Loading...
HomeMy WebLinkAbout20181121Staff 1 to IPC.pdfSEAN COSTELLO DEPUTY ATTORNEYS GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, IDAHO 83720.0074 (208) 334-0312 IDAHO BAR NOS.8743 RECEIVED 2t118'#SY 2l Pil 2: I I Street Address for Express Mail: 472 W. WASHINGTON BOISE, IDAHO 83702-5918 Attorneys for the Commission Staff BEFORE THE IDAHO PUBLIC UTILITIBS COMMISSION IN THE MATTER OF THE PETITION OF IDAHO POWER COMPANY TO STUDY THE COSTS, BENEFITS, AND COMPENSATION OF NET EXCESS ENERGY SUPPLIED BY CUSTOMER ON-SITE GENERATION. CASE NO. IPC-E-I8-15 FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY The Staff of the Idaho Public Utilities Commission requests that Idaho Power Company (ldaho Power; Company) provide the following documents and information as soon as possible, and no later than WEDNESDAY, DECEMBER 12,2018. This Production Request is continuing, and the Company is requested to provide, by way of supplementary responses, additional documents that it or any person acting on its behalf may later obtain that will augment the documents produced. Please provide answers to each question, supporting workpapers that provide detail or are the source of information used in calculations. The Company is reminded that responses pursuant to Commission Rules of Procedure must include the name and phone number of the person preparing the document, and the name, location and phone number of the record holder and if different the witness who can sponsor the answer at hearing if need be. See IDAPA 3 | .01 .01 .228 . In addition to the written copies provided as response to the questions, please provide all Excel and electronic files on CD with formulas activated. FIRST PRODUCTION REQUEST TO IDAHO POWER ) ) ) ) ) ) ) ) ) I NOVEMBER 21 ,2018 REQUEST NO. l: In Order No. 34046, the Commission ordered "an Idaho Power specific on-site generation docket to study the costs and benefits of net metering on Idaho Power's system, proper rates and rate design, alongside the related issues of compensation for net excess energy." See Order No. 34046 at22. Please provide all relevant studies and reports conducted by the Company or on its behalf within the last 3 years. DATED at Boise, Idaho, this Z / day of November 2018. Sean Co Deputy Attorney General i:umisc:prodreq/ipcel 8.1 5scmm prod reql FIRST PRODUCTION REQUEST TO IDAHO POWER 2 NOVEMBER 2I,2018 CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS 21't DAY OF NOVEMBER 2018, SERVED THE FOREGOING FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY, IN CASE NO. IPC-E-18-15, BY MAILING A COPY THEREOF, POSTAGE PREPAID, TO THE FOLLOWING: LISA D NORDSTROM IDAHO POWER COMPANY PO BOX 70 BOISE ID 83707-0070 E-MAIL: lnordstrom@idahopower.corn BENJAMIN J OTTO ID CONSERVATION LEAGUE 710 N 6TH STREET BOISE ID 83702 E-MAIL: botto@idahoconservation.org ERIC L OLSEN ECHO HAWK & OLSEN PLLC PO BOX 6119 POCATELLO ID 83205 E-MAIL: elo@echohawk.com TIM TATUM IDAHO POWER COMPANY PO BOX 70 BOrSE ID 83707-0070 E-MAIL: ttaturn@idahopower.com ELECTRONIC ONLY dockets@idahopower. com ANTHONY YANKEL I27OO LAKE AVE LINIT 2505 LAKEWOOD OH 44107 E-MAIL: tony@yankel.net ARY CERTIFICATE OF SERVICE