Loading...
HomeMy WebLinkAbout20220218CEO 1-4 to IPC.pdf. I ;-i r,,t-l I .".'. r:::i. : i, Dll !. e:i..'.. | ..-.; I -) l,) l'L\) Kelsey Jae, ISB No. 7899 KELSEY JAE LLC 920 N. Clover Dr. Boise,ID 83703 Telephone : (208) 391 -2961 kelsey@kelseyjae.com Attorney for Clean Energt Opportunities for ldaho ' . !. :,- : t--t " :L i1 i,^!r.l , ;-., l\,| Michael Heckler Courtney White Clean Energy Opportunities for Idaho 3778 N Plantation River Drive, Suite 102 Boise,ID 83703 m ike @c leanenergyopportunities.com courtney@cleanenergyopportunities.com BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF IDAHO POWER COMPAI{Y'S 2021 INTEGRATED RESOURCE PLAN (IRP) rPC-E-21-43 CLEAN ENERGY OPPORTUNITIES FOR IDAHO's FIRST PRODUCTION REQUEST TO IDAHO POWER COMPANY COMES NOW Clean Energy Opportunities for Idaho (CEO), by and through its attorney of record, Kelsey Jae of the firm Kelsey Jae LLC, request that Idaho Power Company ("Idaho Power" or "the Company") provide the following documents within 2l days. This Production Request is continuing, and Idaho Power is requested to provide, by way of supplementary responses, additional documents that it or any person acting on its behalf may later obtain that will augment the documents produced. Please provide answers to each question with supporting workpapers that provide detail or are the source of information used in calculations. Please provide any Excel files with formulas active. Additionally, please include the CEO - First Production Request to Idaho Power Company - IPC-E-21-43 - | name and phone number of the person preparing the document, and the name, location, and phone number of the record holder and, if different, the witness who can sponsor the answer at hearing if need be. As allowed by IDAPA 31.01.01 .228.01, CEO agrees to Idaho Power depositing the response in an electronic depository. RROUF sr NO l. For each of the years 202l through 2040, please provide in Excel format the total annual number of short tons of CO2 emissions forecasted for each of the nine portfolios displayed on page 89 of 2021 IRP Appendix C: Technical Report. REOUEST NO 2. For the future scenarios where rapid electrification scenarios were evaluated (those being an increase of l0x the number of electric vehicles and residential heat pumps over the baseline projections), please provide in Excel format the amount of incremental electric load caused by the increased number of electric vehicles compared to the baseline electric vehicle load assumptions. Please provide these load data for each year from 2021 through 2040 in a format which shows whether the increased load varied by hour of the day, day of the week, month of the year or any other deviation from an application of the same amount of load to each hour in each ofthose 20 years. REOUEST NO 3. For the future scenarios where rapid electrification scenarios were evaluated (those being an increase of l0x the number of electric vehicles and residential heat pumps over the baseline projections) please provide in Excel format amount of incremental electric load caused by the increased number of residential heat pumps compared to the baseline residential heat pump load assumptions. Please provide these load data for each year from 2021 through 2040 in a format which shows whether the increased load varied by hour of the day, day CEO - First Production Request to Idaho Power Company - IPC-E-21-43 - 2 of the week, month of the year or any other deviation from an application of the same amount of load to each hour in each of those 20 years. REOUT'.ST NO 4. For the years 2021 through 2040, please provide the hourly Mid-C market enerry price estimate per MWh used in portfolio cost analyses. If other marginaUavoided energy cost estimates from other than the Mid-C market were used for any periods when the Mid-C market did not provide ttrat function within IPC's modeling, please so note. Please provide in Excel format these forecasted MWh prices for all twenty years, noting the forecasted market location (Mid-C or other market if required) as well as the year, day, month and hour ending for each value provided. Dated this lSth day of February,2022. Respectfrrlly submitted,t\ht Kelsey Jae, Attorney for CEO CEO - First Production Request to ldaho Power Company - IPC-E-2143 - 3 CERTIFICATE OF SERVICE I hereby certifr that on this l8th day of February,2022.1 delivered true and correct copies of the foregoing PRODUCTION REQUESTS to the following persons via the method of service noted: Electronic Mail Delivery Idaho Public Utilities Commission Jan Noriyuki Commission Secretary secretarv@ouc.idaho. sov Idaho PUC Staff Dayn Hardie Deputy Attorney General Idaho Public Utilities Commission davn.hardie@puc. idaho. sov Idaho Power Compony Lisa D. Nordstrom Tim Tatum Alison Williams I nordstrom@idahonower.com awi I I iams@idahooower.com ttatum @idahopower.com dockets@ idahooower.com Idaho Conservation League Benjamin J. Otto Emma E. Sperry botto@idahoconservation. ors esperry@ idahoconservation.org Industrial Customers of ldaho Power Peter J. Richardson Richardson Adams, PLLC peter@richardsonadams.com Dr. Don Reading dreadi ng@m indspring.com Kiki Leslie A. Tidwell, pro se ktidweI 12022 @.smai l.com rs\e Kelsey Jae Attorneyfor CEO CEO - First Production Request to ldaho Power Company -IPC-E-2143 - 4