RE:PAC-07-
IPUC Production Data Request 1-
Please find enclosed Rocky Mountain Power s Response to IPUC Production Requests 3
, 11 and 14. Provided on the enclosed CD are Attachments IPUC Production 11 and
14 -(1-3).
If you have any questions, please feel free to call me at (801) 220-4975.
~~io
Brian Dickman, Manager
Regulation
Enclosures
P AC- E-07 -05/Rocky Mountain Power
August 2 , 2007
IPUC Production Data Request 3
IPUC Production Data Request 3
Please explain why RFP 2003-B was re-opened to allow previous bidders to
update their proposals and to invite new bidders to participate. How many bids
were updated and how many new bidders chose to participate as a result.
Response to IPUC Production Data Request 3
RFP 2003-B was re-opened to new bidders and to allow previous bidders to
update their bids to allow PacifiCorp to review renewable resource proposals
from the entire pool of bidders then currently available.
PacifiCorp has not created a tabulation of updated bids or a tabulation of new
bidders as a result of the re-opened RFP 2003-
(Mark R. Tallman at 503-813-5376 prepared this document and is also the record
holder. William J. Fehrman is expected to sponsor this response at hearing.
PAC-07-05/Rocky Mountain Power
August 2, 2007
IPUC Production Data Request 7
IPUC Production Data Request 7
Please provide all analysis performed to evaluate and compare short-listed bids
including bids for the Leaning Juniper, Marengo, and Goodnoe Hills projects.
The analysis may include computations of PVRR, energy cost and capacity cost;
comparisons between bids and against wind cost assumptions included in the
2003 IRP; and risk analysis. For spreadsheet analysis, please provide electronic
copies of all spreadsheets with formulas intact.
Response to IPUC Production Data Request 7
To the extent the request asks for "all" analysis performed to evaluate and
compare short-listed bids, PacifiCorp objects on the basis that the request is
overly burdensome. Notwithstanding PacifiCorp s objection, the following
information is provided.
The "RFP 2003-B Summary Report" prepared for the Oregon PUC is provided as
Attachment IPUC Production 4; that report includes an analysis and evaluation
comparing the PVRRs of all short-listed bids, including Leaning Juniper
Marengo, and Wolverine Creek. Also see the discussion in response to IPUC
Production Request 6 regarding short-listed bids not selected.
The Goodnoe Hills project was not a bid into RFP 2003-
(Mark R. Tallman at 503-813-5376 prepared this document and is also the record
holder. William 1. Fehrman is expected to sponsor this response at hearing.
PAC-07-05/Rocky Mountain Power
August 2, 2007
IPUC Production Data Request 8
IPUC Production Data Request 8
Please provide cost analysis, similar to that described in Request No., for the
Wolverine Creek wind project.
Response to IPUC Production Data Request 8
The cost analysis for the Wolverine Creek wind project is extremely confidential
price and transaction sensitive, and commercially proprietary. Disclosure of this
material may give an undue advantage to competitors and therefore requires the
highest level of confidential treatment. The records will be made available for
review at the company s offices..
(Mark R. Tallman at 503-813-5376 prepared this document and is also the record
holder. William 1. Fehrman is expected to sponsor this response at hearing.
PAC-07-05/Rocky Mountain Power
August 2, 2007
IPUC Production Data Request
IPUC Production Data Request 11
Please provide a summary of the wind generation that PacifiCorp purchases
through power purchase agreements (PP As). In the summary, include at least the
name and location of the wind facility, the nameplate capacity and capacity factor
for each project, the quantity of annual energy purchased, the term of the PP A
and all pertinent purchase price information.
Response to IPUC Production Data Request
See Attachment IPUC Production lIon the enclosed CD for a table summarizing
wind generation purchased through power purchase agreements. The purchase
price information is extremely confidential, price and transaction sensitive, and
commercially proprietary. Disclosure of this material may give an undue
advantage to competitors and therefore requires the highest level of confidential
treatment. The records will be made available for review at the company
offices.
(Mark R. Tallman at 503-813-5376 prepared this document and is also the record
holder. William 1. Fehrman is expected to sponsor this response at hearing.
IDAHO
P AC-O7-
ROCKY MOUNTAIN POWER
IPUC PRODUCTION DATA REQUESTS 1-
ATTACHMENT IPUC PRODUCTION
ON THE ENCLOSED CD
P AC- E-07 -05/Rocky Mountain Power
August 2, 2007
IPUC Production Data Request 14
IPUC Production Data Request 14
What are the contractual Guaranteed Operation Dates for the Lake Side, Leaning
Juniper, Marengo, and Goodnoe Hills projects? Please provide a construction
schedule for each of these projects and discuss whether the construction is on
schedule for each project.
Response to IPUC Production Data Request 14
Lake Side
The contractual Guaranteed Operation Date for the Lake Side Project would refer
to the Guaranteed Provisional Acceptance Date, or May 15 , 2007 as adjusted
pursuant to any Change Order.
The project is currently behind schedule to meet the provisional acceptance date.
The Project is currently producing test energy and is expected to be fully
dispatchable and available for commercial operation by August 31 , 2007. Please
see Attachment IPUC Production 1.14a for the construction schedule which has
not been updated for recent changes.
Leaning Juniper
The "Guaranteed Final Completion Date" has the meanIng set forth in
Section 7.9 of the agreement.
The Leaning Juniper Wind Project (LJWP) warrants that Final Completion
shall be achieved not later than six (6) months after the date of Project
Substantial Completion ("Guaranteed Final Completion Date ) except for
Punch List Items that, by their nature, cannot be completed because of
factors beyond the control ofLJWP.
The "Guaranteed Project Substantial Completion Date" means September
, 2006, as such date may be extended pursuant to this Agreement.
There is no construction schedule in the Project Completion Agreement due to the
short remaining duration of construction at the time PacifiCorp acquired the
project. Construction was completed on time on September 14 2006.
Marengo
The "Guaranteed Final Completion Date" has the meaning set forth in Section 6.
of the agreement, which is shown below.
P AC-07-05/Rocky Mountain Power
August 2, 2007
IPUC Production Data Request 14
Completion Guarantees
Contractor warrants that Final Completion shall be achieved not later than
six (6) months after the date of Substantial Completion ("Guaranteed Final
Completion Date ) except for Punch List Items that, by their nature
cannot be completed because of seasonal weather conditions.
The "Guaranteed Substantial Completion Date" means July 23, 2007.
Construction anticipated substantial completion is August 3, 2007. Please see
Attachment IPUC Production 1.14 -2 for the construction schedule.
Goodnoe Hills
The contractual guaranteed initial wind energy converter commissioning date is
November 15 2007. The "Guaranteed Final Completion Date" has the meaning
set forth in Section 6.
The "Guaranteed WEC Commissioning Date" means December 31 , 2007, as such
date may be modified in accordance with Section 5.5 and Article 9 of the
agreement.
Completion Guarantees
Contractor warrants that Final Completion shall be achieved not later than
six (3) months after the date of Project Substantial Completion
Guaranteed Final Completion Date ), except for Punch List Items that
by their nature, cannot be completed because of seasonal weather
conditions.
2 Project Substantial Completion
Contractor has achieved substantial completion of the Project ("Project
Substantial Completion ), which shall include achievement of WEC
Substantial Completion with respect to all the WECs, and the following
other items:
(a) The requirements set forth in the Commissioning Procedures have
been met or exceeded;
(b) all WECs have been properly assembled, erected, installed, adjusted
tested and commissioned, are mechanically, electrically and structurally
sound as set forth in the Technical Specifications, and can be used safely
in accordance with the Contract Documents, Applicable Law and
Applicable Standards;
PAC-07-05/Rocky Mountain Power
August 2, 2007
IPUC Production Data Request 14
( c) Contractor has completed all of the Work for all of the Infrastructure
Facilities, other than the Performance Tests and any Punch List Items and
has delivered to Owner copies of all test reports and electrical schematics
related to the Infrastructure Facilities;
(d) Contractor has prepared and submitted to Owner the final and
complete list of Punch List Items;
(e) Contractor has delivered draft copies of the Turnover Packages and
O&M Manuals in accordance with Section 2.11;
(f) Contractor has delivered to Owner all Partial Lien Waivers and Final
Lien Waivers, as the case may be, from all Subcontractors for Work
completed through such date;
(g) drafts of As-Built Drawings and Documentation shall have been
delivered to, and accepted by, Owner in accordance with Section 2.
(h) all quality assurance documentation has been provided to Owner
accordance with the Project Quality Assurance Plan and all non-
conforming quality assurance issues have been resolved in accordance
with the Project Quality Assurance Plan; and
(i) Owner has accepted a Project Substantial Completion Certificate
pursuant to Section 6.
Notwithstanding achievement of Project Substantial Completion
Contractor shall remain obligated to complete the Punch List Items in
accordance with this Agreement. Contractor shall give Owner written
notice at least ten (10) Business Days prior to declaring that it has
achieved Project Substantial Completion with respect to all of the
Infrastructure Facilities and WEC and shall provide on such date a written
list of Punch List Items. Owner shall be entitled to verify and, if
necessary, correct or add to, the list of Punch List Items provided by
Contractor; provided that, the only Punch List items for the WECs shall be
the Punch List prepared in accordance with the Turbine Contract.
Construction is on schedule. Please see Attachment IPUC Production 1.14 -3 for
the construction schedule.
(Charles S. Moulton at 801-220-4591 prepared this document and is also the
record holder. William J. Fehrman is expected to sponsor this response at
hearing. )
IDAHO
P AC-O7-
ROCKY MOUNTAIN POWER
IPUC PRODUCTION DATA REQUESTS 1-
ATTACHMENT IPUC PRODUCTION 14 -(1-
ON THE ENCLOSED CD