Loading...
HomeMy WebLinkAbout20231129IPC to Staff Supplemental 20.pdf LISA D. NORDSTROM Lead Counsel lnordstrom@idahopower.com November 29, 2023 VIA ELECTRONIC EMAIL Commission Secretary Idaho Public Utilities Commission 11331 W. Chinden Blvd., Bldg 8, Suite 201-A (83714) PO Box 83720 Boise, Idaho 83720-0074 Re: Case No. IPC-E-23-23 Idaho Power Company’s 2023 Integrated Resource Plan Dear Commission Secretary: Enclosed for electronic filing, please find Idaho Power Company’s Supplemental Response to the First Production Request of Commission Staff. If you have any questions about the attached filing, please do not hesitate to contact me. Very truly yours, Lisa D. Nordstrom LDN:cd Attachments RECEIVED 2023 NOVEMBER 29, 2023 4:59PM IDAHO PUBLIC UTILITIES COMMISSION IDAHO POWER COMPANY’S SUPPLEMENTAL RESPONSE TO THE FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF- 1 LISA D. NORDSTROM (ISB No. 5733) MEGAN GOICOECHEA ALLEN (ISB No. 7623) Idaho Power Company 1221 West Idaho Street (83702) P.O. Box 70 Boise, Idaho 83707 Telephone: (208) 388-2664 lnordstrom@idahopower.com mgoicoecheaallen@idahopower.com Attorneys for Idaho Power Company BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF IDAHO POWER COMPANY’S 2023 INTEGRATED RESOURCE PLAN. ) ) ) ) ) ) ) ) ) CASE NO. IPC-E-23-23 IDAHO POWER COMPANY’S SUPPLEMENTAL RESPONSE TO THE FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF COMES NOW, Idaho Power Company (“Idaho Power” or “Company”), and in response to the First Production Request of the Commission Staff (“Commission” or “Staff”) dated November 3, 2023, herewith submits the following supplemental information: IDAHO POWER COMPANY’S SUPPLEMENTAL RESPONSE TO THE FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF- 2 STAFF REQUEST FOR PRODUCTION NO. 20: Please provide a table similar to Table 10.7 - July Peak Hour and Resource Balance as shown in the 2021 IRP on pages 142-143, updated for the 2023 IRP. SUPPLEMENTAL RESPONSE TO STAFF’S REQUEST FOR PRODUCTION NO. 20: As noted on pages 173-174 of the 2023 Integrated Resource Plan (“IRP”), annual capacity positions have replaced the Load and Resource Balance (“L&RB”) table that existed in prior IRPs. As discussed in the MATLAB workshop with Staff on August 21, 2023, as well as various IRP Advisory Council meetings, Idaho Power has transitioned to using the Loss of Load Expectation (“LOLE”) methodology to assess system reliability via the internally developed Reliability & Capacity Assessment Tool (“RCAT”). RCAT is capable of producing annual capacity positions for any given year and Effective Load Carrying Capabilities (“ELCCs”) for any Variable Energy Resource and Energy Limited Resource. The Company’s current approach involves determining capacity positions based on loss of load probabilities calculated for every hour in a calendar year. This approach is not comparable to the prior approach for developing the L&RB table, which was based on a deterministic peak-hour view. While the old L&RB table cannot be recreated in its prior form, Idaho Power recognizes it provided digestible insight into the capacity contribution of its existing resources and the contribution of the Preferred Portfolio to the ultimate capacity positions in the IRP. In consultation with Staff, Idaho Power developed the attached spreadsheet, which includes an L&RB view for the two analyses presented in Table 11.15 of the 2023 IRP. Please note that only the annual capacity positions are relevant to the 2023 IRP; the IDAHO POWER COMPANY’S SUPPLEMENTAL RESPONSE TO THE FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF- 3 ELCCs and Planning Reserve Margins were developed specifically to provide a detailed resource view and were not utilized in AURORA to develop portfolios. The supplemental response to this Request is sponsored by Jared Hansen, Resource Planning Leader, Idaho Power Company. IDAHO POWER COMPANY’S SUPPLEMENTAL RESPONSE TO THE FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF- 4 DATED at Boise, Idaho, this 29th day of November 2023. LISA NORDSTROM Attorney for Idaho Power Company IDAHO POWER COMPANY’S SUPPLEMENTAL RESPONSE TO THE FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF- 5 CERTIFICATE OF SERVICE I HEREBY CERTIFY that on the 29th day of November 2023, I served a true and correct copy of Idaho Power Company’s Supplemental Response to the First Production Request of the Commission Staff upon the following named parties by the method indicated below, and addressed to the following: Commission Staff Chris Burdin Deputy Attorney General Idaho Public Utilities Commission 11331 W. Chinden Blvd., Bldg No. 8, Suite 201-A (83714) PO Box 83720 Boise, ID 83720-0074 Hand Delivered U.S. Mail Overnight Mail ___ FTP Site X Email Chris.burdin@puc.idaho.gov Micron Technology, Inc. Austin Rueschhoff Thorvald A. Nelson Austin W. Jensen Holland & Hart, LLP 555 Seventeenth Street, Suite 3200 Denver, Colorado 80202 Hand Delivered U.S. Mail Overnight Mail FAX _ FTP Site X Email darueschhoff@hollandhart.com tnelson@hollandhart.com awjensen@hollandhart.com aclee@hollandhart.com clmoser@hollandhart.com Jim Swier Micron Technology, Inc. 8000 South Federal Way Boise, Idaho 83707 Hand Delivered U.S. Mail Overnight Mail FAX FTP Site X Email jswier@micron.com ________________________________ Christy Davenport Legal Administrative Assistant BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION CASE NO. IPC-E-23-23 IDAHO POWER COMPANY ATTACHMENT 1 SEE EXCEL SPREADSHEET