JULIA A. HILTON
Senior Counsel
ihilton@idahopower.com
June 25,2018
VIA HAND DELIVERY
Diane Hanian, Secretary
ldaho Public Utilities Commission
472 West Washington Street
Boise, ldaho 83702
Case No. !PC-E-18-03
2017 Demand-Side Management Expenses - ldaho Power Company's
Response to the Second Production Request of the Commission Statf
Dear Ms. Hanian
Enclosed forfiling in the above matter please find an originaland three (3) copies of
ldaho Power Company's Response to the Second Production Request of the Commission
Staff.
Also enclosed are four (4) copies of non-confidential disks containing information
responsive to Staff's production requests.
Very truly yours,
Julia A
JAH:csb
Enclosures
1221 W. ldaho St. (83702)
P.O. Box 70
Boise, lD 83707
Re
(
JULIA A. HILTON (lSB No. 7740)
ldaho Power Company
1221West ldaho Street (837021
P.O. Box 70
Boise, ldaho 83707
Telephone: (208) 388-61 17
Facsimile: (208) 388-6936
i h ilton@ idahopower. com
REC E IVE D
2010 JUH 25 Pt{ h: l+0
l,';,'.i- il i}JSLIC
, i 'i ;Il;.S rcl'tutsslON
Attorney for ldaho Power Company
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF IDAHO POWER
COMPANY'S APPLICATION FOR A
DETERMINATION OF 2017 DEMAND-
S!DE MANAGEMENT EXPENSES AS
PRUDENTLY INCURRED
CASE NO. tPC-E-18-03
IDAHO POWER COMPANY'S
RESPONSE TO THE SECOND
PRODUCTION REQUEST OF
THE COMMISSION STAFF
COMES NOW, ldaho Power Company ("!daho Power" or "Company"), and in
response to the Second Production Request of the Commission Staff to ldaho Power
Company dated June 4, 2018, herewith submits the following information:
IDAHO POWER COMPANY'S RESPONSE TO THE SECOND
PRODUCTION REOUEST OF THE COMMISSION STAFF - 1
)
)
)
)
)
)
)
)
REQUEST NO. 18: Please provide the version of the ldaho Power Technical
Reference Manual that was used for the Company's 2017 DSM Annual Report.
RESPONSE TO REQUEST NO. 18: Please see the PDF provided on the
enclosed CD for ldaho Power's Technical Reference Manual 1.7 prepared by ADM
Associates, !nc. The manual may also be found on ldaho Power's website in the
Company's Demand-Side Management 2015 Annual Report, Supplement 2:
Evaluations starting on page 447 of 854 of the PDF and via the following link:
https://docs.idahopower.com/pdfs/AboutUs/RatesRequlatory/Reports/DSM 2015Suoplement2.pdf.
The response to this Request is sponsored by Pete Pengilly, Customer Research
and Analysis Leader, ldaho Power Company.
IDAHO POWER COMPANY'S RESPONSE TO THE SECOND
PRODUCTION REQUEST OF THE COMMISSION STAFF - 2
REQUEST NO. 19: Please provide the costs incurred, savings achieved, and
findings for each portion of the Commercial and lndustrial custom efficiency offering:
a. MunicipalWaterSupplyOptimizationCohort;
b. Waste Water Energy Efficiency Cohort;
c. Continuous lmprovement Energy Cohort for Schools; and
d. Streamlined Custom Efficiency.
RESPONSE TO EOUEST NO. 19 : Costs incurred, savings achieved, and
findings for each portion of the Commercial and lndustrial ('C&l') custom efficiency
offering are summarized below. For the cohort offerings, there is lag for achieved
savings and the upfront costs of developing the offering in the first year. Upfront costs
include program development, design, and implementation with the cohort. Annual
expenses may not have a direct relationship with savings achieved in the same year,
and future annual energy savings may be a result of upfront expenses incurred in prior
years as it takes some time for the cohort participants to become educated on, and
comfortable with, making changes to their operations. Participants implemented many
energy management principles, including forming energy teams, setting energy goals,
and establishing energy policies in their respective organizations for persistence of
savings. The Company has found the participants'willingness and ability to implement
operational changes varied widely.
Page Nos. 122-125 of ldaho Power's Demand-Side Management 2017 Annual
Report include additional details for each offering, and may be accessed through ldaho
Power's website via the following link:
https://docs.idahopower.com/pdfs/EneroyEfficiency/Reports/2O17DSM.pdf.
IDAHO POWER COMPANY'S RESPONSE TO THE SECOND
PRODUCTION REQUEST OF THE COMMISSION STAFF - 3
a. Municipal Water Supplv Optimization Cohort
ldaho Power ldaho Rider Expenses in 2017: $142,074.75
Savings Achieved: First year savings wil! be claimed in 2018.
Findings: Energy savings changes implemented included reducing leaks,
improving loading/operating more consistently, reducing pumping in circles, reducing
losing pressure prematurely, reducing leaping (skipping a pressure zone), changing well
settings, changing pump settings, using lower energy intensity water sources first, and
heating and cooling well houses based on equipment needs instead of comfort
b. Wastewater Enersv Efficiencv Cohort
ldaho Power ldaho Rider Expenses in2017: $19,500
Savings Achieved in 2017:. 2,454,702 kilowatt-hours ("kWh")/year.
Findings: Many of the costs for this cohort were incurred in 2014, the first
year of this program. Energy savings changes implemented included lowering
dissolved oxygen set points, reducing ultraviolet disinfection intensity, reducing aerobic
digestion aeration air flow, moving to a modified biological nutrient removal process
when weather allows, and in some cases, turning off certain process equipment
intermittently or seasonally.
c. Continuous lmprovement Energy Cohortlor Schqols
ldaho Power ldaho Rider Expenses in 20'17: $307,474.43
Savings Achieved: First year savings will be claimed and incentives paid
in 2018
Findings: Customers implemented low-cost and no-cost energy
efficiency improvements by actions as simple as turning off equipment or adjusting
IDAHO POWER COMPANY'S RESPONSE TO THE SECOND
PRODUCTION REQUEST OF THE COMMISSION STAFF - 4
control points for systems, performing lighting schedule changes, reviewing overrides of
preset schedules, and making sure unoccupied times were taken into account in control
systems. lndividual principal support from the participating school is crucial to drive
results within its facility. Most districts did not start realizing energy savings unti! three
to six months after program start.
d. Streamlined Custom Efficiencv
ldaho Power ldaho Rider Expenses in2017: $1,089,229
Savings Achieved : 4,388,445 kWh/year.
Findings: This offering provides custom incentives for small compressed-
air system improvements, fast-acting doors in cold storage spaces, refrigeration
controllers for walk-in coolers, and process-related variable frequency drives. The
offering is popular with C&l customers for smaller projects where calculations are
simpler and the ldaho Power contractor works directly with the customer and vendor to
submit project information to ldaho Power.
The response to this Request is sponsored by Pete Pengilly, Customer Research
and Analysis Leader, ldaho Power Company.
IDAHO POWER COMPANY'S RESPONSE TO THE SECOND
PRODUCTION REQUEST OF THE COMMISSION STAFF - 5
REQUEST NO. 20: Please provide the updated marketing materials and
technical sheets for the Commercial and lndustrial Energy Efficiency Program as
referenced in the marketing activities section on page 126 of the 2017 DSM annual
report.
RESPONSE TO REQUEST NO. 20: Please see the documents provided on the
enclosed CD for copies of the updated marketing materials and technical sheets for the
Commercial and lndustria! Energy Efficiency Program referenced on page 126 of the
2017 Demand-Side Management Annual Report.
The response to this Request is sponsored by Pete Pengilly, Customer Research
and Analysis Leader, ldaho Power Company.
IDAHO POWER COMPANY'S RESPONSE TO THE SECOND
PRODUCTION REQUEST OF THE COMMISSION STAFF.6
REQUEST NO. 21: The Company indicated several waves of direct mail were
sent to business customers to highlight retrofits and inform customers of incentives for
New Construction and Custom Projects on page 126 of the 2017 DSM annual report.
Was a new set of business customers reached with each mailing or did the same
customers receive multiple mailings with the same outreach materials?
RESPONSE TO REQUEST NO. 21: The direct mail piece that highlighted
retrofits and informed customers of new construction and custom project incentives was
sent to essentially the same group of customers on two different occasions, April and
November. Maintaining frequent messaging is important for continued awareness of
energy efficiency programs and helps ldaho Power incentives remain top-of-mind for
the customer. Please refer to the Company's response to Staffs Request No. 20 for
copies of the direct mailings.
The response to this Request is sponsored by Pete Pengilly, Customer Research
and Analysis Leader, Idaho Power Company.
DATED at Boise, ldaho, this 25th day of June 2018.
A.H
Attorney for ldaho Power Company
IDAHO POWER COMPANY'S RESPONSE TO THE SECOND
PRODUCTION REQUEST OF THE COMMISSION STAFF - 7
(
CERTIFICATE OF SERVICE
I HEREBY CERTIFY that on the 25th day of June 2018 lserved a true and
correct copy of IDAHO POWER COMPANY'S RESPONSE TO THE SECOND
PRODUCTION REQUEST OF THE COMMISSION STAFF upon the following named
parties by the method indicated below, and addressed to the following:
Commission Staff
Edith Pacillo
Deputy Attorney General
ldaho Public Utilities Commission
472 West Washington (83702)
P.O. Box 83720
Boise, ldaho 83720-0074
lndustrial Customers of ldaho Power
Peter J. Richardson
RICHARDSON ADAMS, PLLC
515 North 27th Street (83702)
P.O. Box 7218
Boise, ldaho 83707
Dr. Don Reading
6070 Hill Road
Boise, ldaho 83703
ldaho !rrigation Pumpers Association, lnc
Eric L. Olsen
ECHO HAWK & OLSEN, PLLC
505 Pershing Avenue, Suite 100
P.O. Box 6119
Pocatello, ldaho 83205
Anthony Yanke!
12700 Lake Avenue, Unit 2505
Lakewood, Ohio 44107
ldaho Gonseruation League
Benjamin J. Otto
ldaho Conservation League
710 North Sixth Street
Boise, ldaho 83702
Ch
IDAHO POWER COMPANY'S RESPONSE TO THE SECOND
PRODUCTION REQUEST OF THE COMMISSION STAFF - 8
X Hand Delivered
_U.S. Mail
_Overnight Mail
_FAXX Email edith.pacillo@puc.idaho.gov
_Hand DeliveredX U.S. Mail
_Overnight Mail_FAXX Email peter@richardsonadams.com
_Hand DeliveredX U.S. Mail
_Overnight Mail
_FAXX Email dreadinq@mindspring.com
_ Hand DeliveredX U.S. Mail
_ Overnight Mail
_ FAXX Email elo@echohawk.com
_ Hand DeliveredX U.S. Mail_ Overnight Mail
_ FAXX Email tonv@yankel.net
_Hand DeliveredX U.S. Mail
_Overnight Mail_FAXX Email botto@idahoconservation.orq
rry,Lega