RE:P AC-07-
Monsanto Data Request Set 5 (1-11)
Please find enclosed PacifiCorp s responses to 5th Set Monsanto Data Request 5.2 - 5.11.
Provided on the enclosed CD are Attachments Monsanto 5.8. Confidential Attachments
Monsanto 5.4, 5.9 and 5.11 are provided on the enclosed CD to parties that have signed a
protective order in this docket. The response to Monsanto 5.1 is in process and will be
provided when available.
If you have any questions, please feel free to call me at (801) 220-4975.
Sincerely,
/f)jJ
Brian Dickman, Manager
Regulation
Enclosures
Cc:James R. Smith/Monsanto
Maurice Brubaker/Monsanto
Richard Anderson/Energy Strategies
Jean JewelllIPUC
Eric Olsen/lIP A
Tony Y ankel/IIP A
Conley Ward/Agrium
Dennis Peseau/ Agrium
Brad Purdy/CAP AI
Timothy Shurtz
PAC-07-05/Rocky Mountain Power
August 23, 2007
Monsanto 5th Set Data Request 5.
Monsanto Data Request 5.
With respect to Mr. Fehrman s testimony at page 3, lines 5-, please identify the
primary driver(s) underlying the need for 1) a flexible resource in the East portion
ofthe system in 2005, and 2) a high capacity factor resource in the East portion of
the system in 2007.
Response to Monsanto Data Request 5.
1) The primary drivers for the flexible resource in the East control area in 2005
were the need for additional capacity on a system basis (about 1 400
megawatts), as well as Heavy Load Hour capacity in the east.
2) The primary driver for the high-capacity- factor resource in the East control
area in 2007 was the 1 600 megawatt system short position expected in that
year. (See Figure 2.2, page 33, of the 2003 IRP report.
Portfolio analysis conclusions regarding the need for base load units (pulverized
coal and gas-fired combined cycle combustion turbines) is provided on page 147
of the 2003 IRP report.
(Gregory N. Duvall prepared this response and is the recordholder. William J.
Fehrman is expected to sponsor this response at hearing. Please contact Brian
Dickman at 801-220-4975 to discuss this response.
PAC-07-05/Rocky Mountain Power
August 23, 2007
Monsanto 5th Set Data Request 5.3
Monsanto Data Request 5~3
With respect to Mr. Fehrman s testimony at page 3 , lines 12-, was analysis
conducted that identified the loadlresource gap by state? If so, please provide a
comparative response indicating how the Idaho loadlresource gap measured
against similar load/resource gaps from the remaining PacifiCorp states.
Response to Monsanto Data Request 5.
No. As indicated in Mr. Fehrman s referenced testimony, the company plans for
resources on a system basis. For reporting purposes in the IRP document, load
and resource balance information is presented for the east and west control areas.
(Gregory N. Duvall prepared this response and is the recordholder. William J.
Fehrman is expected to sponsor this response at hearing. Please contact Brian
Dickman at 801-220-4975 to discuss this response.
PAC-07-05/Rocky Mountain Power
August 23 , 2007
Monsanto 5th Set Data Request 5.4
Monsanto Data Request 5.
With respect to Mr. Fehrman s testimony at page 6, lines 10-, please quantify
the benefits to Idaho ratepayers Mr. Fehrman claims will result from the Lakeside
project.
Response to Monsanto Data Request 5.4
A quantification ofthe benefits that Mr. Fehrman is referencing can be obtained
on page 6 ofPacifiCorp s Board paper entitled Summit RFP 2003A Combined-
Cycle Power Project, PacifiCorp dated April 30, 2004. Please see Confidential
Attachment Monsanto 5.4 This document is confidential and is provided subject
to the terms and conditions of the protective order in this proceeding.
(Mark R. Tallman prepared this response and is the recordholder. William J.
Fehrman is expected to sponsor this response at hearing. Please contact Brian
Dickman at 801-220-4975 to discuss this response.
IDAHO
P AC-O7-
ROCKY MOUNTAIN POWER
MONSANTO DATA REQUESTS SET 5(1-11)
CO NFID ENTIAL A TT A CHMENT
MONSANTO 5.
ON THE ENCLOSED CONFIDENTIAL CD
PAC-07-0S/Rocky Mountain Power
August 23 , 2007
Monsanto 5th Set Data Request 5.
Monsanto Data Request 5.
With respect to Mr. Fehrman s testimony at page 10, lines 22-, please provide a
list of all renewable projects the Company either developed or entered into a
contractual purchase agreement that resulted from the issuance of the original
RFP 2003-
Response to Monsanto Data Request 5.
Wolverine Creek
Leaning Juniper
Marengo
(Mark R. Tallman prepared this response and is the recordholder. William J.
Fehrman is expected to sponsor this response at hearing. Please contact Brian
Dickman at 801-220-4975 to discuss this response.
PAC-07-05/Rocky Mountain Power
August 23 , 2007
Monsanto 5th Set Data Request 5.
Monsanto Data Request 5.
With respect to Mr. Fehrman s testimony at page 11 , lines 7-, did the
development of the Leaning Juniper and Marengo wind plants result from the
February 2004 issuance of the RFP 2003-B or the re-issuance of the same RFP at
a later date?
Response to Monsanto Data Request 5.
The Leaning Juniper 1 and Marengo wind plants resulted from PacifiCorp
amendment to RFP 2003-
(Mark R. Tallman prepared this response and is the recordholder. William J.
Fehrman is expected to sponsor this response at hearing. Please contact Brian
Dickman at 801-220-4975 to discuss this response.
P AC-07-05/Rocky Mountain Power
August 23 , 2007
Monsanto 5th Set Data Request 5.
Monsanto Data Request 5.
With respect to Mr. Fehrman s testimony at page 12, lines 11-, please quantify
the benefits to Idaho ratepayers Mr. Fehrman claims will result from the Leaning
Juniper wind plant.
Response to Monsanto Data Request 5.
A quantification of the benefit referred to in Mr. Fehrman s testimony is
contained in the confidential Board paper entitled Leaning Juniper 1 Wind Plant
Acquisition dated July 12 2006. This document was provided in response to
IPUC Production Request 9, a copy of which was provided to Monsanto. This
document contains confidential information; its use is subject to the terms and
conditions of the protective order in this proceeding.
(Mark R. Tallman prepared this response and is the recordholder. William J.
Fehrman is expected to sponsor this response at hearing. Please contact Brian
Dickman at 801-220-4975 to discuss this response.
PAC-O7-05/Rocky Mountain Power
August 23 , 2007
Monsanto 5th Set Data Request 5.
Monsanto Data Request 5.
With respect to Mr. Fehrman s testimony at page 13 , lines 8-9, please provide
detailed information (site, size, cost, delivery point, etc.) of the power purchase
agreements from wind projects in the PacifiCorp portfolio.
Response to Monsanto Data Request 5.
See response to Idaho Staff Production Request a copy of which was provided
to Monsanto.
(Mark R. Tallman prepared this response and is the recordholder. William J.
Fehrman is expected to sponsor this response at hearing. Please contact Brian
Dickman at 801-220-4975 to discuss this response.
IDAHO
P A C- E-07 -
ROCKY MOUNTAIN POWER
MONSANTO DATA REQUESTS SET 5(1-11)
ATTACHMENT MONSANTO 5.
ON THE ENCLOSED CD
PAC-07-05/Rocky Mountain Power
August 23, 2007
Monsanto 5th Set Data Request 5.
Monsanto Data Request 5.
With respect to Mr. Fehrman s testimony at page 15 , lines 13-, please quantify
the benefits to Idaho ratepayers Mr. Fehrman claims will result from the Marengo
wind plant.
Response to Monsanto Data Request 5.
A quantification of the benefit referred to in Mr. Fehrman s testimony is
contained in the confidential Board paper entitled Marengo Wind Plant
Acquisition dated September 25 , 2006 and the confidential memo entitled Post
E.R. Memo to File for the Marengo Wind Project"dated October 4, 2006. The
Board paper was provided in response to IPUC Production Request 9, a copy of
which was provided to Monsanto. The "Post E.R. Memo" is provided here as
Confidential Attachment Monsanto 5.7. These documents are confidential; their
use is subject to the terms and conditions of the protective order in this
proceeding.
(Mark R. Tallman prepared this response and is the recordholder. William J.
Fehrman is expected to sponsor this response at hearing. Please contact Brian
Dickman at 801-220-4975 to discuss this response.
IDAHO
PAC-07-
ROCKY MOUNTAIN POWER
MONSANTO DATA REQUESTS SET 5(1-11)
CONFIDENTIAL ATTACHMENT
MONSANTO 5.
ON THE ENCLOSED CONFIDENTIAL CD
PAC-07-05/Rocky Mountain Power
August 23 , 2007
Monsanto 5th Set Data Request 5.10
Monsanto Data Request 5.
With respect to Mr. Fehrman s testimony at page 18, lines 11-, please quantify
the benefits to Idaho ratepayers Mr. Fehrman claims will result from the Goodnoe
Hills wind plant.
Response to Monsanto Data Request 5.
A quantification of the benefit referred to in Mr. Fehrman s testimony is
contained in the confidential paper entitled Goodnoe Hills Wind Plant
Acquisition dated April 12, 2007. This document was provided in response to
IPUC Production Request 9, a copy of which was provided to Monsanto. This
document contains confidential information and is provided subject to the terms
and conditions of the protective order in this proceeding.
(Mark R. Tallman prepared this response and is the recordholder. William J.
Fehrman is expected to sponsor this response at hearing. Please contact Brian
Dickman at 801-220-4975 to discuss this response.
PAC-07-05/Rocky Mountain Power
August 23 , 2007
Monsanto 5th Set Data Request 5.11
Monsanto Data Request 5.
With respect to Mr. Fehrman s testimony at page 21 , lines 18-19, please quantify
the benefits to Idaho ratepayers Mr. Fehrman claims will result from the Blundell
Bottom Cycling resource.
Response to Monsanto Data Request 5.
A quantification of the benefit referred to in Mr. Fehrman s testimony is
contained in the confidential Board paper entitled "Blundell Bottoming Cycle
dated December 5 , 2005. It is provided as Confidential Attachment Monsanto
5.11. This document is confidential and is provided subject to the terms and
conditions of the protective order in this proceeding.
(Mark R. Tallman prepared this response and is the recordholder. William J.
Fehrman is expected to sponsor this response at hearing. Please contact Brian
Dickman at 801-220-4975 to discuss this response.
IDAHO
P AC-07-
ROCKY MOUNTAIN POWER
MONSANTO DATA REQUESTS SET 5(1-11)
CONFIDENTIAL A TT ACHMENT
MONSANTO 5.
ON THE ENCLOSED CONFIDENTIAL CD