July 19,2010
Eric L. Olsen ISB# 4811
RACINE, OLSON, NYE, BUDGE &
BAlLEY, C~TERED
P.O. Box 1391; 201 E. Center
Pocatello, Idaho 83204-1391
RE: ID PAC-E-10-07
IIPA Data Request (1-53)
201 South Main, Sute 2300
Salt Lake City, Ut 84111
Please find enclosed Rocky Mounta Power's responses to lIP A Data Requests 11, 24, and 30
and Supplemental Response to IIPA 12. Provided on the enclosed CD are Attchments IIPA 11
-(1-2), and 12 -(1-2) 1st Supplementa. Provided on the enclosed Confdential CD ar
Confdential Attchments LIP A 11 -3 and 24c. Confdential Attachments are Confdential and
are provided to paries that have signed a protective order in this docket.
If you have any questions, please feel free to call me at (801) 220-2963.
Sincerely,
J. Tg¡l lV~/~
J. Ted Weston
Manager, Regulation
Enclosure:
C.c. Randy BudgelMonsanto
Michael C. Creamer/ Agrum
Jean Jewell/UC
Anthony Yanel
Ben Otto
, ..
P AC-E-1 0-07/Rocky Mountain Power
July 19,2010
LIP A Data Request 11
LIP A Data Request 11
Please provide in electronic formt a listing of the date, time, and estimated
magntude of all actual hourly curilments/interrptions that occured during
2008 through the most recent month available in Idaho separated by rate schedule
or special contract customer. If outrght curailments/interrptions are treated
differently than "buy-throughs", please state each separately.
Response to lIP A Data Request 11
Please refer to Attchments lIP A 11 -1 and LIP A 11 -2 for date, time and
estimated magntude of hourly curlments/interrptions tht occured durg
2008 and 2009 pursuat to the Idaho Irrgation Load Control Programs. Through
June, 2010 there has been only one curlment under the Idao irgation load
management progra (June 29, 2010). The magntude of the curilment ha yet
to be quatified in a report.
Also please refer to Confdential Attchment LIP A 11 -3 for the hourly Monsanto
curilment and buy-through. Confdential information is provided subject to the
terms and conditions of the protective order in ths proceeding.
Recordholder:
Sponsor:
Jeff Bumgarer / RomIta Biswas
To Be Determined
t..j.
P AC-E-l 0-07/Rocky Mountan Power
July 19,2010
LIP A Data Request 12 - 1 st Supplemental Response
LIP A Data Request 12
Please provide in electronic format a listing of the date, time, and estimated
magntude of all actul hourly curailments/interrptions that occured during
2008 though the most recent month available in each of the other jursdictions. If
outrght curailments/interrptions are treated differently than "buy-thoughs",
please state each separately.
1 st Supplemental Response to lIP A Data Request 12
Please refer to Attchment LIP A 12 -1 1 st Supplemental for event dates, times and
estimated magtude of hourly curlments/interrptions associated with Uta's
air conditioner load management program for 2008 though June 2010 and
Attachment LIP A 12 _21st Supplementa for event dates, times and estimated
magntude of hourly curilments/interrptions associated with Uta's irigation
load management progr, Schedule 96A (Schedule 96 is also included however
is not a dispatchable control option). In 2008 Uta's irrgation load management
program was not a dispatchable program and had less than 10 megawatt of
paricipation, 5 megawatts pre-scheduled off Monday-Thursday durg the
irrgation season, excluding holidays and weekends.
Recordholder:
Sponsor:
Jeff Bumgarer / Romita Biswas
To Be Determined
P AC-E-l 0-07/Rocky Mountain Power
July 19,2010
IIPA Data Request 24
LIP A Data Request 24
On page 9 beginnng on line 12 of Mr. Shu's testimony, it is indicated that the
NPC model uses hourly load as some of the inputs. In Excel format:
a. Pleas provide the hourly system retal load data that was used in the NPC
model that was used in ths case.
b. Please provide the hourly system retail load data that was used/adjusted for
uses in the NPC model to develop the data in "a" above.
c. Please provide the hourly Idaho retail load data tht was used in the NPC
model that was used in ths case.
d. Please provide the hourly Idaho Irrgation retal load data that was used in the
NPC model that was used in ths case.
e. Please provide the hourly market price data that was used in the NPC model
that was used in ths case.
Response to lIP A Data Request 24
a. The Company has provided lIP A with access to the GRID model on June 24,
2010 for delivery on June 25, 2010, which contains the hourly system retal
load data that was used in ths case, and can be extracted from the modeL.
b. Please refer to the Company's response to par a. above.
c. Please refer to Confdential Attchment lIP A 24c. Confdential inormation is
provided subject to the terms and conditions of the protective agreement in
ths proceeding.
d. The hourly retail loads are at the generator and are not separated by customer
class.
e. Please refer to the Company's response to par a. above.
Recordholder:
Sponsor:
Hui Shu / Romita Biswas
To Be Determined
PAC-E-I0-07/Rocky Mountain Power
July 19,2010
IIPA Data Request 30
LIP A Data Request 30
Please provide a history of all curilments and/or interrptions made to Monsanto
for the period Janua 1,2006 through the present. Please detail the time and date
of the curailment or interrption, the amount and reason (economic curlment,
operating reserves, system integrty, etc.).
Response to LIP A Data Request 30
Please refer to the Company's response to IIPA Data Request 11, specifically
Confdential Attchment IIPA 11 -3.
Recordholder:
Sponsor:
Romita Biswas
To Be Determned