IN THE MATTER OF THE APPLICATION OF
IDAHO POWER COMPANY FOR APPROVAL
OF A POWER PURCHASE AGREEMENT WITH
JACKPOT HOLDINGS, LLC, FOR THE SALE
AND PURCHASE OF UP TO 220 MEGAWATTS
OF RE,NEWABLE SOLAR GENERATION.
.RECEIVED
i0l9 JU?{ 20 Pl{ 2: 2l
,,,, l,t#}l'JoY#fi l8*' o*
Street Address for Express Mail
472W. WASHINGTON
BOISE, IDAHO 83702-5918
Attorney for the Commission Staff
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
)
)
)
)
)
)
)
)
SECOND PRODUCTION
REQUEST OF THE
COMMISSION STAFF TO
IDAHO POWER COMPANY
The Staff of the Idaho Public Utilities Commission, by and through its attorney of record,
Edward Jewell, Deputy Attorney General, request that Idaho Power Company (Company) provide
the following documents and information as soon as possible, or by MONDAY,
JULY 8,2019.r
This Production Request is continuing, and the Company is requested to provide, by way of
supplementary responses, additional documents that it or any person acting on its behalf may later
obtain that will augment the documents produced.
Please provide answers to each question, supporting workpapers that provide detail or are
the source of information used in calculations. The Company is reminded that responses pursuant
to Commission Rules of Procedure must include the name and phone number of the person
preparing the document, and the name, location and phone number of the record holder and if
t Staff is requesting an expedited response. If responding by this date will be problematic, please call Stafls attorney at
(208) 334-0314.
SECOND PRODUCTION REQUEST
TO IDAHO POWER I JUNE 20,2019
CASE NO. IPC.E-19-14
different the witness who can sponsor the answer at hearing if need be. Reference IDAPA
31.0r.0t.228.
In addition to the written copies provided as response to the questions, please provide all
Excel and electronic files on CD with formulas activated.
REQUEST NO. 2l: Please explain in detail how the Company proposes that RECs
generated by the Jackpot Solar PPA will flow through the PCA to customers, including the sharing
percentage.
REQUEST NO. 22: Please explain if there is an opportunity to increase the value of the
Jackpot Solar PPA RECs by bundling those RECs with energy.
REQUEST NO. 23: Please provide the total cost of the Jackpot Solar PPA and the rate
impact to each customer class. Please provide supporting workpapers with formulas intact.
REQUEST NO.24: Please explain how the Idaho Power Solar Energy Production
Forecasting Model will be integrated with the Company's operations and risk management
planning. Agreement, Section 7.7 at34.
REQUEST NO. 25: Please provide the information requested in the attached Jackpot Solar
Economic Analysis Plan discussed on June 18, 2019 at the meeting between Idaho Power and
Commission Staff. See Attachment A for the Analysis Plan.
DATED at Boise, Idaho, this TlYourofJune 2olg.
.?5P
Edward J
Deputy A
i:umisc:prodreq/ipcel9. l4ejmerftnc prod req2
SECOND PRODUCTION REQUEST
TO IDAHO POWER 2
General
JUNE 2O,2OI9
Jackpot Solar Economic Analysis Plan
Purpose: To determine if both of the Jackpot Solar projects are economic under a range of scenarios that
include B2H.
Method: Step 1. Calculate the NPV difference between scenarios with the projects forced into the portfolio and
without the projects available to be selected for: l) Planning Carbon with High, Mid, and Planning Gas; and 2)
Planning Gas with Zero,Planrring, and High Carbon. Step 2.If a scenario forcing both projects into a portfolio
shows an uneconomic result, model that scenario with only the Jackpot Solar Project forced into the model.
Required Information: Model runsl which include both projects will need to be performed for scenarios:
Planning GasiPlanning Carbon, Mid Gas/Planning Carbon, and High Gas/Planning Carbon. Model runs which
remove both projects will need to be performed for the following scenarios: Planning Gas/Planning Carbon, and
Planning Gas/High Carbon. Model runs which include only the Jackpot Solar project will need to be performed
for scenarios: High Gas/Planning Carbon, Mid Gas/Planning Carbon, and PlanningGaslZerc Carbon. The NPV
will need to be provided for the following scenarios: Planning GaslZerc Carbon (Portfolio 13), and Mid
Gas/Planning Carbon (Portfolio I 8).
(A.) NPV with B.ZIJ and with Solar Projects (in $000's)
Natural Gas
(8.) NPV with B.1IJ and without Solar Projects (in $000's)
Natural Gas
(B. - A.) NPV difference with and without projects (in $000's)
Natural Gas
I It is estimated that 8 total model runs are required: 3 model runs including both projects, 2 model runs without projects, and 3 model
runs withjust the Jackpot Solar project
2 NPV for Portfolio I I under the Planning GaslZero Carbon scenario Attachment A
3 NPV for Portfolio I 8 under the Mid Gas/Planning Carbon scenario Case No. IPC-E- I 9- 1 4
Second Production Request
06120119 Page I of I
o
L
cqU
l-(!U
o
li
U
Plannin Mid
Need to ModelZero
I 799 Need to Model Need to ModelPlan
Generation
119I$
Plan Mid
Need Value 2Zero
Need to Model Need Value 3 I$s
Generation
Need to Model
Plann Mid
Zero : Without - With
: Without - With : Without - With : Without - With
Generation
: Without - With
CERTIFICATE OF SERVICE
I HEREBY CERTIFY THAT I HAVE THIS 20th DAY OF JUNE 2019,
SERVED THE FOREGOTNG SECOND PRODUCTION REQUEST OF THE
COMMISSION STAFF TO IDAHO POWER COMPANY, IN CASE
NO. IPC-E-19-14, BY MAILING A COPY THEREOF, POSTAGE PREPAID, TO
THE FOLLOWING:
DONOVAN WALKER
REGULATORY DOCKETS
IDAHO POWER COMPANY
PO BOX 70
BOISE rD 83707-0070
E-mail : dwalker@idahopower.com
dockets@idahopower. com
MATT LARKIN
IDAHO POWER COMPANY
PO BOX 70
BOISE ID 83707-0070
E-mail: mlarkin@idahopower.com
YS
CERTIFICATE OF SERVICE