Loading...
HomeMy WebLinkAbout20230928IPC to Staff Supp 290 Attachment 1.pdfELDR180002 - ELDR New distribution station in central Pocatello Variance Notes Pre-Authorization Notes See the notes in ELDR180002_Solution_CLRIS CLRIS Budget ID Page (Description, Need, Consequence and notes) ELDR180002_BID_CLRIS - Submitted date: 2/26/2018, therefore no Budget in 2018 QUIN170001_BID_CLRIS - Submitted date: 1/5/2017, therefore no Budget in 2017 QUIN170001 had Budget in 2018 = $3,600,000, however since this was cancelled not shown in spreadsheet Authorized to Spend = $6.45M Actuals = $6.27M Microsoft Project Schedule Notes (PM managed schedules and routine variance notes) 2.11.17 Current Year: New Unbudgeted Project +606k Total FAC Change: +4.4M New 138/12.5kV station (Quinn) in Pocatello to provide capacity for customer growth. 2017 Budget Update 1 Accelerated per Customer's Request - Increase $980k for 2017. Will become QUIN170001. 2.11.18 Current Year: Deferred -$1.46M Total FAC: Project Change +$780k Deferred transmission construction, metalclad purchase from 2018 to 2019. Added costs for t-line foundations, swtiches, distribution duct-vault on Pole Line Road. Change Stl Matl to $628k Based on QUIN170001 budget of $3,600,000 4.11.18 Current Year: Project Change +$287k Total FAC: Project Change +$40k Transfered costs between years based on material deliveries. Increased cost for contract design. Total 2018 forecast $2.5M Budget Update Authorized to Spend 1.10.19 Total FAC: Project Change +$440k Project cost now incl 5.4% of OH costs. Contract costs higher than estimated. Metalclad switchgear +$150k, drilled pier foundations +$100k, substation contract +$200k, Panel labor $10k, PM labor +$20k, misc. site relocations $30k Budget Update Authorized to Spend 4.9.19 2019 Budget Update 2 Current Year: Project Change, deferred +$1.15M Design completion delayed const start, shifted $500k to 2019. Contract costs higher than estimated (station contract +$250k, metalclad switchgear +$150k, drilled pier foundations +$100k, IPC labor +$75k, misc. station site relocations $50k) Budget Update Authorized to Spend 11.11.19 Current Year: Deferred -$46k Total FAC Change: No Change Landscaping delayed to spring 2020 2019 Budget Update 3 Current Year: Project Change +$100k Misc. station materials +$35k, IPC labor and equip +$30k, remove large trees hanging over station fence +10k, fiber splicing +7k, and concrete testing not incl in estimate Budget Update Authorized to Spend 1.9.20 Current Year: Project Change +$38k Total FAC Change: +$45k Station engineering identified (3) 140' ground wells to be installed after station completion.