Loading...
HomeMy WebLinkAbout20230929IPC to Staff Supplemental 292 Attachment 1.pdfSKWY180001 - SKWY New Skyway distribution substation northwest of Caldwell Industrial Airport Variance Notes CLRIS Budget ID Page (Description, Need, Consequence and notes) SKWY180001_CLRIS SKWY180001_Solution_CLRIS Authorized to Spend = $6.4M Actuals = $6.4M Microsoft Project Schedule Notes (PM managed schedules and routine variance notes) 8/7/17 Current year: no change Total FAC change: no change project to kick off in Aug or Sept, team not assigned yet 9/13/17 Current year: deferred -$20k Total FAC change: +$25k Additional cost for contract design, likely to be survey and easement charges as well which are not currently forecasted 10/11/17 Current year: no change Total FAC change: no change will be Lidar costs, out for bid now, currently not forcasted 2017 Budget Update 4 Current Year: deferred $293k Design won't start until next year, still high level planning for xmsn and stn site location Budget Update Authorized to Spend 11/8/17 Current year: project change +$102k Total FAC change: +$108k added estimate for land survey based on RFPs, still determining station location and transmission route 12/8/17 Current year: no change Total FAC change: +$15k additional scoping labor, still determining station location and transmission route 1/9/18 Current year: deferred $60k Total FAC change: +$32k station scoping and design pushed out, no xmsn route yet, so many unknowns both cost and schedule. 2/9/18 Current year: project change $16k Total FAC change: +$16k Decision made to place option on future station property ($10k) and associated labor 3/12/18 Current year: project change $417k Total FAC change: +$428k Added cost of estimated easements for transmission line. 2018 Budget Update 2 Current year: Project Change $430k Added cost of estimated easements for transmission line. Budget Update Authorized to Spend Budget Update 3 Current Year: Project Change +$400k Increased costs for easements, station land purchase, first transformer payment charge Budget Update Authorized to Spend 9.12.18 Current Year: Project Change -$355k Total Project FAC: Project Change -$682M $683k of Transmission Line Easement expenses need to be transfered to T404190001 10.10.18 Current Year: Project Change $532k for 2018 Total Project FAC: Project Change +$682k Transmission line ROW, station land costs transferred to the correct BIDs Budget Update 4 Current Year: Accelerated +$222k 2018 expenses incl. $171k land, $200k xfmr payment, contract design $120k, surveying, internal labor 11.12.18 Current Year: Project Change +$53k Total Project FAC: Project Change +$766k Distribution design design complete incr $450k, metalclad +$140k, fiber to substation +$100k, contract design cost +$40k 12.12.18 Current Year: Deferred -$10k Total Project FAC: Project Change +$100k Stations design site complications will push design completion into 2019. Added preliminary estimate for site work additional work. 3.14.19 Current Year: Project Change +$90k Total FAC: Project Change +$90k Station site work. 2019 Budget Update 1 Current year: Project Change +$2.08M Permittting, designs are complete and construction contracts are in-place. Construction contracts $1.2M more than estimated (Station $750k, Dist $450k). Other increases, metalclad $250k, station site work (curb, sidewalk, landscaping, etc.) $300k, dist materials $200k. Budget Update Authorized to Spend 7.11.19 Current Year: No Change Total FAC: No Change 2019 Budget Update 2 Current year: Project Change +$100k Station site improvements +$90k, irrigation line change orders $10k, 8.12.19 Current Year: Project Change +$124k Total FAC: Project Change +$124k Accounting adjustment with T404190001 +$97k, IPC labor, expenses and additional costs for UG easements +$27k 11.11.19 Current Year: Carryover -$130k Total FAC: Project Change +$40k Easements delayed construction pushed work to 2020, increased landscaping cost, IPC commissioning labor, vehicle expenses more than estimated 2019 Budget Update 4 Current year: Project Change +$195k Accounting adjustment with T404190001 +$100k, UG easements +$30k, irrigation line change order $10k, IPC labor, expenses and additional costs for station site improvements, Budget Update Authorized to Spend 1.11.20 Current Year: No Change Total FAC: Project Change +$33k Estimated change order cost for unforeseen landscaping repairs 2.11.20 Current Year: +$60k Total FAC: Project Change +$60k Additional materials and change order for extra work missed in design. 4.8.20 Current Year: +$34k Total FAC: +$34k Change order for conduit location error. Cost to replace station yard gravel.