HomeMy WebLinkAbout20230929IPC to Staff Supplemental 296 Attachment 1.pdfB00900276 - Lower Salmon #4 Turbine Refurbishment Variance Notes CLRIS Budget ID Page (Description, Need, Consequence and notes) B00900276_CLRIS Microsoft Project Schedule Notes (PM managed schedules and routine variance notes) 2014 Recast 1: Payments pulled into 2014 per Payment Schedule and Schedule of Prices obtained during RFP Process. Overall project budget still very close. 2014 increase $1.5M Budget Update Authorized to Spend 2014 Recast 3: Added non-Voith Rehab work; used Lower Malad's actuals as basis for dollar amounts. (RFO) 2014 Recast 4: General update, project on track; trued up Voith Milestones and added task: expected change orders to account for options within the contract. 2014 Recast 5: Added $47.6K to DCE 500; Overlooked transportation costs in original budget plan, so added this in using experience from Lower Malad Actuals. Moved approximately $85K from CC603 to CC641 all within the DCE 100 (Labor) for 2015. Updated actuals for labor from CC641. Budget Update Authorized to Spend 2015 Recast 1: Incorporated B00900217. Tasks added are noted. $570K, for CC 603 labor on this project, was transferred from Budget ID B00900217. Additionally, a milestone payment of $400K that was anticipated for 2014 will not be made until 2015. EAC: $7,719,276.94 (MWB) Budget Update Authorized to Spend 2015 Recast 2: Reduced contingency by $235K to offset refurbishment work added previously. When the budget ID's were combined there was money for rotor pole refurbishment in both. Total amount was $540K and this was reduced by $190K to cover lowest bid. Runner Assy Start ($420K), PO Rehab Materials ($420K), shaft line analysis ($17K) were all moved to 2015 Q1. Refurbishment of rotor pole ($350K), servo, gen shaft ($70K), guide bearing ($60K), thrust bearing ($42K) moved from 2015 Q2 to 2015 Q3 to reflect when invoices expected. Add Thrust bridge repair ($50K) and Laser alignment ($29K) tasks. EAC: $7,780,845.19 (MWB) 2015 Recast 3: Moved $100K labor from 2015 Q3 to 2015 Q4. Moved rotor pole invoice ($344K) from 2015 Q3 to 2015 Q2. Adjusted Servo Invoice and guide bearing invoice to actual and moved balance to generator shaft invoice. Added CO's for repair work that increased EAC. EAC: $7,850,686.22 (MWB) Recast 4-2015: Moved $100K service/material from 2015 Q3 to 2015 Q4. EAC increase of $100K for additional repair items and increasing labor for assembly. EAC: $7,957,433.07 (MWB) Budget Update Authorized to Spend Update 1 2016 Carryover: $137,252 Total Project Change: $137,252 Reassembly and Commissioning taking longer and more labor than estimated. EAC: $8,440,335 Budget Update Authorized to Spend 2016 Budget Update 2 Total Project Change: 113,444 Assembly took longer than estimated consuming more labor. Additional money added for index and vibration test to facilitate final payment. Move final Voith payment to Q2. EAC: $8,553,779 Budget Update Authorized to Spend 2016 Budget Update 3 No Change EAC: 8,549,028