HomeMy WebLinkAbout20200930IPC to Sierra Club 1-2.pdfCHilh.
fr4,"1r I'J f;*
iiitirilP 38 Sfi llr 0?
',,, r.
-, i'itl;1tt 6{s}a
An IDACOnP Cdtrparry
LISAD. NORDSTROIUI
Lead Counrcl
lnordrtum0lda homr.conr
September 3A,2020
ELECTRONIC FILING
Jan Noriyuki, Secretary
ldaho Public Utilities Commission
11331 W. Chinden Boulevard
Building 8, Suite 201-A
Boise, ldaho 83714
Re: Case No. IPC-E-20-26
ln the Matter of ldaho Pourcr Company's Application for Authority to
Modify Schedule 84's Metering Requirement and to Grandfather Existing
Customers with Two Meters
Dear Ms. Noriyuki:
Attached for electronic filing, pursuant to Oder No. 34602, is ldaho Power
Company's Responses to Sierra Club's First Production Request, Nos. 1-2.
If you have any questions about the attached document, please do not hesitate to
contact me.
Very truly yours,
frL!ff^*t,*,
Lisa D. Nordstrom
LDN:slb
Attachment
LISA D. NORDSTROM (lSB No. 5733)
ldaho Power Company
1221 West ldaho Street (83702)
P.O. Box 70
Boise, ldaho 83707
Telephone: (208) 388-5825
Facsimile: (208) 3886936
lnordstrom@idahopower.com
Attorney for ldaho Power Company
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF IDAHO POWER
COMPANYS APPLICATION FOR
AUTHORITY TO MODIFY SCHEDULE
&4's METERING REQUIREMENT AND TO
GRANDFATH ER EXIST! NG CUSTOMERS
WTH TWO METERS.
)
)
)
)
)
)
)
CASE NO. IPC-E-20-26
IDAHO POWER COMPANY'S
RESPONSES TO SIERRA CLUB'S
FIRST PRODUCTION REQUEST
COMES NOW, ldaho Power Company ("ldaho Powef or'Company"), and in
response to the First Production Request of Sierra Club to ldaho Pourer Company dated
September 9,2020, herewith submits the folloring information:
IDAHO POWER COMPANY'S RESPONSES TO SIERRA CLUB'S FIRST
PRODUCTION REQUEST - 1
REQUEST NO. 1: For the entire year of 2019 and for the months of
Januarythrough August ol2O2O, please provide in Excelformatthe date and hour-ending
time of all load hours per year (8760+ data points per whole year). For each of these
data points, please provide the load being served during that hour.
RESPONSE TO REQUEST NO. 1: Please see Attachment 1 for the hour
ending system load for 2019 through August 2020. The column nMlM' represents system
load measured at generation Ieveland the column'Adjusted MW" rcpresents generation
level loads adjusted for demand rcsponse programs, which best represents the demand
requirements for the Company from its retail customers before any resources are
dispatched. Because the 2020 demand response data has not yet been validated, the
2020 "Adjusted lvlW" is not included in the Attachment.
The response to this Request is sponsored by Jodan Prassinos, Load Research
and Forecasting Manager, ldaho Power Company.
IDAHO POWER COMPANY'S RESPONSES TO SIERRA CLUB'S FIRST
PRODUCTION REQUEST.2
REQUEST NO.2; For the months of May through September inclusive
during the years 2017 through 2019 and for months of May through August 2420, please
provide in Excel format the date and hourending time of all load hours per the months
designated (3,672 data points for years 2017-2019 and 2,952 data points for year 2020r.
For each of these data points, please provide the total Schedule 24 load being served
during that hour.
RESPONSE TO REQUEST NO. 2: Please see Attachment 1 for the hour
ending inigation loads for months May through September for the years 2017 through
2019 and for the months of May through August tor 2A20. The information provided is
inclusive of allSchedule24 customers (net metering and standard service). The column
"lrrigation - M\M represents aggregated hourly meter data for the Schedule 24 customers
and the column "lrrigation Adjusted MW' represents aggregated hourly meter data
adjusted for demand response programs, which best represents the demand
requirements Schedule 24 customers before any resour@s are dispatched. Because the
2020 demand response data has not yet been validated, the 2020 "lrrigation Adjusted
MW' is not included in the Attachment.
The response to this Request is sponsored by Jordan Prassinos, Load
Research and Forecasting Manager, ldaho Power Company.
DATED at Boise, ldaho, this 3Oh day of September 2020.
"(* !.(,d,+r..*,
LISA D. NORDSTROM
Attorney for ldaho Power Company
IDAHO POWER COMPANY'S RESPONSES TO SIERRA CLUB'S FIRST
PRODUCTION REQUEST - 3
CERTIFICATE OF SERVICE
I HEREBY CERTIFY that on this 30th day of September 2020,1 served a true and
correct copy of the within and foregoing IDAHO POWER COMPANY'S RESPONSES TO
SIERRA CLUB'S FIRST PRODUCTION REQUEST upon the folloning named parties by
the method indicated below, and addressed to the following:
Commission Staff
Edward Jewell
Dep uty Attorney General
ldaho Public Utilities Commission
11331 West Chinden Blvd., Building I
Suite 201-A
Boise, Idaho 83714
ldaho lrrigation Pumperc Association, lnc.
Eric L. Olsen
ECHO HAWK & OLSEN, PLLC
505 Pershing Avenue, Suite 100
P.O. Box 6119
Pocatello, ldaho 83205
Hand Delivered
_U.S. Mail
_Overnight Mail
_F$(X Email edward.iewell@puc.idaho.oov
_Hand Delivered
U.S. Mail
Overnight Mail
_F$(X Email elo@echohawk.com
Anthony Yankel
12700 Lake Avenue, Unit 2505
Lakewood, Ohio 44107
Idaho Conservation League
Benjamin J. Otto
ldaho Conservation League
710 North 6e Street
Boise, ldaho 83702
Boiee Gity
Abigail R. Germaine
Deputy City Attorney
Boise City Attorney's Office
150 North Capitol Boulevard
P.O. Box 500
Boise, ldaho 83701-0050
_Hand Delivered
U.S. Mail
Overnight Mail_FA)(X Email tony@yankel.net
_Hand Delivered
U.S. Mail
_Overnight Mail
_FA)(X Email botto@idahoconservation.orq
Hand Elelivered
U.S. Mail
Overnight Mail_ Fru(X Email aoermaine@citvofuoise.org
IDAHO POWER COMPANY'S RESPONSES TO SIERRA CLUB'S FIRST
PRODUCTION REQUEST.4
Micron Technology, lnc.
Austin Rueschhoff
Thorvald A. Nelson
Holland & Hart, LLP
555 Seventeenth Street, Suite 3200
Denver, Colorado 80202
Jim Swier
Micron Technology, lnc.
8000 South FederalWay
Boise, ldaho 83707
ldaho Sierra Club
Kelsey Jae Nunez
KELSEY JAE NUNEZLLC
920 North Clover Drive
Boise, ldaho 83703
Lisa Young
Michael Heckler
ldaho Sierra Glub
503 West Franklin Street
Boise, ldaho 83702
lndividual
Russell Schiermeier
29393 Davis Road
Bruneau, ldaho 83604
Hand Delivered
U.S. Mail
Overnight Mail_ FN(X Email darueschhoff@hollandhart.com
tnelson@hollandhart. com
acbe@hollandhart.com
ohargano-amari@ holland hart. com
Hand Delivered
U.S. Mail
Overnight Mail_ FA)(X Email iswier@micron.com
_Hand Delivered
U.S. Mail
Overnight Mail
_F$(X Email kelsev@kelseyiaenunez.com
_Hand Delivered
U.S. Mail
Overnight Mail
_F$(X Email lisa.vouno@sienadub.ors
michae!.p. heckler@omail.com
_Hand Delivered
U.S. Mail
Overnight Mail
_FA)(X Email buvhav@omai!.com
Stephanie L. Buckner,
Executive Assistant
IDAHO POWER COMPANY'S RESPONSES TO SIERRA CLUB'S FIRST
PRODUCTION REQUEST - 5
BEFORE THE
IDAHO PUBLIC UTILITIES COMMISSION
cAsE No. lPc-E-20-26
IDAHO POWER COMPANY
ATTACHMENT 1 TO REQUEST NO. 1
(EXCEL SPREADSHEET ATTACHED TO EMAILI
TO
]DAHO POWER COMPANY'S RESPONSES TO SIERRA
CLUB'S FIRST PRODUCTION REQUEST
BEFORE THE
IDAHO PUBLIC UTILITIES COMMISSION
cAsE NO. IPC-E-20-26
IDAHO POWER COMPANY
ATTACHMENT 1 TO REQUEST NO. 2
(EXCEL SPREADSHEET ATTACHED TO EMAILI
TO
IDAHO POWER COMPANY'S RESPONSES TO SIERRA
GLUB'S FIRST PRODUGTION REQUEST