Loading...
HomeMy WebLinkAbout20080801PAC responses to Utah.pdf..~. ROCKY MOUNTAIN POWERADMOFPA 201 Soth Main, Suite 2300 Salt lake City, Uth 841 i I l~ July 3 t, 2008 Dennis Miler Division of Public Utilties Heber M. Wells Bldg - 4th Floor 160 E 300 S - Box 146751 Salt Lae City, UT 84114-6751 PAC~Ë- -08 -03 RE: UT Docket No. 08-035-42 DPU 4th Set Data Request (1-5) Please find enclosed Rocky Mountan Power's Responses to DPU 4th Set Data Requests 4.1 - 4.5. Provided on the enclosed CD are Attchments DPU 4.2 and 4.5 -(1-3). If you have any questions, please call Bar Bell at (801) 22Q.985. Sincerely, l)Mt~(Pì~ Dave Taylor Manager, Regulation Enclosure cc: Cheryl Mury/CCS 08-035-42/Rocky Mountain Power July 31, 2008 DPU Data Request 4.1 DPU Data Request 4.1 Please provide an update to the Company's last estimated costs of this project. Have the estimated costs changed since the Company's last statement of cost for this project? What are the curently estimated costs for this Project? Response to DPU Data Request 4.1 The information provided in response to DPU 1.31 is the most recent information until an updated estimate is completed. The updated estimate is due for completion during the last week of August 2008. 08-035-42/Rocky Mountain Power July 3 l, 2008 DPU Data Request 4.2 DPU Data Request 4.2 The Division is not making any determination of prudence, cost recovery, or cost allocation in this docket. However, if all costs of the Project were to be included in the Company's current revenue requirement, what would be the estimated impact on the Company's Utah's rates? Response to DPU Data Request 4.2 An estimate of the impact on Uta rates is provided in Attachment DPU 4.2 08-035-42/Rocky Mountain Power July 31, 2008 DPU Data Request 4.5 DPU Data Request 4.5 Please provide a copy of all WECC Phase 1, Phase 2, and Phase 3 study results that have been completed to date. Response to DPU Data Request 4.5 Attchments DPU 4.5 -1,4.5 -2, and 4.5 -3 are the WECC Phase I Rating stdy for the Populus-Terminal Project. Phase II studies are underway and will be complete at the end of August 2008. 08-035-42/Rocky Mountan Power July 31,2008 . DPU Data Request 4.3 DPU Data Request 4.3 Please provide an update (if there are any changes) to RMP's Response to DPU Data Request 1.31 Attchment. Response to DPU Data Request 4.3 The information provided in response to DPU 1.31 is the most recent information until an updated estimate is completed. The updated estimate is due for completion during the last week of August 2008. 08-035-42/Rocky Mountain Power July 31,2008 DPU Data Request 4.4 DPU Data Request 4.4 Please provide a copy of any WECC economic and reliabilty determinations relative to this project. Response to DPU Data Request 4.4 There have been no economic reprts filed with WECC for the Populus - Terminal 345-kV transmission line project. The Phase 1 Study Report (see Data Request 4.5) speaks to improved system stabilty performance durng light autumn and heavy sumer loads. Stronger integration into the main Utah transmission system wil provide additional synchronizing with the Bridger system while increasing ratings for southbound and nortbound flows. UTAH 08-035-42 ROCKY MOUNTAIN POWER DPU 4TH SET DATA REQUEST (1-5) ATTACHMENT DPU 4.2 ON THE ENCLOSED CD UTAH 08-035-42 ROCKY MOUNTAIN POWER DPU 4TH SET DATA REQUEST (1-5) ATTACHMENT DPU 4.5 -(1-3) ON THE ENCLOSED CD