Loading...
HomeMy WebLinkAbout20180518Staff 1-2 to IPC.pdfKARL T. KLEIN DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, IDAHO 83720-0074 (208) 334-0320 IDAHO BARNO.5156 IN THE MATTER OF THE PETITION OF THE ) IDAHO DEPARTMENT OF ADMINISTRATION ) FOR AN EXEMPTTON FROM THE rDAHO ) PUBLIC UTILITIES COMMISSION'S MASTER. ) METERING RULES FOR ELECTRIC ) UTILITIES AND THE IDAHO POWER ) MASTER.METERING STANDARDS. ) CASE NO. IPC.E.18-08 FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY REC T I VTD f$l8tr,1Y lB plt t: il ,, ;' ri,iilij,:ttfl& | 8*, o* Street Address for Express Mail 472W. WASHINGTON BOISE, IDAHO 83702-5918 Attorneys for the Commission Staff BEFORE THB IDAHO PUBLIC UTILITIES COMMISSION The Staff of the Idaho Public Utilities Commission, request that Idaho Power Company (Idaho Power or Company) provide the following documents and information as soon as possible, and no later than FRIDAY, JUNE 1,2018.1 Please provide answers to each question and supporting workpapers that detail, or are the source of information used in, any calculations. Besides the written copies provided as response to the questions, please provide all Excel and electronic files on CD with formulas activated. I Staffis requesting an expedited response. If responding by this date will be problematic, please call Staff s attorney at (208) 334-0320. FIRST PRODUCTION REQUEST TO IDAHO POWER 1 MAY 18,2018 These production requests and interrogatories are continuing. IDOA is requested to provide, by way of supplementary responses, additional documents and information that it or any person acting on its behalf may later obtain that will augment the documents and information produced. In preparing your responses, please restate in full each question asked, then state in full your response to the question and the name and telephone number of the person(s) who prepared the response and would be able to answer questions about it or sponsor it at hearing if needed. See IDAPA 31.01.01.228. REQUEST NO. 1: Staff understands that Idaho Power provides primary service to the State of Idaho's Chinden Office Complex Campus through two primary meters, with the points of delivery being at Idaho Power's substation next to the Campus on Cloverdale Road. Building 8, currently occupied by Sykes Enterprises, is served by one primary meter; the remaining buildings on the Campus are served by the other primary meter. Idaho Power does not currently own or maintain any electrical facilities or metering equipment beyond the point of delivery. The service provided to Building 8 cannot be interconnected electrically to any other building on the premises (Rule C of Idaho Power's Tariff). Is Staff s understanding correct? Please provide an overview of how Idaho Power provides service to the Campus. REQUEST NO. 2: Please explain what work IDOA has asked Idaho Power to do to modify the Campus to meet Idaho Power's requirements to maintain the power distribution system to each building or identified electrical meters on the Campus. To the extent available, your explanation should include details like: a. Scope ofSupply; i. A description of the work; ii. Schematic drawings representingthe requested/necessarymodifications; iii. Physical plan and elevation drawings identifying the requested modifications; b. A detailed material estimate with itemized component pricing; c. A detailed labor estimate by worker classification, hours, and rate; d. A detailed support equipment estimate by type, hours, and rate; FIRST PRODUCTION REQUEST TO IDAHO POWER MAY 18, 20182 e. Detailed accounting of indirect costs; f. Summary table of the subtotaled itemized costs; and g. Anticipated duration and schedule. DATED at Boise,Idaho, this $'82 day of May 2018. 4.or Attorney General Technical Staff: Beverly Barker (16) Rick Keller (17) umisc:prodreq/ipcel8.8kkrkrfbb prod req I to ipc FIRST PRODUCTION REQUEST TO IDAHO POWER J MAY 18, 2018 CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS l8th DAY OF MAY2O18, SERVED THE FOREGOING FIRST PRODUCTION REQUEST OF THE COMISSION STAFF TO IDAHO POWER COMPANY, IN CASE NO. IPC-E-18-08, BY MAILING A COPY THEREOF, POSTAGE PREPAID, TO THE FOLLOWING: JULIE K WEAVER DEPUTY ATTORNEY GENERAL DEPT OF ADMISTRATION PO BOX 83720 BOISE rD 83720-0010 E-mail : i ulie.weaver@ag. idaho. gov LISA D NORDSTROM REGULATORY DOCKETS IDAHO POWER COMPANY PO BOX 70 BOISE ID 83707-0070 E-mail : lnordstrom@idahopower.com dockets@idahopower. com CONNIE ASCHENBRENNER IDAHO POWER COMPANY PO BOX 70 BOrSE ID 83707-0070 E-mail : caschenbrenner@idahopower. com CERTIFICATE OF SERVICE