Loading...
HomeMy WebLinkAbout20050118sch-7-3.rev.docELECTRIC SERVICE SCHEDULE NO. 7 – Continued MONTHLY BILL: (continued) The unit charge includes installation, maintenance and energy costs for unit on existing or one new wood pole without guys. Where more than one wood pole and more than 200 feet of extension are required, an additional charge of 1.5% of the estimated additional cost will be made. Should Customer desire a steel pole instead of a wood pole, an additional charge will be made according to the following schedule: 1. All steel poles installed prior to June 1, 1973. 11 gauge $1.00 per pole per month 3 gauge $1.50 per pole per month 2. Steel poles installed after June 1, 1973. 30 ft., 11 gauge, direct buried $2.35 per pole per month 30 ft., 3 gauge, direct buried $3.95 per pole per month 35 ft., 11 gauge, direct buried $2.85 per pole per month 35 ft., 3 gauge, direct buried $4.65 per pole per month For anchor base poles, add 20¢ per pole per month to all poles installed after June 1, 1973. SPECIFICATIONS AND SERVICE FOR SECURITY AREA LIGHTING: Security flood lights may be mounted on Company-owned poles or on Customer-owned supports acceptable to the Company. The type and kind of fixtures and supports will be in accordance with the Company's specifications. Service includes energy supplied from the Company's overhead circuits, maintenance and lamp and glassware renewals. Lamps will be controlled by the Company to burn each night from dusk to dawn. CONVERSIONS: The Company, upon written request of customer, will convert existing street lighting facilities to other types of lamps (i.e., convert mercury vapor fixtures and lamps to sodium vapor fixtures and lamps, etc.). In such an event, customer shall pay to Company an amount equal to the depreciated value of all Company-owned facilities removed from service and replaced with new equipment plus the cost of removal less any salvage value. Priority in making conversions shall be determined by the order in which requests are received by the Company. CONTRACT PERIOD: Five years or longer. (Continued) Third Revised Sheet No. 7.3 I.P.U.C. No. 28 Canceling Second Revised Sheet No. 7.3 Submitted Under Case No. PAC-E-05-1 ISSUED: January 14, 2005 EFFECTIVE: September 16, 2005