Loading...
HomeMy WebLinkAbout20201013Shawpatin to Staff 1.pdf,- .l .*,} J* 4fEi;r"liiVEHiJ .r*ill*fiT 13 FH &: l9 I'r :.ii .'jf .-.,., .'- ,: -'-l,t-ili#lH*mI l;. i ' i::.;! '..q.'i$i,E!;e; Shawpatin figGap, LIC P0 Bor {{6 Ihh fals, ID 83303 shawpatinagcap @ gnailcou Matt Hunter Deputy Attorney General ldaho Public Utilities Commission PO Box 83720 Boise,ldaho 83720-00/. October L,2020 RE: Shawpatin AgCap, LLC Case No. IPC-E-20-34 Mud Creek White Hydro Project Dear Mr. Hunter, ln response to the First Production Request of the Commission Staff to Shawpatin AgCap, LLC dated September 24,2020: Request No. 1: al What is the nameplate capacity of each unit? Byron Jackson vertical unit is 223.8 KW. Horizonta! unit is rt4.8 KW b) When was each unit installed? Byron Jackon, 1985, 50 Hp vertical 1986, 60 Hp horizontal 2014 cl Please provide a diagram of the facility labeling the different units. See attached drawing d) Please describe the configuration of the two units and how they will be operated under different situations regarding water availability. The Byron Jackson runs during higher flows, which are August to December. The split case 50 Hp runs January to July during lower flows. The units do not run at the same time as there is not enough water to supply both units running together. This information was provided by the hydro plant operator, Scott Kaster, telephone number 208-731-5499. Records are held at Shawpatin AgCap, LLC., by Leslie lversen, telephone number 208-293-9110. Sincerely,M Leslie lversen, Member Shawpatin AgCap, LLC Enclosure: 1 Case No. IPC-E-20-34 Shawpain AgCq, LLC It4ud Creek Hydro First 09/24/2020 /-e a L,i'T1 c< / l.r"7 6 rb4 N e*fq/ (,a-<-{