Please find enclosed Rocky Mountain Power s Responses to lIP A 1 st Set Data Requests
1.12 1.13, 1.26 and 1.37. Also enclosed is Rocky Mountain Power s 1st Supplemental
Response to lIP A Data Request 1.11. Provided on the enclosed CDs are Attachments
lIP A 1.11 1st Supplemental, 1.12, 1.13 and 1.26.
If you have any questions, please feel free to call me at (801) 220-4975.
Sincerely,
/Eb
Brian Dickman, Manager
Regulation
Enclosures
Cc:Tony YankellIIPA
Jean JewelllIPUC
Randall C. Budge/Monsanto
James R. Smith/Monsanto
Maurice Brubaker/Monsanto
Richard AndersonlEnergy Strategies
Conley Ward! Agrium
Dennis Peseau/ Agrium
Brad Purdy/CAP AI
Timothy Shurtz
PAC-07-05/Rocky Mountain Power
August 27, 2007
lIP A 1 st Set Data Request 1.11 1 st Supplemental
IIPA Data Request 1.
Please provide in electronic format for the period January 1 2004 through the
most recent month available hourly data similar to that provided in CCS Request
11 in PAC-05-01.
1st Supplemental Response to lIP A Data Request 1.
The following larger files provided in the company s original response have been
broken down into smaller files for ease of use.
The response to lIP AI-II C, 0 is now broken down by year (2004, 2005, 2006
and 2007).
The response to lIP AI-II N is now broken down as follows:
2004
2005
2006 Jan-Jun
2006 Jul-Dec
2007
(It has not been determined who will sponsor this response at hearing.
IDAHO
PAC-O7-
ROCKY MOUNTAIN POWER
IIPA DATA REQUESTS SET 1 (1-38)
ATTACHMENT lIP A 1.1st Supp
ON THE ENCLOSED CD
PAC-07-05/Rocky Mountain Power
August 27, 2007
lIP A 1 st Set Data Request 1.
lIP A Data Request 1.12
Please provide in electronic format a listing of the date, time, and estimated
magnitude of all actual hourly curtailments/interruptions that occurred during the
test year in Idaho separated by rate schedule or special contract customer.
outright curtailments/interruptions are treated differently than "buy-throughs
please state each separately.
Response to lIP A Data Request 1.
See Attachment lIP A 1.12 for curtailments / interruption data for special contract
customers in the company s Idaho service territory. For scheduled curtailments of
irrigation customers, please see Tables 5, 6 and 7 in Attachment IIPA 1.15, the
Schedule 72 Idaho Irrigation Load Control 2006 Credit Rider Initiative Final
Report.
(Tom Beck and Jeff Bumgarner prepared this response and are the recordholders.
It has not been determined who will sponsor this response at hearing. Please
contact Brian Dickman at 801-220-4975 to discuss this response.
IDAHO
P AC-O7-
ROCKY MOUNTAIN POWER
lIP A DATA REQUESTS SET 1 (1-38)
ATTACHMENT lIP A 1.
ON THE ENCLOSED CD
P A C- E-07 -05/Rocky Mountain Power
August 27 2007
lIP A 1 st Set Data Request 1.
lIP A Data Request 1.13
Please provide in electronic format a listing of the date, time, and estimated
magnitude of all actual hourly curtailments/interruptions that occurred during the
test year in each of the other jurisdictions. If outright curtailments/interruptions
are treated differently than "buy-throughs , please state each separately.
Response to lIP A Data Request 1.13
Please see Attachment lIP A 1.13 for curtailments / interruption data for other
jurisdictions.
Below is the 2006 Utah Demand Side Management program for Cool Keeper Air
Conditioning Load Control Program.
2006 Utah Cool Keeper Air Conditioning Load Control Program
Dispatch Date Dispatch Time Estimated
Magnitude
(me2awatts)
6 June '2:30p - 5:00p (MDT)56.2
26 June '2:00p - 5:00p (MDT)55.
27 June '2:30p - 4:00p (MDT)49.2
28 June '2:30p - 5:00p (MDT)64.
Total June dispatches
11 July '3:00p - 4:50p (MDT)51.7
13 July '3:45p - 6:15p (MDT 62.
17July 2:30p - 5:00p (MDT)71.3
18July '2:30p - 5:00p (MDT)61.8
19July '2:30p - 5:00p (MDT)67.
20Julv '2:30p - 5:00p (MDT)57.
2IJuly '2:30p - 5:00p (MDT)70.1
25July '2:00p - 5:00p (MDT)67.
27July '2:30p - 5:00p (MDT)70.
28July '2:30p - 5:00p (MDT)90.
Total July dispatches
August '2:30p - 5:00p (MDT)41.4
8August '2:30p - 5:00p (MDT)60.
P AC-07 -05/Rocky Mountain Power
August 27,2007
lIP A 1 st Set Data Request 1.
Dispatch Date Dispatch Time Estimated
Magnitude
(mee:awatts)
OAugust '2:30p - 5:00p (MDT)79.1
11 August '2:30p - 5:00p (MDT)65.
21August '2:30p - 5:30p (MDT)65.
22August '2:30p - 5:00p (MDT)63.
23August '2:30p - 5:00p (MDT)62.
29August '2:30p - 5:00p (MDT)71.4
30August '2:30p - 5:00p (MDT)71.4
Total August
dispatches
Total 2006 dispatches
Estimation methodology:
The estimate of load reduction for each dispatch event was derived utilizing two
separate measurements. First, estimates were made based on the company
contractual measurement protocol using inferential statistics drawn from a pre-
selected stratified random sample of participating sites located throughout Rocky
Mountain Power s Cool Keeper network. Second, dispatch estimates were drawn
from the company s supervisory control and data acquisition system (SCADA)
where actual load behavior was monitored along Rocky Mountain Power
Wasatch Front service area. The estimate of load reductions in the table above
represents an averaging of these two measurements for each dispatch date and
time.
(Tom Beck and Jeff Bumgarner prepared this response and are the recordholders.
It has not been determined who will sponsor this response at hearing. Please
contact Brian Dickman at 801-220-4975 to discuss this response.
IDAHO
P AC-O7-
ROCKY MOUNTAIN POWER
lIP A DATA REQUESTS SET 1 (1-38)
ATTACHMENT lIP A 1.
ON THE ENCLOSED CD
PAC-07-05/Rocky Mountain Power
August 27 2007
lIP A 151 Set Data Request 1.
lIP A Data Request 1.26
Mr. Walje indicated on page 15 lines 5-12 of his testimony that Rocky Mountain
Power has successfully delivered its System Average Interruption Frequency
Index (SAIFI) target during 2006 and is on track to deliver its SAlOl target for
2007. Please provide what the 2006 and 2007 SAIFI and SAlOl targets are. Also
please provide the SAIFI and SAIDI actual values by jurisdiction and for the
system as a whole for each year from 2001 through 2006.
Response to lIP A Data Request 1.26
In Mr. Walje s testimony, the targets cited relate to the Service Standards
Program, which identified a SAIFI goal of2.07, by 3/31/2008. The Service
Standards Program does not have year-by-year targets for reliability, but deliver-
by dates. Please see Attachment lIP A 1.26 for actual performance from 2001
through 2006 for each jurisdiction and the system. Note that the company
implemented an automated outage reporting system between 2001 and 2004
which led to better data collection of outage results and renders year-to-year
results for each state incomparable. Two target values have been provided since
the company and commission modified the method for evaluating major event
thresholds.
(Heide Caswell prepared this response and is the recordholder. Douglas N.
Bennion is expected to sponsor this response at hearing. Please contact Brian
Dickman at 801-220-4975 to discuss this response.
IDAHO
PAC-O7-
ROCKY MOUNTAIN POWER
IIPA DATA REQUESTS SET 1 (1-38)
ATTACHMENT lIP A 1.
0 N THE ENCLOSED CD
PAC-07-05/Rocky Mountain Power
August 27, 2007
lIP A 1 st Set Data Request 1.37
lIP A Data Request 1.
Please provide a list of the "scalars" developed by the Company as addressed On
page 19 lines 3-18 of Mr. Widmer s testimony.
Response to' lIP A Data Request 1.
The scalars are extremely confidential, price and transaction sensitive, and
commercially proprietary. Disclosure of this information may give an undue
advantage to competitors and therefore requires the highest level of confidential
treatment. Monthly and hourly scalars developed for the quarter ended June 30
2007 will be made available for review at the company s offices. Please contact
Brian Dickman at 801-220-4975 to make arrangements to review.
(Mark T. Widmer prepared this response, is the recordholder, and is expected to
sponsor this response at hearing.