Loading...
HomeMy WebLinkAbout20190401IPC to Vote Solar 1-14.pdfAn IDACORP Company LISA D. NORDSTROM Lead Counsel I nordstrom@idahooower.com April 1 ,2019 VIA HAND DELIVERY Diane Hanian, Secretary ldaho Public Utilities Commission 472 West Washington Street Boise, ldaho 83702 Re: Case No. !PC-E-18-15 Study of Costs, Benefits, and Compensation of Net Excess Energy Supplied by Customer On-Site Generation - ldaho Power Company's Response to Vote Solar's First Production Request to Idaho Power Dear Ms. Hanian Enclosed for filing in the above matter are an original and three (3) copies of ldaho Power Company's Response to Vote Solar's First Production Request to ldaho Power. Also enclosed are one (1) non-confidential disk and one (1) confidential disk containing information provided in response to Vote Solar's requests. Please handle the confidential information in accordance with the Protective Agreement executed in this matter. lf you have any questions about the enclosed documents, please do not hesitate to contact me. Very truly yours, ,qnil} - I., I I .i I ) Fl"i [: 5l 3Iffi*. a@ rdstrom b'p Lisa D. No LDN:csb Enclosures 1221 W. ldaho St. (83702) P.O. Box 70 Boise, lD 83707 LISA D. NORDSTROM (lSB No. 5733) ldaho Power Company 1221West ldaho Street (83702) P.O. Box 70 Boise, ldaho 83707 Telephone: (208) 388-5825 Facsimile: (208) 388-6936 I no rd strom @ id a h opower. com Attorney for ldaho Power Company BEFORE THE !DAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE PETITION OF IDAHO POWER COMPANY TO STUDY THE COSTS, BENEFITS, AND COMPENSATION OF NET EXCESS ENERGY SUPPLIED BY CUSTOMER ON-SITE GENERATION CASE NO. IPC-E-18-15 IDAHO POWER COMPANY'S RESPONSE TO VOTE SOLAR'S FIRST PRODUCTION REQUEST TO IDAHO POWER ) ) ) ) ) ) ) ) COMES NOW, ldaho Power Company ("!daho Power" or "Comp?[y"), and in response to Vote Solar's First Production Request to ldaho Power dated March 11, 2019, herewith submits the following information: IDAHO POWER COMPANY'S RESPONSE TO VOTE SOLAR'S FIRST PRODUCTION REQUEST TO IDAHO POWER - 1 I REQUEST NO. 1: Please indicate the trading date(s) on which IPC pulled ICE Futures data underlying Attachment 8a - Workpaper 1 - Energy Price lnputs. RESPONSE TO REQUEST NO. 1: The lntercontinental Exchange ("lCE") daily firm Mid-Columbia ('Mid-C") Peak and Off-Peak forward index prices provided in Idaho Power's response to the ldaho Public Utilities Commission Staffs ("Staffl') Production Request No. 1 in Attachment 8a - Workpaper 1 - Energy Price lnputs were pulled on August 13,2018. The response to this Request is sponsored by Matt Larkin, Revenue Requirement Senior Manager, ldaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO VOTE SOLAR'S FIRST PRODUCTION REQUEST TO IDAHO POWER.2 REQUEST NO. 2: Please provide the ICE Futures Daily Market Reports for both Heavy Load and Light Load hours that are the source of the Mid-C Forward Price Curve in "Attachment 8a - Workpaper 1 - Energy Price lnputs", sheet "Monthly Mid-C Fonruard Prices", cells C3:D158. Please provide the reports in their native PDF format, as obtained from the ICE website ://www.theice.com/ma RESPONSE TO REQUEST NO. 2: Throu gh its paid subscription, ldaho Power downloads the lCE futures daily market data for monthly Mid-C forward electric prices into an Excel database. This database is the source for the information provided in Attachment 8a - Workpaper 1 - Energy Price lnputs, sheet "Monthly Mid-C Fonruard Prices," cells C3:D158. The Company does not collect or retain the information in PDF format. The response to this Request is sponsored by Matt Larkin, Revenue Requirement Senior Manager, ldaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO VOTE SOLAR'S FIRST PRODUCTION REQUEST TO IDAHO POWER.3 REQUEST NO. 3: Please provide updated information for the ICE Futures Reports used within the "Attachment 8a - Workpaper 1 - Energy Price Inputs" file based on the most recent 15 trading days available. RESPONSE TO REQUEST NO. 3: Because ldaho Power's access to ICE is through a paid subscription, the Company is prohibited from providing monthly Mid-C fonruard electric prices for the most recent 15 trading days available. However, ICE makes its futures data for the previous seven trading days publicly available and can be accessed via the following link: https://www.theice.com/marketdata/reports/142. As such, ldaho Power has provided updated lCE forward monthly Mid-C Peak and Mid-C Off-Peak index prices, the same price index used within ldaho Power's response to Staff's Production Request No. 1 in Attachment 8a - Workpaper 1 - Energy Price lnputs, for the most recent seven trading days available as of March 28,2019, in the Excel file produced with this response. The response to this Request is sponsored by Matt Larkin, Revenue Requirement Senior Manager, ldaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO VOTE SOLAR'S FIRST PRODUCTION REQUEST TO IDAHO POWER - 4 REQUEST NO. 4: Please identify all fuel hedging activities and expenditures (if any) by IPC during each of the last ten years. For each hedging product purchased in the last ten years, please provide the trade date, start date, end date, price, volume, and any other information available regarding the hedging product purchased. RESPONSE TO REQUEST NO. 4: Please see the confidentia! Excel file provided with this response for the requested information. The confidential attachment will be made available to those parties who have signed the Protective Agreement in this matter. The response to this Request is sponsored by Tim Tatum, Vice President of Regulatory Affairs, ldaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO VOTE SOLAR'S FIRST PRODUCTION REQUEST TO IDAHO POWER.5 REQUEST NO. 5: Please describe any plans or protocols that IPC has in regards to future hedging activities. RESPONSE TO REQUEST NO. 5: ldaho Power transacts hedges in accordance with the risk guidelines outlined in its Energy Risk Management Policy ('ERMP") and Standards ("ERMS"). The ERMP and ERMS are confidential and will be made available to those parties who have signed the Protective Agreement in this matter. ERMS Appendices D and F can be viewed on-site at ldaho Power's corporate headquarters. Please contact Camila McClusky at (208) 388-5821 or Tami White at (208) 388-6938 to arrange a time. The response to this Request is sponsored by Tim Tatum, Vice President of Regulatory Affairs, ldaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO VOTE SOLAR'S FIRST PRODUCTION REQUEST TO IDAHO POWER.6 REQUEST NO. 6: ln the meeting on February 26,2019 Mr. Tatum referenced an existing NERA-derived marginal cost of service assessment on T&D costs. Please provide the most recent version of that assessment including any underlying workpapers in Excel format with formulas and links intact. RESPONSE TO REQUEST NO.6: The Com pany posted its 2018 Marginal Cost Analysis, including a written summary and Excel file, to the non-confidential FTP site for Case No. !PC-E-18-16 on March 12,2019. The conceptand design of the Company's marginal cost analysis is based on the National Economic Research Associates' ("NER,q'; marginal cost model and is used to derive energy and transmission capacity marginal costs that are applied to allocation factors in the Company's class cost-of- service model. Please note, the Company has not performed a NERA-based review on distribution marginal costs in the state of ldaho. The response to this Request is sponsored by Matt Larkin, Revenue Requirement Senior Manager, ldaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO VOTE SOLAR'S FIRST PRODUCTION REQUEST TO IDAHO POWER - 7 REQUEST NO. 7: Please provide PDF copies of ldaho Power's completed FERC Form 1 filings from 1995 to 2018, or the most recent year submitted. RESPONSE TO REQUEST NO. 7: The 2017 Federal Energy Regulatory Commission ("FERC") Form 1 filing is the most recent year submitted. The FERC Form 1 filings for 1995 through 2017 are provided in Attachments 1 through 23, respectively, produced with this response. The response to this Request is sponsored by Tim Tatum, Vice President of Regulatory Affairs, ldaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO VOTE SOLAR'S FIRST PRODUCTION REQUEST TO IDAHO POWER. S REQUEST NO. 8: Please provide the following peak demand information for 1995 to 2018: a. Summer Transmission Peak Demand (kW) b. Winter Transmission Peak Demand (kW) c. AnnualTransmission Peak Demand (kW) d. Annual Distribution Substation Peak Demand (kW) e. Annual Distribution Primary Peak Demand (kW) f . Annual Distribution Secondary Peak Demand (kW) RESPONSE TO REQUEST NO. 8: a-c. Idaho Power's transmission system peak is calculated monthly and reported annually within the publicly available ldaho Power FERC Form 1 report. The peak data is located on page 400; column b indicates the monthly peak megawatts. Please see the attachments provided with the Company's response to Vote Solar's Request No. 7 above for the FERC Form 1 filings for 1995 through 2017 . d. Distribution substation peak demand is collected by distribution substation transformer and peak season (summer and winter) and are provided in the confidential attachment produced with this response. Reasonably accurate information is available for transformers that are included in ldaho Power's Supervisory Control and Data Acquisition ("SCADA") system. Where SCADA does not exist, the peak demand is calculated manually, only as needed, to ensure transformer capacity is sufficient to serve anticipated peak demand. The peak demand and peak season for the distribution substation transformers are contained in the confidential attachment produced with this response. Data is IDAHO POWER COMPANY'S RESPONSE TO VOTE SOLAR'S FIRST PRODUCTION REQUEST TO IDAHO POWER - 9 provided for summer 1995-2018; the winter 2018-2019 data is not yet available. Not all transformers have data through 2018 (e.9., when there was no need to calculate the peak demand manually or when a transformer has been replaced with a new transformer). ln addition, the requested years predate some distribution substation transformers; therefore, the data is not available for all transformers in all years. e-f. ldaho Power does not track distribution primary or distribution secondary peak demand. The confidential attachment will be made available to those parties who have signed the Protective Agreement in this matter. The response to this Request is sponsored by Dave Angell, Transmission and Distribution Planning Manager, ldaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO VOTE SOLAR'S FIRST PRODUCTION REQUEST TO IDAHO POWER - 1O REQUEST NO. 9: Please provide any available information regarding the marginal unit providing energy during each hour of 2017 and 2018. RESPONSE TO REQUEST NO. 9: ldaho Power can identify which resources were on-line in each hour of the year but is not able to specify which unit is the marginal generating unit during each hour. Because ldaho Power's system is predominantly hydro based and hydro resources are essentially zero-variable cost resources, the dispatch of hydro generating units varies based on operational parameters and opportunity costs rather than a dispatch cost. For this reason, ldaho Power cannot identify the margina! unit providing energy during each hour. The response to this Request is sponsored by Matt Larkin, Revenue Requirement Senior Manager, ldaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO VOTE SOLAR'S FIRST PRODUCTION REQUEST TO IDAHO POWER - 11 REQUEST NO. 10: Please provide data on market purchases for energy including volumes, product attributes (day ahead, hour ahead, etc.), delivery point and prices during 2017 and 2018. RESPONSE TO REQUEST NO. 10: Please see the confidential Excel file provided in response to this Request. The confidential attachment will be made available to those parties who have signed the Protective Agreement in this matter. The response to this Request is sponsored by Matt Larkin, Revenue Requirement Senior Manager, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO VOTE SOLAR'S FIRST PRODUCTION REQUEST TO IDAHO POWER - 12 REQUEST NO. 11: For each customer class an alyzed in the provided cost of service study please provide the date and time of the customer class's non-coincident peak. RESPONSE TO REQUEST NO. 11: The dates and times of the non-coincident peak for each customer class analyzed in the cost-of-service study are set forth in the attachment provided in response to this Request. The referenced cost-of-service study and impacted workpapers were provided in the attachments to the Company's supplemental response to Staffs First Production Request filed on March 29,2019. The response to this Request is sponsored by Dave Angell, Transmission and Distribution Planning Manager, ldaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO VOTE SOLAR'S FIRST PRODUCTION REQUEST TO IDAHO POWER - 13 REQUEST NO. 12: Please identify the date and time of each of the 12 system monthly peaks identifies [src/ in the provided cost of service study. RESPONSE TO REQUEST NO. 12,,The dates and times of the system- coincident peak for each month of 2017 are set forth in the attachment provided in response to this Request. The referenced cost-of-service study and impacted workpapers were provided in the attachments to the Company's supplemental response to Staffs First Production Request filed on March 29,2019. The response to this Request is sponsored by Dave Angell, Transmission and Distribution Planning Manager, ldaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO VOTE SOLAR'S FIRST PRODUCTION REQUEST TO IDAHO POWER - 14 REQU ESLNO.tI_ll: Ptease provide all load research data available for IPC's net metering customers including hourly usage data for 2017 and 2018. For each customer please identify the rate schedule on which the customer takes service, use a unique identifier and avoid providing any personally identifying information. lf available, please provide information on the installed solar capacity associated with each net metering customer. RESPONSE TO REQUEST NO. 13: Please see the following attachments provided with this response for the 2017 and 2018 load research data for ldaho Power's net metering customers: o Attachment 1: ldaho 2017 Residential Service On-Site Generation; o Attachment 2: ldaho 20'18 Residential Service On-Site Generation; o Attachment 3: ldaho 2017 Small General Service On-Site Generation; o Attachment 4: ldaho 2018 Small General Service On-Site Generation; o Attachment 5: ldaho 2017 and2018 lrrigation Net Metering; and . Attachment 6: ldaho 2017 and 2018 Large General Service Net Metering. The response to this Request is sponsored by Dave Angell, Transmission and Distribution Planning Manager, ldaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO VOTE SOLAR'S FIRST PRODUCTION REQUEST TO IDAHO POWER - 15 REQUEST NO. 14: Please provide all load research data available for IPC's non-net metering customers including hourly usage data for 2017 and 2018. Foreach customer please identify the rate schedule on which the customer takes service, use a unique identifier and avoid providing any personally identifying information RESPONSE TO REQUEST NO. 14: Please see the following attachments provided with this response for ldaho Power's 2017 and 2018 load research data for non-net metering customers: o Attachment 1. ldaho 2017 Residential Sample; o Attachment 2: Idaho 2018 Residential Sample; . Attachment 3: ldaho 2017 Small General Service Sample; . Attachment 4: ldaho 2018 Small General Service Sample; . Attachment 5: ldaho 2017 lrrigation Sample; . Attachment 6: ldaho 20lS lrrigation Sample; o Attachment 7: ldaho 2017 Large General Primary Service; . Attachment 8: ldaho 2018 Large General Primary Service; . Attachment 9: ldaho 2017 Large General Secondary Service Sample; . Attachment 10: ldaho 2018 Large General Secondary Service Sample; o Attachment 11: ldaho 2017 Large General Transmission Service; . Attachment 12: ldaho 2018 Large General Transmission Service; . Attachment 13: ldaho 2017 Large Power Primary Service; . Attachment 14: ldaho 2018 Large Power Primary Service; o Attachment 15: Idaho 2017 Large Power Secondary Service; o Attachment 16: ldaho 2018 Large Power Secondary Service; IDAHO POWER COMPANY'S RESPONSE TO VOTE SOLAR'S FIRST PRODUCTION REQUEST TO IDAHO POWER - 16 o Attachment 17: ldaho 2017 Large Power Transmission Service; o Attachment 18: ldaho 2018 Large Power Transmission Service; o Attachment 19: ldaho 2017 Special Contract 1; o Attachment 20: ldaho 2018 Special Contract 1; o Attachment 21: ldaho 2017 Special Contract 2; o Attachment22: ldaho 2018 Special Contract 2; . Attachment 23: ldaho 2017 Special Contract 3; and o Attachment24: ldaho 2018 Special Contract 3. The response to this Request is sponsored by Dave Angell, Transmission and Distribution Planning Manager, ldaho Power Company. DATED at Boise, ldaho, this 1st day of April 2019. D Attorney for ldaho Power Company IDAHO POWER COMPANY'S RESPONSE TO VOTE SOLAR'S FIRST PRODUCTION REQUEST TO IDAHO POWER - 17 CERTIFICATE OF SERVICE I HEREBY CERTIFY that on this 1st day of April 2019 I served a true and correct copy of IDAHO POWER COMPANY'S RESPONSE TO VOTE SOLAR'S FIRST PRODUCTION REQUEST TO IDAHO POWER upon the following named parties by the method indicated below, and addressed to the following: Commission Staff Edward Jewell Deputy Attorney General !daho Public Utilities Commission 472 West Washington Street (83702) P.O. Box 83720 Boise, ldaho 83720-007 4 ldaHydro C. Tom Arkoosh ARKOOSH LAW OFFICES 802 West Bannock Street, Suite LP 103 P.O. Box 2900 Boise, ldaho 83701 Idaho Conseryation League and NW Energy Coalition Benjamin J. Otto ldaho Conservation League 710 North 6th Street Boise, Idaho 83702 F. Diego Rivas NW Energy Coalition 1101 8th Avenue Helena, Montana 59601 Idaho lrrigation Pumpers Association, lnc. Eric L. Olsen ECHO HAWK & OLSEN, PLLC 505 Pershing Avenue, Suite 100 P.O. Box 6119 Pocatello, ldaho 83205 _Hand Delivered _U.S. Mail _Overnight Mail _FAXX FTP SiteX Email edward.iewel!@puc.idaho.qov _Hand Delivered _U.S. Mai! _Overnight Mail _FAXX FTP SiteX Email tom.arkoosh@arkoosh.com erin.cecil@arkoosh. com _Hand Delivered _U.S. Mail _Overnight Mail _FAXX FTP SiteX Email botto@idahoconservation.oro _Hand Delivered _U.S. Mail _Overnight Mail _FAXX FTP SiteX Email dieoo@nwenergy.orq _Hand Delivered _U.S. Mail _Overnight Mai! _FAXX FTP SiteX Email elo@echohawk.com IDAHO POWER COMPANY'S RESPONSE TO VOTE SOLAR'S FIRST PRODUCTION REQUEST TO IDAHO POWER - 18 Anthony Yankel 12700 Lake Avenue, Unit 2505 Lakewood, Ohio 44107 Vote Solar Briana Kobor Vote Solar 358 South 700 East, Suite 8206 Salt Lake City, Utah 84102 David Bender Earthjustice 3916 Nakoma Road Madison, Wisconsin 537 11 Al Luna Nick Thorpe 1625 Massachusetts Avenue, NW, Suite 702 Washington, DC 20036 City of Boise Abigail R. Germaine Deputy City Attorney Boise City Attorney's Office 150 North Capitol Boulevard P.O. Box 500 Boise, ldaho 83701-0500 Idaho Clean Energy Association Preston N. Carter GIVENS PURSLEY LLP 601 West Bannock Street Boise, ldaho 83702 _Hand Delivered _U.S. Mail _Overnight Mail _FAXX FTP SiteX Email tonv@vankel.net _Hand Delivered _U.S. Mail _Overnight Mail _FAXX FTP SiteX Emai! briana@votesolar.oro _Hand Delivered _U.S. Mail _Overnight Mail _FAXX FTP SiteX Email dbender@earthjustice.orq _Hand Delivered _U.S. Mail _Overnight Mail_FAXX FTP SiteX Email aluna@earth iustice.orq nthorpe@ea rth i ustice. orq _Hand Delivered _U.S. Mail _Overnight Mail _FAXX FTP SiteX Email aoermaine@citvofboise.orq _Hand Delivered _U.S. Mail _Overnight Mail _FAXX FTP SiteX Email prestoncarter@qivenspursley.com IDAHO POWER COMPANY'S RESPONSE TO VOTE SOLAR'S FIRST PRODUCTION REQUEST TO IDAHO POWER - 19 ldaho Sierra Club Kelsey Jae Nunez KELSEY JAE NUNEZLLC 920 North Clover Drive Boise, ldaho 83703 Zack Waterman Michael Heckler ldaho Sierra Club 503 West Franklin Street Boise, ldaho 83702 PacifiCorp d/b/a Rocky Mountain Power Yvonne R. Hogle Rocky Mountain Power 1407 West North Temple, Suite 320 Salt Lake City, Utah 84116 Ted Weston Rocky Mountain Power 1407 West North Temple, Suite 330 Salt Lake City, Utah 84116 _Hand Delivered _U.S. Mai! _Overnight Mail _FAXX FTP SiteX Email kelsev@kelseyjaenunez.com _Hand Delivered _U.S. Mail _Overnight Mail _FAXX FTP SiteX Email zack.waterman@sierraclub.orq m ichael. p. heckler@smail. com _Hand Delivered _U.S. Mail _Overnight Mail _FAXX FTP SiteX Email yvonne.hoqle@pacificorp.com _Hand Delivered _U.S. Mail _Overnight Mail _FAXX FTP SiteX Email ted.weston@pacificorp.com Ch IDAHO POWER COMPANY'S RESPONSE TO VOTE SOLAR'S FIRST PRODUCTION REQUEST TO IDAHO POWER - 20