Loading...
HomeMy WebLinkAbout20100720PAC to IIPA 11, 12, 24, 30.pdf, . ~ROCKY MOUNTAINPOERA DIVIO OF PARCP R r= C E... i!.::'.:.'\.-J_ . 2916 JUt 20 AMrD:' 5 July 19,2010 Eric L. Olsen ISB# 4811 RACINE, OLSON, NYE, BUDGE & BAlLEY, C~TERED P.O. Box 1391; 201 E. Center Pocatello, Idaho 83204-1391 RE: ID PAC-E-10-07 IIPA Data Request (1-53) 201 South Main, Sute 2300 Salt Lake City, Ut 84111 Please find enclosed Rocky Mounta Power's responses to lIP A Data Requests 11, 24, and 30 and Supplemental Response to IIPA 12. Provided on the enclosed CD are Attchments IIPA 11 -(1-2), and 12 -(1-2) 1st Supplementa. Provided on the enclosed Confdential CD ar Confdential Attchments LIP A 11 -3 and 24c. Confdential Attachments are Confdential and are provided to paries that have signed a protective order in this docket. If you have any questions, please feel free to call me at (801) 220-2963. Sincerely, J. Tg¡l lV~/~ J. Ted Weston Manager, Regulation Enclosure: C.c. Randy BudgelMonsanto Michael C. Creamer/ Agrum Jean Jewell/UC Anthony Yanel Ben Otto , .. P AC-E-1 0-07/Rocky Mountain Power July 19,2010 LIP A Data Request 11 LIP A Data Request 11 Please provide in electronic formt a listing of the date, time, and estimated magntude of all actual hourly curilments/interrptions that occured during 2008 through the most recent month available in Idaho separated by rate schedule or special contract customer. If outrght curailments/interrptions are treated differently than "buy-throughs", please state each separately. Response to lIP A Data Request 11 Please refer to Attchments lIP A 11 -1 and LIP A 11 -2 for date, time and estimated magntude of hourly curlments/interrptions tht occured durg 2008 and 2009 pursuat to the Idaho Irrgation Load Control Programs. Through June, 2010 there has been only one curlment under the Idao irgation load management progra (June 29, 2010). The magntude of the curilment ha yet to be quatified in a report. Also please refer to Confdential Attchment LIP A 11 -3 for the hourly Monsanto curilment and buy-through. Confdential information is provided subject to the terms and conditions of the protective order in ths proceeding. Recordholder: Sponsor: Jeff Bumgarer / RomIta Biswas To Be Determined t..j. P AC-E-l 0-07/Rocky Mountan Power July 19,2010 LIP A Data Request 12 - 1 st Supplemental Response LIP A Data Request 12 Please provide in electronic format a listing of the date, time, and estimated magntude of all actul hourly curailments/interrptions that occured during 2008 though the most recent month available in each of the other jursdictions. If outrght curailments/interrptions are treated differently than "buy-thoughs", please state each separately. 1 st Supplemental Response to lIP A Data Request 12 Please refer to Attchment LIP A 12 -1 1 st Supplemental for event dates, times and estimated magtude of hourly curlments/interrptions associated with Uta's air conditioner load management program for 2008 though June 2010 and Attachment LIP A 12 _21st Supplementa for event dates, times and estimated magntude of hourly curilments/interrptions associated with Uta's irigation load management progr, Schedule 96A (Schedule 96 is also included however is not a dispatchable control option). In 2008 Uta's irrgation load management program was not a dispatchable program and had less than 10 megawatt of paricipation, 5 megawatts pre-scheduled off Monday-Thursday durg the irrgation season, excluding holidays and weekends. Recordholder: Sponsor: Jeff Bumgarer / Romita Biswas To Be Determined P AC-E-l 0-07/Rocky Mountain Power July 19,2010 IIPA Data Request 24 LIP A Data Request 24 On page 9 beginnng on line 12 of Mr. Shu's testimony, it is indicated that the NPC model uses hourly load as some of the inputs. In Excel format: a. Pleas provide the hourly system retal load data that was used in the NPC model that was used in ths case. b. Please provide the hourly system retail load data that was used/adjusted for uses in the NPC model to develop the data in "a" above. c. Please provide the hourly Idaho retail load data tht was used in the NPC model that was used in ths case. d. Please provide the hourly Idaho Irrgation retal load data that was used in the NPC model that was used in ths case. e. Please provide the hourly market price data that was used in the NPC model that was used in ths case. Response to lIP A Data Request 24 a. The Company has provided lIP A with access to the GRID model on June 24, 2010 for delivery on June 25, 2010, which contains the hourly system retal load data that was used in ths case, and can be extracted from the modeL. b. Please refer to the Company's response to par a. above. c. Please refer to Confdential Attchment lIP A 24c. Confdential inormation is provided subject to the terms and conditions of the protective agreement in ths proceeding. d. The hourly retail loads are at the generator and are not separated by customer class. e. Please refer to the Company's response to par a. above. Recordholder: Sponsor: Hui Shu / Romita Biswas To Be Determined PAC-E-I0-07/Rocky Mountain Power July 19,2010 IIPA Data Request 30 LIP A Data Request 30 Please provide a history of all curilments and/or interrptions made to Monsanto for the period Janua 1,2006 through the present. Please detail the time and date of the curailment or interrption, the amount and reason (economic curlment, operating reserves, system integrty, etc.). Response to LIP A Data Request 30 Please refer to the Company's response to IIPA Data Request 11, specifically Confdential Attchment IIPA 11 -3. Recordholder: Sponsor: Romita Biswas To Be Determned