HomeMy WebLinkAbout20230928IPC to Staff Supp 283 Attachment 2.pdfRELC220001 - Line Relocations for ITD Extension of SH-16 from Chinden (SH-20/26) to I-84 Variance Notes Pre-Authorization Notes This project was identified by the Idaho Transportation Department and was not a planned Idaho Power capital project. Therefore, the Budget ID was directly authorized to accommodate the request and no pre-authorization notes, justification, or estimates exist. Rather, the Budget ID was created to capture costs and assign a project team to react to the Idaho Transportation Department request. CLRIS Budget ID Page (Description, Need, Consequence and notes) RELC220001_CLRIS Microsoft Project Schedule Notes (PM managed schedules and routine variance notes) 5/1/21 Current Year: Project Change- +$101,972 Total FAC: Project Change - +$707,562 This is a mandatory highway relocation project for SH-16 from I-84 to SH-20/26. ITD got funding to proceed with design and construction years ahead of what was previously planned. 7/1/21 2021 Budget Update 3 Current Year: Project Change - +$103K This is an ITD relocation project with partial reimbursement. The $103K in 2021 is for Engineering/Design/PM activities. Budget Update Authorized to Spend 12/1/21 Current Year: Project Change- The 11/1/21 estimate of $90K is now $41K. Total FAC: No Change - The 11/1/21 estimate of $718K is now $709K. My distribution design resources have no time for this project in December. 2/1/22 2022 Budget Update 1 Current Year: Project Change - The original budget of $588K has increased to $767K. This increase is due to pushing design from 2021 into 2022 as well as the labor rate increase. Budget Update Authorized to Spend 7/1/22 2022 Budget Update 3 Current Year: Project Change - The Budget Update 2 estimate of $783K is now $654K. ITD Reimbursement adjustments. Budget Update Authorized to Spend 10/1/22 2022 Budget Update 4 Current Year: Deferred - The baseline budget of $654K is now $410K. Some more of the construction slipped into 2023 due to ITD ROW delays. Budget Update Authorized to Spend 11/1/22 Current Year: Project Change/Accelerated - The baseline budget of 410K is now $1.07M. Total FAC: Project Change - The baseline of 1.12M is now $1.58K. Construction estimates have increased the forecast significantly. We are able to get started on more work in December that had been pushed into 2023. 12/1/22 Current Year: Project Change - The baseline budget of 1.07M is now $1.56M. Total FAC: Project Change - The baseline of 1.58M is now $0.62M. Material deliveries have increased the 2022 spend. ITD reimbursement adjustment has decreased the total project spend but moved to 2023. 2/1/23 Current Year: Project Change - The baseline budget of ($1.0M) is now ($1.025M). Total FAC: Project Change - The baseline budget of $849K is now $624K The overheads have been added to the calculation. 2023 Budget Update 1 Current Year - Project Change A lot of construction and the ITD reimbursement was pushed into 2023. Budget Update Authorized to Spend 7/1/23 2023 Budget Update 3 Current Year: Project Change - From ($1.13M) to ($0.87M). The construction costs (both labor and materials) at McMillan and at Chinden both exceeded the estimate. The forecasted ITD reimbursement as Franklin was reduced. Budget Update Authorized to Spend 9/1/23 Current Year: Deferred - The baseline budget of ($0.87M) is now ($1.27M). Total FAC: Project Change - The baseline budget of $1.0M is now $0.87M. 2023 construction got pushed into 2024 because of ROW delays. Still planning on collecting $3M reimbursement for the Franklin work in 2023.