Loading...
HomeMy WebLinkAbout20050118sch-19-1.leg.docUTAH POWER & LIGHT COMPANY ELECTRIC SERVICE SCHEDULE NO. 19 STATE OF IDAHO ______________ Commercial and Industrial Space Heating ______________ (No New Service) AVAILABILITY: At any point on the Company's interconnected system where there are facilities of adequate capacity. APPLICATION: This Schedule is for alternating current single or three-phase electric service to Commercial and Industrial Customers at Company's available voltage for all service required on the Customer's premises subject to the terms and conditions set forth herein. Service for electric resistance heaters and year round heat pumps will be supplied through a special circuit and metered through one kilowatt-hour meter. All other lighting and power requirements will be supplied through a separate circuit and will be separately metered, except that electric motor-drived compressors installed to provide comfort cooling and electric water heating equipment may be connected to the special space heating circuit. No other equipment shall be connected to the wiring serving the space heating equipment. This Schedule is available for space heating only when the Customer regularly uses electric energy for all other service requirements including but not limited to lighting, cooking, water heating, air conditioning, and the operation of machines and other equipment. (Continued) Third Revised Sheet No. 19.1 I.P.U.C. No. 28 Canceling Second Revised Sheet No. 19.1 Submitted Under Case No. PAC-E-05-1 ISSUED: January 14, 2005 EFFECTIVE: September 16, 2005