HomeMy WebLinkAbout20050118sch-10-1.leg.docUTAH POWER & LIGHT COMPANY
ELECTRIC SERVICE SCHEDULE NO. 10
STATE OF IDAHO
______________
Irrigation and Soil Drainage Pumping Power Service
______________
AVAILABILITY: At any point on the Company's interconnected system where there are facilities of adequate capacity.
APPLICATION: This Schedule is for alternating current, single or three-phase electric service supplied at the Company's available voltage through a single point of delivery for service to motors on pumps and machinery used for irrigation and soil drainage.
IRRIGATION SEASON AND POST-SEASON SERVICE: The Irrigation Season is from June 1 to September 15 each year. Service for post-season pumping may be taken by the same Customer at the same point of delivery and through the same facilities used for supplying regular irrigation pumping service during months from September 16 to the following May 31.
MONTHLY BILL:
Irrigation Season Rate
Customer Service Charge:
Small Pumping Operations:
15 horsepower or less total connected horsepower
served through one service connection - $11.00 per Customer
Large Pumping Operations:
16 horsepower or more total connected horsepower
served through one service connection - $33.00 per Customer
(Continued)
Sixth Revised Sheet No. 10.1
I.P.U.C. No. 28 Canceling Fifth Revised Sheet No. 10.1
Submitted Under Case No. PAC-E-05-1
ISSUED: January 14, 2005 EFFECTIVE: September 16, 2005