Loading...
HomeMy WebLinkAbout20230929IPC to Staff Supplemental 293 Attachment 1.pdfVARI130001 - VARI Replace communications multiplex equipment Variance Notes CLRIS Budget ID Page (Description, Need, Consequence and notes) VARI130001_CLRIS VARI130001_Solution_CLRIS Authorized to Spend = $14.4M Actuals = $14.7M 2012 5/29/2012 (PN): Converted SRT-recommended Solution 4819 to Project/BudgetID per management approval. Set Solution status to 'Completed'; 7/18/2012 (PN): $100k in 2012 to start work in 2012; 10/29/12 (Van Patten): As requested by Vern Porter and Ed Helms, this budget ID will be combined with VARI130002 and VARI130003. Updated scope, need and increased 2013 and 2014 budgets to $7.05M and $3.45M respectively to accommodate all work; Budget Update Authorized to Spend 2013 4/9/13 (Van Patten): Increased 2015 budget from $0 to $450k and increased 2014 budget from $3.45M to $5.1M to accommodate CIP work to be recast into this project. Changed in-service date to 2015; 5/21/2013 (PN): Increased 2013 budget from $7.05M to $7.15M, 2014 from $5.1M to $5.25M per PL, Mgt, May PPC; 8/20/2013 (PN): Increased 2013 budget from $7.15M to $7.3M, increased 2014 from $5.25M to $5.3M, per PL, August PPC; 10/24/2013 (PN): Incr 2014 budget from $5.3M to $5.7M per PL, Oct PPC. . . . . 10/15/2013 (PN): Increased 2013 budget from $7.3M, to $8.5M, did not yet increase 2014 budget (to $5.7M), per PL, OSVP, October PPC; 12/17/2013 (PN): Reduced 2013 budget from $8.5M to $7.85M, increased 2014 budget from $5.7M to $6.35M per PL, Dec PPC Budget Update Authorized to Spend 2014 1/21/2014 (PN): 2014 budget from $6.35M to $6.38M per PL, January PPC; 5/20/2014 (PN): Reduced 2014 budget from $6.38M to $6.13M per PL, May PPC; 10/14/2014 (PN): Reduced 2014 budget from $6.05M to $5.75M, increased 2015 frm $530k to $830k per PL, Oct PPPC Budget Update Authorized to Spend 2015 6/17/2015 (PN): Increased 2015 budget from $830k to $865k per June PPC; 7/16/2015 (PN): Increased 2015 budget from $865k to $915k per PL, July PPPC Budget Update Authorized to Spend Microsoft Project Schedule Notes (PM managed schedules and routine variance notes) 5/2012 Project was identified and approved, thus no budget for 2012 work. Current Year = $100,000 Total FAC= $ = $100,000 11/2012 Current Year =$254,716 Total FAC=$10,754,716 VARI130001, VARI130002 (Cisco Routers), and VARI130003 (NEC Microwave Radios) projects were combined to one project (VARI130001). Updated scope and planned 2013 and 2014 forecasts to accommodate all work (identified 2013 forecast as $5,200,000 but budget was not updated as the timing was after the annual budget cycle). 4/2013 Current Year =$7,050,000 Total FAC= $12,854,716 Total FAC Change: $2.1M increase Transferred forecast of $2,100,000 for the inclusion of Critical Infrastructure Protection (CIP). Budget Update Authorized to Spend 5/2013 Current Year = $7,150,000 Total FAC= $13,104,716 Total FAC Change: $250k increase Transfer $100k from VARISTAT for Webmon, $135k from TFSN110101, And increase 20k for Loaded rates Budget Update Authorized to Spend 8/2013 Current Year =$7,300,000 Total FAC=$13,304,716 Total FAC Change: $200k increase Transferred $132k from video project for for SNBK, increase of $68k for additional materials. 10/2013 Current Year =$8,500,000 Total FAC= $14,904,716 Total FAC Change: $1.6M Spend was increased to account for training and additional materials Budget Update Authorized to Spend 12/2013 Current Year =$7,850,000 Total FAC=14,904.716 Total FAC Change: no change 1/2014 Current Year =$6,380,000 Total FAC=$1,902,845 Total FAC Change: $(1,871) 5/2014 Current Year = $6,130,000 Total FAC= $14,652,845 Total FAC Change: $ (250,000) Decrease of due to reestimate based on previous year performance, an increase was required for replacement of Revenue and Power Quality meters needing ethernet connections Budget Update Authorized to Spend 10/2014 Current Year = $5,750,000 Total FAC= Total FAC Change: $$14,652,845 Total FAC Change: no change Due to resource availability constraints, additional work from 2014 transferred to 2015. Budget Update Authorized to Spend