HomeMy WebLinkAbout20090106PAC to IIPA 36-44.pdfRECE
201 South Main. Suite 2300
Salt Lake City. Utah 84111~2~!o~OUNTAIN 2009 JAN -6 Plî /2: 50
December 31, 2008
Eric Olsen
Idaho Irrigation Pumpers Assoc
Racine, Olsen, Nye, Budge & Bailey
201 East Center
Pocatello, ID 83204
RE: PAC-E-08-07
IIPA Data Request (36-44)
Please find enclosed Rocky Mountain Power's Responses to lIPA Data Requests 36 - 44.
Provided on the enclosed CD are Attachments lIPA 36, 37,38, 39b, 40 -(a,d), 41, 43 -(1-2), and
44 -(1-2).
If you have any questions, please feel free to call me at (801) 220-2963.
Sincerely,
~ltu~/~
Ted Weston,
Manager, Regulation
Enclosures
PAC-E-08-07/Rocky Mountain Power
December 31, 2008
IIPA Data Request 36
LIP A Data Request 36
Please provide a copy of the Company's jurisdictional allocation model(s) and its
class cost of service study in Excel format with all formula's intact.
Response to lIP A Data Request 36
Please refer to Attachment liP A 36.
IDAHO
P AC-E-08..07
2008 GENERAL RATE CASE
ROCKY MOUNTAIN POWER
IIPA DATA REQUEST (36-44)
ATTACHMENT lIP A 36
ON THE ENCLOSED CD
PAC-E-08-07/Rocky Mountain Power
December 31, 2008
lIP A Data Request 37
IIPA Data Request 37
For each month for which the Company does not have load research data for the
Irrigation class, please explain how the monthly system coincident peak used on
Exhibit 22, Tab 5, page 7 and the monthly Distribution peaks used on Exhibit 22,
Tab 5, page 12 are derived. Please provide the raw data used to establish these
non-load research based data.
Response to LIP A Data Request 37
For all irrigation non-season months where load research data is not available,
monthly System coincident peaks and monthly Distribution peaks are derived
assuming a 100% load factor for each hour of the month. Peaks are calculated by
dividing the total monthly class kWh by the number of hours in the month. Please
refer to Attachment lIPA 37.
Note: Exhibit 22, Tab 5, page 7 is at Sales Level and Exhibit 22, Tab 5, page 12
is at Input leveL.
IDAHO
P A C- E-08-07
2008 GENERAL RATE CASE
ROCKY MOUNTAIN POWER
IIPA DATA REQUEST (36-44)
ATTACHMENT IIPA 37
ON THE ENCLOSED CD
PAC-E-08-07/Rocky Mountain Power
December 31, 2008
nPA Data Request 38
IIPA Data Request 38
Please explain the methodology and provide the underlying data used to develop
the non-coincident peak data used on Exhibit 22, Tab 5, page 13 for all rate
schedules.
Response to lIP A Data Request 38
Three methodologies are used to estimate non-coincident peak data:
1. KW/Cust MPU * Population (this method is available for samples where 15
minute data is collected).
2. NCP/Schedule Peak, 3 Yr. Ratio (this method is used for samples where 60
minute data is collected).
3. 100% Load Factor (used for street lighting and non-season irrgation months).
Irrigation on-season and Schedule 006 used method 1. Non-season irrigation
and street lighting used method 3. All other schedules used method 2.
Please refer to Attachment LIP A 38, which provides the underlying data used to
develop non-coincident peak data for all rate schedules.
IDAHO
PAC-E-08-07
2008 GENERAL RATE CASE
ROCKY MOUNTAIN POWER
iip A DATA REQUEST (36-44)
ATTACHMENT ~~p A 38
ON THE ENCLOSED CD
P AC-E-08-07 /Rocky Mountain Power
December 31, 2008
LIP A Data Request 39
LIP A Data Request 39
With respect to the distribution peak data listed on Exhibit 22, Tab 5, page 12,
please provide the following:
a. The loss factors that are applied to each rates schedule listed;
b. The hourly distribution value for each hour for 2005-07 in electronic format;
c. The estimated hourly impact upon the distributions values listed in b above,
due to the impact of the Irrgation load management programs.
Response to lIP A Data Request 39
a. Secondary loss factor 14.668%
Primar loss factor 10.418%
Transmission loss factor 5.697%
b. Please refer to Attachment IIPA 39b.
c. This analysis has not been performed.
IDAHO
P AC-E-08-07
2008 GENERAL RATE CASE
ROCKY MOUNTAIN POWER
IIPA DATA REQUEST (36-44)
ATTACHMENT IIPA 39b
ON THE ENCLOSED CD
PAC-E-08-07/Rocky Mountain Power
December 31, 2008
LIP A Data Request 40
LIP A Data Request 40
With respect to the data used to establish the Substation Peaks weighting factors
on the top of page 1 i of Tab 5 of Exhibit 22, please provide the following;
a. The name of each substation used in the analysis;
b. The MW of peak recorded at each substation;
c. The time and date of the peak of each substation;
d. The original cost of the substation or any cost value that is available on the
Company's property records; and
e. A list of all substations not included in the analysis and the reason for the non-
inclusion.
Response to IIPA Data Request 40
a. Please refer to Attachment IIPA 40a; which provides the name of each
substation, MW of peak recorded and time/date of peak.
b. Please refer to the Company's response to subpar a above.
c. Please refer to the Company's response to subpart a above.
d. Please refer to Attachment lIP A 40d.
e. All Idaho substations are included in the analysis except for two hydro
substations, marked with "#" in Attachment LIP A 40a. These substations were
excluded because they are used in hydro generation and do not serve customer
load.
IDAHO
P AC-E-08-07
2008 GENERAL RATE CASE
ROCKY MOUNTAIN POWER
IIPA DATA REQUEST (36-44)
ATTACHMENT IIPA 40 -(a,d)
ON THE ENCLOSED CD
PAC-E~08-07/Rocky Mountain Power
December 31, 2008
lIP A Data Request 41
LIP A Data Request 41
Please provide a listing by size the number of the line transformers that are
presently used in the field to service customers. If available, please list the
customer type (Res, Comm, Irr, Ind, other) that is served.
Response to LIP A Data Request 41
Please refer to Attachment lIP A 41, Tab i, for a list of line transformers by size
and type of customer served for the State of Idaho.
IDAHO
P AC-E-08-07
2008 GENERAL RATE CASE
ROCKY MOUNTAIN POWER
lIP A DATA REQUEST (36-44)
ATTACHMENT LIP A 41
ON THE ENCLOSED CD
P AC-E-08-07/Rocky Mountain Power
December 3 i, 2008
LIP A Data Request 42
LIP A Data Request 42
Please provide a listing by size the number of single phase line transformers that
are grouped for a single customer that are presently used in the field to service 3-
phase customers.
Response to lIP A Data Request 42
Please refer to the Company's response to LIP A Data Request 41; specifically
Attachment lIP A 4 i, Tab 2, for a listing by size the number of single phase line
transformers that are grouped together in the field to service 3-phase customers.
PAC-E-Og-07/Rocky Mountain Power
December 31, 2008
LIP A Data Request 43
LIP A Data Request 43
What size range of line transformers are normally used to serve residential load?
Response to lIP A Data Request 43
Please refer to Attachments IIPA 43 -1 and LIP A 43 -2 for detail of standard line
transformer sizes and transformer sizing criteria.
IDAHO
PAC-E-08-07
2008 GENERAL RATE CASE
ROCKY MOUNTAIN POWER
IIPA DATA REQUEST (36-44)
ATTACHMENT IIPA 43 -(1-2)
ON THE ENCLOSED CD
P AC-E-08-07/Rocky Mountain Power
December 31, 2008
LIP A Data Request 44
LIP A Data Request 44
For new line transformers that have been ordered by the Company over the last
few years (for any of the jurisdictions), please provide a typical price for each size
and type of line transformers. This data is being requested in relationship to the
typical sizes and types of line transformers listed in 41 above and need only
reflect these types of line transformers.
Response to liP A Data Request 44
Please refer to Attachments IIPA 44 -i and IIPA 44 -2 for detail of the typical
cost for multiple sizes of line transformers.
. c .
IDAHO
P AC-E-08-07
2008 GENERAL RATE CASE
ROCKY MOUNTAIN POWER
IIPA DATA REQUEST (36-44)
ATTACHMENT IIPA 44 -(1-2)
ON THE ENCLOSED CD