Loading...
HomeMy WebLinkAbout20180622IPC to Staff Supplemental 2.pdf3Effi*o An loAcoRP company June 22,2018 VIA HAND DELIVERY Diane Hanian, Secretary ldaho Public Utilities Commission 472 West Washington Street Boise, ldaho 83702 Re: Case No. IPC-E-18-08 ldaho Department of Administration's Petition for Exemption from the ldaho Public Utilities Commission Master-Metering Standards - ldaho Power Company's SUPPLEMENTAL Response to Staff's First Production Request Dear Ms. Hanian Enclosed for filing in the above matter are an original and three (3) copies of ldaho Power Company's SUPPLEMENTAL Response to the First Production Request of the Commission Staff ("Staffl') to ldaho Power Company. Also enclosed are four (4) copies of confidential disks containing information responsive to Staff's production requests. Please handle the confidential information in accordance with the Protective Agreement executed in this matter. lf you have any questions about the enclosed documents, please do not hesitate to contact me. Very truly yours, LISA D. NORDSTROM Lead Counsel I nordstrom@idahopower.com LDN:kkt REC E IVED ItlS iUf+ 22 PH hr 2 j ', -'rl l/'ai ,i . ,. r ;..t*l l\yr I :': ,1:,: '^!f,{!llSSI0F.i X,r- 9-1(ae,-*,-- Lisa D. Nordstrom Enclosures LISA D. NORDSTROM (lSB No. 5733) ldaho Power Company 1221\Nest ldaho Street (83702) P.O. Box 70 Boise, ldaho 83707 Telephone: (208) 388-5825 Facsimile: (208) 388-6936 I n ord strom @ ida h opowe r. com F.ECEIVED ?fll$ JUH 22 Pll hr 2l li-r.:,iiii irUBLlC I i ;i-:'li l- ;'cortt'ttsstoN Attorney for ldaho Power Company BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE PETITION OF THE IDAHO DEPARTMENT OF ADMINISTRATION FOR AN EXEMPTION FROM THE IDAHO PUBLIC UTILITIES COMM!SSION'S MASTER-METERI NG RULES FOR ELECTRIC UTILITIES AND THE IDAHO POWER MASTER METERING STANDARDS ) ) ) ) ) ) ) ) ) CASE NO. tPC-E-18-08 IDAHO POWER COMPANY'S SUPPLEMENTAL RESPONSE TO THE F!RST PRODUCTION REQUEST OF THE COMMISSION STAFF COMES NOW, ldaho Power Company ("ldaho Power"), and in response to the First Production Request of the Commission Staff to ldaho Power Company dated May 18, 2018, herewith supplements the following information: IDAHO POWER COMPANY'S SUPPLEMENTAL RESPONSE TO THE FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF - 1 REQUEST NO. 2: Please explain what work IDOA has asked ldaho Power to do to modify the Campus to meet ldaho Power's requirements to maintain the power distribution system to each building or identified electrical meters on the Campus. To the extent available, your explanation should include details like: a. Scope of Supply; i. A description of the work; ii. Schematic drawings representing the requested/necessary modifications; iii. Physical plan and elevation drawings identifying the requested modifications; b. A detailed material estimate with itemized component pricing; c. A detailed labor estimate by worker classification, hours, and rate; d. A detailed support equipment estimate by type, hours, and rate; e. Detailed accounting of indirect costs; f. Summary table of the subtotaled itemized costs; and g. Anticipated duration and schedule. SUPPLEMENTAL RESPONSE TO REQUEST NO. 2: This response supplements ldaho Power's original response dated June 1,2018. ldaho Power performed two construction studies to determine what would be necessary for ldaho Power to own, operate, and maintain electrical facilities beyond the point of delivery ("POD") at the ldaho Department of Administration's ("lDOA") Chinden Campus. IDAHO POWER COMPANY'S SUPPLEMENTAL RESPONSE TO THE FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF - 2 Version 1 locates the POD at the Hewlett Packard Substation, and provides the necessary configuration if the ldaho Public Utilities Commission ("Commission") grants IDOA's request for an exemption to the Commission's master metering rules. Version 2 locates the POD at each building and/or each chiller at the Chinden Campus under a traditional metering arrangement where no master metering occurs. As further explained in the studies, while Idaho Power has made considerable efforts to estimate the costs and schedule associated with the necessary upgrades in each study, the cost estimates are conceptual in nature and do not represent a refined engineering design. a,g) Please see the construction studies provided on the Confidential CD for responses to items a, and g above. b-0 Please see the summaries provided on the confidential CD for the responses to items b-f above. The confidential CD will only be provided to those parties that have executed the Protective Agreement in this matter. The response to this Request is sponsored by Connie Aschenbrenner, Rate Design Manager, ldaho Power Company. DATED at Boise, ldaho, this 22nd day of June 2018. X"P il-,,t t "r.-6/ Attorney for ldaho Power Company IDAHO POWER COMPANY'S SUPPLEMENTAL RESPONSE TO THE FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF - 3 CERTIFICATE OF SERVICE I HEREBY CERTIFY that on the 22nd day of June 2018 I served a true and correct copy of IDAHO POWER COMPANY'S SUPPLEMENTAL RESPONSE TO THE FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF upon the following named parties by the method indicated below, and addressed to the following: ldaho Department of Administration Julie K. Weaver Deputy Attorney General Contracts and Administrative Law Division 954 W. Jefferson, 2nd Floor Boise, ldaho 83720-001 0 Commission Staff Karl Klein Deputy Attorney General !daho Public Utilities Commission 47 2 W est Wash i ngton (83702) P.O. Box 83720 Boise, ldaho 83720-007 4 _Hand DeliveredX U.S. Mail _Overnight Mail _FAXX Email iulie.weaver@aq.idaho.oov X Hand Delivered _ U.S. Mail _ Overnight Mail _ FAXX Email karl.klein@puc.idaho.qov t/ a-..---krr\bh ) bux-lA KTf,er[ Towdl, Executive Assistant IDAHO POWER COMPANY'S SUPPLEMENTAL RESPONSE TO THE FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF - 4