Loading...
HomeMy WebLinkAbout20201008IPC to Staff 1-4.pdfRECEIVED 2020 October 08 AMl1:19 IDAHO PUBLIC UTILITIES COMMISSION rem. An IDACORp Company DONOVAN E. WALKER Lead Counsel dwal ker@idahopower.com October 8,2020 VIA ELECTRONIC MAIL Jan Noriyuki, Secretiary ldaho Public Utilities Commission 11331 West Chinden Blvd., Building 8 Suite 2O1-A Boise, ldaho 83714 Re Case No. IPC-E-20-34 Shawpatin AgCap, LLC/Mud Creek White Hydro Project ldaho Power Company's Application Regarding the Energy Sales Agreement Dear Ms. Noriyuki: Aftached for electronic filing is ldaho Power Company's Response to the First Production Request of the Commission Staff in the above entitled matter. lf you have any questions about the attached documents, please do not hesitate to contact me. Very truly yours, Zddtl<- Donovan E. Walker DEW:cld Enclosures DONOVAN E. WALKER (lSB No. 5921) ldaho Power Company 1221 West ldaho Street (83702) P.O. Box 70 Boise, ldaho 83707 Telephone: (208) 388-5317 Facsimile: (208) 388-6936 dwa lker@ idahopower.com Aftorney for ldaho Power Company BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION OF IDAHO POWER COMPANY FOR APPROVAL OR REJECTION OF AN ENERGY SALES AGREEMENT WITH SHAWPATIN AGCAP, LLC, FOR THE SALE AND PURCHASE OF ELECTRIC ENERGY FROM THE MUD CREEK WHITE CREEK HYDRO PROJECT. ) ) ) ) ) ) ) ) ) CASE NO. IPC-E-20-34 IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF COMES NOW, ldaho Power Company ("ldaho Powef or "Company"), and in response to the First Production Request of the Commission Staff to ldaho Power Company dated September 18,2020, herewith submits the following information: IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION REQUESTS OF THE COMMISSION STAFF - 1 REQUEST NO. 1: The nameplate capacity of Mud Creek White Hydro Project stated in the Energy Sales Agreement is 268.6 kW. However, the Company's Quarterly Cogeneration and Small Power Production Report ending March 31,2020 shows that the nameplate capacity is 205 kW. Please explain and reconcile the difference. RESPONSE TO REQUEST NO. 1: ldaho Power's Quarterly Cogeneration and Small Power Production Report lists a legacy value of 205 kW for the Mud Creek White Hydro Project based on a May 30, 1984, intra-company memo (provided as Attachment 1 to this Request) relating to interconnection studies applicable to the Mud Creek White Hydro Project. The total nameplate capacity of 268.6 kW for the facility as listed in the replacement Energy Sales Agreement ('ESA") is based on documentation provided by the project as part of the replacement ESA process. The facility has two generator units- -one is identified as223.8 kW and the other is 60 hp, which is equivalent to approximately 44.75 kW, bringing the total to 268.6 kW. Photos of the actual nameplates associated with the facility are provided as Attachment 2 to this Request. The response to this Request is sponsored by Michael Darrington, Energy Contracts Leader, ldaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION REQUESTS OF THE COMMISSION STAFF - 2 REQUEST NO. 2: The nameplate capacity described in the 1985 contract was 178 kW. Please list all the nameplate changes throughout the history of the project and discuss actions taken by the Company, including amending the contract, obtaining approval of a new contract, etc. Please provide documentation or other forms of evidence for actions taken. RESPONSE TO REQUEST NO. 2: The nameplate capacity as Iisted in the original 1985 Firm Energy Sales Agreement was revised pursuant to an updated Appendix B dated September 26,1985, that had provisions allowing for a total nameplate capacity of up to 308 kW. (See attached revised Appendix B). The response to this Request is sponsored by Michael Darrington, Energy Contracts Leader, ldaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION REQUESTS OF THE COMMISSION STAFF - 3 REQUEST NO. 3: Please provide the project resource capacity contribution in the Ioad and resource balance during the last five Company lntegrated Resource PIans, and how was the contribution determined? Please provide any calculations in Excel format with formula enabled. RESPONSE TO REQUEST NO. 3: Please see the attached confidential Excel file. The response to this Request is sponsored by Michael Darrington, Energy Contracts Leader, ldaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION REQUESTS OF THE COMMISSION STAFF - 4 REQUEST NO. 4: Please provide all available hourly generation data for the project. For periods when hourly generation data is not available, please provide the data for the smallest time interval available. RESPONSE TO REQUEST NO.4: ldaho Power does not have hourly generation data for the Mud Creek White Hydro Project under the original 1985 Firm Energy Sales Agreement ('FESA'). The attached confidential Excel file contains historical monthly generation data based on end-of-month meter reads as required by the FESA and provided by the project. The response to this Request is sponsored by Michael Darrington, Energy Contracts Leader, ldaho Power Company. Respectfully submitted this 8th day of October 2020 fuzdat4- DONOVAN E. WALKER Attorney for ldaho Power Company IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION REQUESTS OF THE COMMISSION STAFF - 5 CERTIFICATE OF SERVICE I HEREBY CERTIFY that on this 8th day of October 2020, I served a true and correct copy of the within and foregoing IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF upon the following named parties by the method indicated below, and addressed to the following: Leslie lversen P.O. Box 446 Twin Falls, lD 83303 208-293-9110 _Hand Delivered _U.S. Mail _Ovemight Mail _FAXX Email ShawpatinAq Cap@qma i l. com Commission Staff Matt Hunter Deputy Attomey General ldaho Public Utilities Commission 11331 W. Chinden Boulevard Building 8, Suite 201-A Boise, ldaho 83714 _Hand Delivered _U.S. Mail Overnight Mail _FAXX Email matt.hunter@puc.idaho.qov Christy Davenport, Legal Assistant IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION REQUESTS OF THE COMMISSION STAFF - 6