HomeMy WebLinkAbout20230928IPC to Staff Supp 284 Attachment 1.pdfELDR190001 - ELDR Construct two new 12.5-kV feeder ELDR-012 and ELDR-013 Variance Notes Pre-Authorization Notes This project was created as a separate Budget ID to support the substation project (ELDR180002). This is done so that different types of work (in this case, distribution feeders) can be managed in a schedule with appropriate resources disparate from the substation team. CLRIS Budget ID Page (Description, Need, Consequence and notes) ELDR190001_CLRIS Microsoft Project Schedule Notes (PM managed schedules and routine variance notes) 7/12/18 Current Year: Project Change +$339k Increased costs for steel poles, TLine easements, additional IPC labor hours, additional contract design plus $100k for ELDR180001 (ELDR-011) 9/12/18 Current Year: Project Change +$111k Total FAC: Project Change +$985k Increased expense for line easements (2018). Updated costs based on revised estimates. Budget Update 3 Current Year: Project Change +$142k Additional cost for Geotech 10/10/18 Current Year: No Change Total FAC: No Change 12/11/18 Current Year: Total FAC: Combined +$107k This project is being combined with ELDR180001 Budget Update 4 Current Year: Project Change +$110k Budget Update Authorized to Spend 2./11/19 Current Year: Project Change +$850k Contract construction costs higher than estimated by $725k. An additional $125k of material was charged in January which was thought to be issued in December. $850,000 increase for the current year was based on assumed 2019 budget of $875,000 5/7/19 Current Year: Project Change +$250k Total FAC Change: Project Change +$250k Additional cost to bore Pole Line Road (materials and contract), IPC labor, equipment higher than estimated to complete distribution line work Budget Update Authorized to Spend 6/10/19 Current Year: Project Change +$60k Total FAC Change: Project Change +$60k Property damage repairs higher than estimated ($30k), inspection expenses higher than estimated ($15k), extra materials for underground 7/10/19 Current Year: Project Change +$78k Total FAC Change: Project Change +$78k IPC labor, equipment charges, higher than estimated to complete distribution line work 30k, property damage repairs +10k, contractor costs, inspection costs higher than estimated 8/10/19 Current Year: Project Change +$100k Total FAC Change: Project Change +$100k Asphalt repair and rock actual quantities $70k more than estimated. Unexpected IPC labor and expenses, extra materials $30k. 9/11/19 Current Year: Project Change +$60k Total FAC Change: Project Change +$60k Contract change orders for overhead/cable install (+20k), asphalt repairs (+25k), unexpected IPC labor, misc. expenses 2019 Budget Update 4 Current Year: Project Change +$140k Actual asphalt repairs and rock excavation quantities $100k more than estimated, contract change orders for overhead/cable install +$20k, unexpected IPC labor, misc. expenses, work is complete Budget Update Authorized to Spend at Budget Update 04 based on August through October updates 1/10/20 Current Year: Deferred $15k Total FAC Change: No Change Private property repairs and WO reconcile delayed to 2020 2/10/20 Current Year: Deferred $15k Total FAC Change: No Change Private property repairs and WO reconcile delayed to 2020 3/9/20 Current Year: Project Transfer, Deferred +$100k Total FAC Change: Project Transfer, Deferred +$100k Transfer landscaping and groundwell install from ELDR180002 $84k. Deferred property damage repairs $15k requested last month