Loading...
HomeMy WebLinkAbout20220121Staff 1-17 to IPC.pdfRILEY NEWTON DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, IDAHO 83720-007 4 (208) 334-03r8 IDAHO BAR NO. 11202 Street Address for Express Mail: I I33I W CHINDEN BLVD, BLDG 8, SUITE 2OI-A BOISE, ID 83714 Attorney for the Commission Staff BEFORB THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF'THE APPLICATION OF IDAHO POWER COMPANY FOR AUTHORITY TO ESTABLISH A NEW SCHEDULE TO SERVE SPECULATIVE HIGH.DENSITY LOAD CUSTOMERS CASE NO. IPC-E.21.37 FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY The Staff of the Idaho Public Utilities Commission, by and through its attorney of record, Riley Newton, Deputy Attorney General, requests that Idaho Power Company ('oCompany") provide the following documents and information as soon as possible, but no later than FRTDAY, FEBRUARY 11, 2022. This Production Request is to be considered as continuing, and the Company is requested to provide, by way of supplementary responses, additional documents that it, or any person acting on its behalf, may later obtain that will augment the documents or information produced. Please provide answers to each question, supporting workpapers that provide detail or are the source of information used in calculations, and the name, job title, and telephone number of the person preparing the documents. Please also identify the name, job title, location, and telephone number of the record holder. FIRST PRODUCTION REQUEST TO IDAHO POWER ) ) ) ) ) ) ) ) ) 1 JANUARY 21,2022 In addition to the written copies provided as response to the requests, please provide all Excel spreadsheets and electronic files on CD with formulas intact and enabled. RB,QUEST NO. 1: Please provide the workpapers used to derive the capacity costs and demand charge discussed on page 14 of the Application. Please include any source input data used. REQUEST NO. 2: Please explain the rationale for the Company's proposal to reallocate the portion of cost-of-service derived summer generation capacity costs from on-peak demand charge to a standard demand charge. RE,QUEST NO.3: Please provide the workpapers used to derive the marginal energy pricing discussed on page 15 of the Application. Please include any source input data used. REQUEST NO. 4: Please provide an electronic copy of the workpapers used to create Attachment 2, with all formulae enabled. REQUEST NO. 5: Please provide the definitions including any applicable measurable standards for the characteristics of a High Density Load (HDL) customer mentioned on page 12 of the Application and included in the proposed Schedule 20 tariff. REQUEST NO. 6: Please explain how the parameters for interruptible service discussed on page 14 of the Application were determined and are applicable to the proposed Schedule 20 class. Please also explain if the interruptible parameters will change if they are modified or not approved in IP C -E-21 -32. REQUEST NO. 7: In the Application, page 16, the Company states, "Upon Commission approval of a new schedule, the Company will transition qualiffing customers the Commission- approved Schedule 20." Please respond to the following: FIRST PRODUCTION REQUEST TO IDAHO POWER 2 JANUARY 21,2022 a. Please explain how the Company will be able to determine if an existing customer qualifies for Schedule 20, by including the specific measurable standards identified above. b. Please explain how the Company will be able to identiff if an existing customer starts cryptocurrency mining in the future. c. Please explain if the Company has identified other business operations, besides cryptocurrency mining, which may meet some of the criteria for Schedule20. REQUEST NO. 8: Please explain in detail how the design of this new customer class will prevent disaggregation and relocation as discussed on page 4 of the Application and how the Company plans to enforce compliance to prevent it. REQUEST NO. 9: Please provide all workpapers supporting the figures and tables found in the Application in Excel format with formulae intact. REQUEST NO. 10: Please provide a timeline of construction for the necessary upgrades to connect a proposed Schedule 20 customer, on average. REQUEST NO. 1l: Please provide a list of current Idaho Power customers that would qualifr for the proposed Schedule 20. REQUEST NO. 12: Please provide a list of Idaho Power customers that have intemrptible service agreements, like those proposed in Schedule 20. Do not include those that participate in a Demand Response program. REQUEST NO. 13: Please provide an average projected cost to upgrade the system to hook up a potential high-density load customer. Include a list of equipment and the respective cost in your response. REQUEST NO. 14: Please provide the accounting treatment of proposed Schedule 20 customers deposits and infrastructure upgrades. FIRST PRODUCTION REQUEST TO IDAHO POWER J JANUARY 21,2022 REQUEST NO. 15: If a customer that qualifies for this class doesn't want intemrptible service, what options does this customer have? Please explain. REQUEST NO. 16: Could the intemrptible requirement for Schedule 20 customers be replaced by a requirement to participate in some form of Demand Response? Please provide a discussion of the feasibility. REQUEST NO. 17: Please provide the notice to customers prior to interruption of servlce. DATED at Boise,Idaho, tnis Zl{ Ourof January 2022. Riley Deputy A General i:umisc:prodreq/ipce2l.37mme prod req I FIRST PRODUCTION REQUEST TO IDAHO POWER 4 JANUARY 21,2022 CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS 2IST DAY OF JANUARY 2022, SERVED THE FOREGOING FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY, IN CASE NO. IPC-E-2I-37, BY E.MAILING A COPY THEREOF, TO THE FOLLOWING: LISA NORDSTROM IDAHO POWER COMPANY PO BOX 70 BOrSE ID 83707-0070 E-MAIL: lnordstrorn@idahopower.com dockets@idahopower.com PETER J RICHARDSON RICHARDSON ADAMS PLLC 515 N 27TH ST PO BOX 7218 BOISE ID 83702 E-MAIL : oeter(E richardsonadams.com ELIZABETH A KOECKERITZ GIVENS PURSLEY LLP 60I W BANNOCK ST BOISE ID 82702 E-MAIL: eali@givenspursley.com CONNIE ASCHENBRENNER RATE DESIGN SENIOR MGR IDAHO POWER COMPANY PO BOX 70 BOISE ID 83707-0070 E-MAIL : caschenbrenner(E idahopower.com DON READING 6070 HILL ROAD BOISE ID 83703 E-MAIL: dreadine@mindspring.com SECRET Y CERTIFICATE OF SERVICE