects to providing the information as requested on the basis that
it is outside the scope of the Idaho GRC. Without waiving this objection, please
refer to Confidential Attachment Monsanto 7.5, which contains the requested
information for the test period in the GRC (2010). Confidential information is
provided subject to the terms and conditions of the protective agreement in this
proceeding.
Recordholder:
Sponsor:
Rick Link
Hui Shu
'i i ,:. ,
,I