Loading...
HomeMy WebLinkAbout20230119Staff 1-6 to IPC.pdfRILEY NEWTON DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION 9 PM D 50 PO BOX 83720 BOISE,IDAHO 83720-0074 SiCN (208)334-0318 IDAHO BAR NO.11202 Street Address for Express Mail: 11331 W CHINDEN BLVD,BLDG 8,SUITE 201-A BOISE,ID 83714 Attorney for the Commission Staff BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF IDAHO POWER )COMPANY'S APPLICATION FOR )CASE NO.IPC-E-22-30 AUTHORITY TO ESTABLISH )COMPENSATION FOR THE MANDATORY )INTERRUPTION REQUIREMENTOF )FIRST PRODUCTION SCHEDULE 20 -SPECULATIVE HIGH-)REQUESTOF THE DENSITY LOAD )COMMISSION STAFF )TO IDAHO POWER COMPANY Staff of the Idaho Public Utilities Commission,by and through its attorney of record, Riley Newton,Deputy Attorney General,requests that Idaho Power Company ("Company") provide the followingdocuments and information as soon as possible,but no later than THURSDAY,FEGRUARY 9,2023. This Production Request is to be considered as continuing,and the Company is requested to provide,by way of supplementary responses,additional documents that it,or any person acting on its behalf,may later obtain that will augment the documents or information produced. Please provide answers to each question,supporting workpapers that provide detail or are the source of information used in calculations,and the name,job title,and telephone number of the person preparing the documents.Please also identify the name,job title,location,and telephone number of the record holder. FIRST PRODUCTION REQUEST TO IDAHO POWER 1 JANUARY 19,2023 In addition to the written copies provided as response to the requests,please provide all Excel spreadsheets and electronic files on CD with formulas intact and enabled. REQUESTNO.1:Please provide all workpapers in electronic format with formulas enabled supporting the Company's proposed interruptioncompensation contained in the Application. REQUESTNO.2:Please explain if the Company considered any other methods for determining an interruption compensation structure for Schedule 20 besides the method discussed in the Application.If other methods were considered,please explain the method(s) considered and why these method(s)were not selected.If no other method(s)were considered, please explain why. REQUESTNO.3:If the Commission deferred approving a compensation structure until evaluation of cost assignment responsibility for Schedule 20 is completed in a general rate case,please explain how the Company would evaluate the compensation structure.In addition, please explain what information is required to perform the analysis and if the information would be available in the Company's next general rate case. REQUESTNO.4:If the Commission deferred approving a compensation structure until evaluation of cost assignment responsibility for Schedule 20 is completed in a general rate case,please explain how the Company would avoid the double crediting discussed on page 6 of the Application during the evaluation. REQUESTNO.5:If the Commission were to approve the Company's proposed compensation structure from the Application,please explain whether the Company would reevaluate the compensation structure during the next general rate case.If so,please explain how the Company would evaluate the compensation structure both with and without (no new Schedule 20 customers in the system)actual customer data.If not,please explain why. FIRST PRODUCTION REQUEST TO IDAHO POWER 2 JANUARY 19,2023 REQUESTNO.6:Please explain how the Company's proposed compensation structure from the Application avoids the double crediting discussed on page 6 of the Application. DATED at Boise,Idaho,this day of January 2023. Riley Newton Deputy AttorneyGeneral i:umisc:prodreq/ipce22.30rnme prod req l FIRST PRODUCTION REQUEST TO IDAHO POWER 3 JANUARY 19,2023 CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS 19th DAY OF JANUARY 2023,SERVED THE FOREGOING FIRST PRODUCTION REQUESTOF THE COMMISSIONSTAFFTOIDAHOPOWERCOMPANY,IN CASE NO.IPC-E-22-30,BY E-MAILING A COPY THEREOF,TO THE FOLLOWING: MEGAN GOICOECHEA ALLEN CONNIE ASCHENBRENNERLISANORDSTROMPAULGORALSKI IDAHO POWER COMPANY IDAHO POWER COMPANY PO BOX 70 PO BOX 70 BOISE ID 83707-0070 BOISE ID 83707-0070E-MAIL:mgoicoecheaallen@idahopower.com E-MAIL:caschenbrenner@idahopower.com Inordstrom@idahopower.com peoralski@idahopower.comdockets@idahopower.com S CRET Y CERTIFICATE OF SERVICE